Transcript Slide 1
Ethiopian Roads Authority ROAD ASSET MANAGEMENT PERFORMANCE AND THE WAY FORWARD Road Asset Management Department August 2013 1 Content Introduction 2005 EFY Accomplishment 2006 EFY Plan The Way Forward Introduction Road assets are economic resources that provide services to the public Asset management is the process for managing these assets. Objectives of road asset management ◦ To ensure continued and effective provision of road network to road users ◦ support of national economic development ERA has been implementing asset management to maintain, upgrade, and operate the physical assets systematically through cost-effective methods Introduction Cont. Road Asset Management Department Tasks Collect and organize data required for road network management Make road condition assessment and gap identification Prioritize and optimize works based on network classification Administer and improve PMS and road classification system Paved Road Condition Survey Equipment Introduction Cont. Road Asset Management Department Tasks Administer and improve BMS Collect bridge condition Data Prepare Bridge maintenance and replacement plan Introduction Cont. Road Asset Management Department Tasks Protect road and bridge from damage due to excessive loads Introduction Cont. Road Asset Management Department Tasks Control and manage the situation that interrupt road transportation Introduction Cont. Road Asset Management Department Tasks 10 RNMDs Network administration Prepare annual requirement Administer Road maintenance projects Conduct seasonal Traffic count maintenance plan and budget Introduction The federal road network length has grown from 13,000 Km to 25,756km 44% is paved while 56 % is unpaved 30000 Asphalt Total 25756 24550 25000 21849 Road Lenght in Km 20429 20000 18540 16000 16074 19313 16617 15000 11301 9875 10000 7476 6066 5000 3760 3824 4053 5002 4635 0 1998 2000 2002 2004 Year 2006 2008 2010 2012 2013 2005 EFY Accomplishment Routine Maintenance 11,569 km road was planed & 11,738 km achieved Financially accomplishment 440,792,570 ETB Percentage 101 Plan Actual 2 500 2 000 2 102 2 011 1 563 Road Lenght in Km 1 500 1 364 1 262 1 174 1 244 1 143 1 189 1 183 1 044 982 1 000 924 943 1 052 984 1 037 910 604 592 500 Alemgena Adigrat Combolcha Debre Markos Gonder Shashemene RNMD Nekemt Dire Dawa Jimma Sodo 2005 EFY Accomplishment Cont. Labour Based Maintenance 2,906 km road was planed & 2,567 km achieved Financially accomplishment 13,013,120 ETB Percentage 88 Plan 600 498 Road Length in Km 500 400 300 Actual 568 357 314304 351 346 340 321 300 260 200 250243 166160 151 99 105 90 100 249 Alemgena Adigrat Combolcha Debre Markos Gonder Shashemene RNMD Nekemt Dire Dawa Jimma Sodo 2005 EFY Accomplishment Periodic Maintenance 726 km road was planed on 39 Projects and 816 km achieved Financially accomplishment 410,166,978 ETB Percentage 112 Plan 160 140 Actual 134 130 Road Length in Km 120 100 98 97 92 90 85 79 80 72 91 89 72 73 60 60 52 55 55 52 40 35 30 20 Alemgena Adigrat Combolcha Debre Markos Gonder Shashemene RNMD Nekemt Dire Dawa Jimma Sodo 2005 EFY Accomplishment OPRC Maintenance 16 projects planed to be done by E.R.C.C For pilot projects contractors were not found The planed projects by E.R.C.C were done by Routine Maintenance Plan Actual 600 539 Length in Km 500 447 400 342 331331 300 281 261 230 202 200 168 229240 190 159 205 171 115 100 86 90 69 Alemgena Adigrat Combolcha Debre Markos Gonder Shashemene Nekemt RNMD Dire Dawa Jimma Sodo 2005 EFY Accomplishment Bridge Maintenance Planed 188 Bridges & 59% accomplished ERCC is not interested to maintain the bridges Small scale contractors training 2005 EFY Accomplishment Cont. 2005 EFY Physical Accomplishment It. No Project Name To be Maintained in 2005 Unit EFY Year to Date Plan Actual % 1 Routine Maintenance Km 11,569 11,569 11,738 101 2 Labour Based Maintenance Km 2,906 2,906 2,567 88 3 Periodic Maintenance Km 726 726 816 112 4 OPRC Maintenance Km 2,435 2,435 2,251 92 5 Bridge Maintenance % 100 100 59 59 17,636 17,636 17,372 99 Total 2005 EFY Accomplishment Cont. Overlay Projects Physical Accomplishment Year to Date It. No Project Name Unit Plan Actual % 1 Adama - Awash Overlay Project Km 25.00 1.34 5.37 2 Awash - Mille Overlay Project Km 30.00 14.6 48.57 Km 10.00 7.2 72.42 Km Km 10.00 8.00 14.81 10.02 148.10 125.20 4 5 Addis - Gibe Asphalt Road Overlay Project Addis Chanch - Gohatsion Asphalt Road Overlay Project B/ Dar - Gondor Overlay Project 6 Elidar - Bure Km 20.00 23.0 115.00 7 Awash - Kulubi - Dire Dawa Km 5.00 4.00 80.00 8 Adigudom - Mekele - Wukro Km 5.00 0.00 0.00 9 Paving Town Section Km 50.00 33.78 67.56 163 109 67 3 Total 2005 EFY Accomplishment Cont. Pavement Management Road condition survey conducted on 5,670 km of Road 2006 Budget preparation Preparation of TOR for various projects Follow up of maintenance projects Progress monitoring and evaluation Bridge Management Follow up of bridge master plan Follow up of Bridge Management Support service consultants accomplishment Updating of central database Updating of bridge maintenance specification 2005 EFY Accomplishment Cont. Emergency works Construction of temporary bailey bridge for emergency cases Construction of flood protection works (Gedo – Bako) Support ERA’s research projects Abay gorge slide Protection works have been done by the support of JICA Muketuri – Alemketema slide protection work Axle Load Control Weighted 174,580 Axle & Over Weighted 34,916 Axle Out of the total weighted 20% is overloaded Consultant is hired to make the system automated Training for workers on ethics and accountability Awareness creation for stakeholders Challenges Shortage of maintenance budget Shortage of machinery to perform maintenance works Shortage of asphalt Reluctance to undertake bridge maintenance and other small works Difficulties to implement OPRC projects Right of way problem Missing of traffic signs Quality of roads transferred from RRA Axle load enforcement 2006 EFY Plan ERA planed to done maintenance work on 18,575 km of road Routine Maintenance 16,867 km Periodic Maintenance 985 km Bridge Maintenance on 416 Bridges OPRC Maintenance 723 km Seven overlay projects Paving town section on 80 km 2006 EFY Plan Cont. It. No. Description Total Length Allocated Budget 1 Routine Maintenance 16,867 513,200,000 2 Periodic Maintenance 985 362,850,000 3 OPRC Maintenance 723 27,600,000 4 Other Works Total 27,500,000 18,575 931,150,000 OPRC Supervisi Routine Maintenance Periodic Maintenance Maintenance on Total It. Length in Length in Length in Length in No. RNMDs Km Budget Km Budget Km Budget Budget Km Budget 1 Alemgena 2,226 84,300,000 197 75,100,000 395 11,000,000 13,400,000 2,818 183,800,000 829 25,500,000 48 13,100,000 110 3,400,000 3,800,000 987 45,800,000 3 Combolcha Debre 4 Markos 1,708 54,300,000 100 29,950,000 6,500,000 1,808 90,750,000 1,719 41,800,000 155 40,500,000 4,000,000 1,874 86,300,000 5 Gonder 1,285 31,100,000 163 36,300,000 5,400,000 1,448 72,800,000 6 Shashemene 1,961 40,500,000 148 35,200,000 70 3,000,000 6,100,000 2,179 84,800,000 7 Nekemt 1,201 27,500,000 77 22,200,000 62 2,000,000 2,800,000 1,340 54,500,000 8 Dire Dawa 2,768 52,500,000 100 37,000,000 7,100,000 2,868 96,600,000 9 Jimma 1,687 81,600,000 80 26,000,000 5,700,000 1,767 113,300,000 1,483 44,600,000 70 21,500,000 5,700,000 1,639 75,000,000 2 Adigrat 10 Sodo 86 3,200,000 11 Otheres Total 27,500,000 16,867 483,700,000 1,138 336,850,000 723 22,600,000 60,500,000 18,728 931,150,000 The Way Forward All maintenance works are managed as projects Contract signing with ERCC All maintenance works are to be supervised by consultants Road safety issues should be addressed Capacity building for RNMDs (training, staff, facility) Improvement of axle load control works (training, staff, facility) Knowledge of road network condition by RNMDs Ten maintenance projects will be undertaken by private contractors The Way Forward 20 small scale contractors participated in bridge maintenance 26 small scale contractors will participate on paving town section construction and asphalt road maintenance Awareness creation maintenance Consultant for road management support service Revise road maintenance specification Conduct monthly evaluation meeting with RNMDs Resolve hindrances stakeholders to stakeholders identified by on auditors road and The Way Forward Modernization Modernization of Road Asset Management System ◦ Establish Road Location Referencing System ◦ Road Asset Valuation ◦ Develop Traffic Sign and Pavement Marking Management System ◦ Develop Road Asset Management Policy and Strategy ◦ Establish road and Bridge data exchange system ◦ Integrate Road Asset Management System ◦ Develop Road Asset Management Plan Bridge management system Modernization The Way Forward Modernization of Axle load Control System Modernization (Cont.) Modernization (Cont.) Modernization (Cont.) Modernization (Cont.) Modernization (Cont.) The Way Forward Roughness Value and Threshold IRI (m/km) Road Type Trunk Base line Target Asphalt (AC) 4.5 2.5 Asphalt (AC) 4.5 2.5 Asphalt (Surface Treatment) 6.0 3.0 Gravel 11.0 9.0 Asphalt 4.5 3.0 Asphalt (Surface Treatment) 6.0 4.0 Gravel 11.0 9.0 Collector Gravel 14.0 11.0 Feeder Gravel 19.0 14.0 Link Main Access Benchmarking of Road Service Level Performance I.N Area of Measuremen o improvem t/objective ent verifiable indicators 1 ERA (existing ) Practice (value) Customers & Stakeholders Need Road Asset Good % of 60% is in 100% Condition( the Asphalt good Condition Asphalt) Road condition 2 Good % of 55% is in Road Asset 100% the Gravel good Condition( Condition Road condition Gravel) Possible Best Practice (stretched, Benchmarked) Goals 80% of the Should not be less Good network shall be than 80% of the in good condition network Good Should not be less than 60% of the single segment N/A 3 Riding Quality (Asphalt) 4 Riding Quality (Gravel) Smooth Comfortable = Comfortable Road road & Paved Average IRI Paved AC < 2.5m/km Value (For the 3.05 m/km ST < 3.5 m/km network as well as single road segment Unpaved = Smooth & Unpaved = or link) Comfortable Road 14.05 m/km Comfortable road 8.0m/km Benchmarking of Road Service Level (Cont.) Performance ERA I.N Area of Measuremen Customers & (existing ) o improvem t/objective Stakeholders Practice ent verifiable Need (value) indicators 5 Accidents caused by No. Traffic No. of Traffic road defects Safety Accident Accidents are not known 6 Overloadin 32%overloa % overloaded No. Overloading g ded axles axles 7 Right of Intrusion of Right of way of road foreign Way are not properties protected 8 Proper attention is Environme Environmenta not given for nt l degradation environment al issues Possible Best Practice (stretched, Benchmarked) Goals There should be no traffic accident related to road defects No traffic Accident due to lack of proper asset management --- No overloading (except overloading with temporary permit) No Intrusion No intrusion with No intrusion of within Right of in the right of way foreign properties way of existing roads Any projects has Road preservation Well protected to be executed in should be done in environment environmental friendly way friendly manner THANK YOU