Slajd 1 - PL-Grid
Download
Report
Transcript Slajd 1 - PL-Grid
Polish Grid
Polish Grid:
National Grid Initiative
in Poland
Jacek Kitowski
Institute of Computer Science AGH-UST
ACK CYFRONET AGH
Cracow Grid Workshop, October 15-17, 2007
Polish Grid
Content
Polish Grid (PL-Grid)
Foundations
Infrastructure
Generic Architecture
Grid Structure
PL-Grid Project
Aims
Workpackages
Sample problems
Collaboration with EGI_DS
Cracow Grid Workshop, October 15-17, 2007
2
Polish Grid
PL-Grid Initiative Foundations
Response to the needs of Polish scientists and ongoing Grid activities
in Poland, other European countries and all over the world
SGI Grid, Progress
(Clusterix, National Data Store ...)
National
European
e-Infrastructure
International
2000 Testbeds
Chemomomentum, Virolab, CoreGrid, Gredia,
int.eu.grid, Baltic Grid, GridLab,
Porta Optica, RINGRid, Phosphorus,
RoutineIntelligrid,
Usage K-WfGrid, Unicore...
QoSCoSGrid,
2010 Utility Service
Evolution of European Grid infrastructure development within the space of years
Cracow Grid Workshop, October 15-17, 2007
3
Polish Grid
PL-Grid Initial Activities
Creation of Polish Grid
(PL-Grid) Consortium
Agreement signed in January
2007
Preparation of PL-Grid Project
(2008-2010, 2011-2013)
Consortium made up of five
largest Polish supercomputing and
networking centres (founders)
GEANT2
Academic Computer Center Cyfronet AGH (ACK CYFRONET AGH) – Coordinator
♦ Poznań Supercomputing and Networking Center (PCSS)
♦ Wrocław Centre for Networking and Supercomputing (WCSS)
♦ Academic Computer Center in Gdańsk (TASK)
♦ Interdisciplinary Center for Math. and Computat. Modelling, Warsaw University (ICM)
♦
Cracow Grid Workshop, October 15-17, 2007
4
Polish Grid
PL-Grid motivation and aims
e-Science approach to
research
PL-Grid vision:
Computer experiments To enable realization of e-Science model in
various
scientific
fields through:
Huge, distributed and diversely
structured
data
• Creation of a stable Grid infrastructure fully
Tools for data accessing, integration
and processing
compatible
and interoperable with European
and World Grids thanks to cooperation (EGEE,
Versality of disciplines:
•
•
•
•
•
•
•
•
•
DEISA, OMII, C-OMEGA, ESFRI),
physics, astronomy, astrophysics,
• Ensuring the operation of this infrastructure in
chemistry,
the production mode,
biology, bioinformatics,
• Enabling the operation of domain Grids,
meteorology, climatology,
• Using and propagating Grid standards,
medicine,
• Adjusting PL-Grid to user needs,
Earth sciences,
• Integration, testing and installation of software
advanced text processing,
produced by leading Grid Projects (Polish and
processing and management ofinternational),
knowledge,
• Organization of support for PL-Grid users
e-learning.
(training, helpdesk, consultations),
• PL-Grid management.
Cracow Grid Workshop, October 15-17, 2007
5
Polish Grid
PL-Grid Infrastructure
Assumptions
Polish Grid will have a common base infrastructure
– similarly to solutions adopted in other countries
Specialized, domain Grid systems – including
services and tools focused on specific types of
applications – will be built upon this infrastructure.
Cracow Grid Workshop, October 15-17, 2007
6
These domain Grid systems can be further developed and maintained in the
framework of separate projects. Such an approach should enable efficient
use of available financial resources.
Application
Domain
Grid
Domain
Grid
Domain
Grid
Application
Application
Advanced Service Platforms
Application
Polish Grid
PL-Grid infrastructure
Domain
Grid
Grid infrastructure (Grid services)
PL-Grid
Clusters
High Performance Computers
Data repositories
National Computer Network
PIONIER
Cracow Grid Workshop, October 15-17, 2007
7
Polish Grid
PL-Grid Structure
PL-Grid infrastructure will be a base for specialized, domain Grid systems
- including services and tools focused on the specific types of applications
Users
Grid
Application
Programming
Interface
Grid portals, development tools
Virtual organizations and
security systems
LCG/gLite
(EGEE)
Grid
services
UNICORE
(DEISA)
Other
Grids
systems
Basic Grid services
Grid
resources
Distributed
data
repositories
National
computer
network
Distributed
computational
resources
Cracow Grid Workshop, October 15-17, 2007
8
Polish Grid
PL-Grid Structure
PL-Grid software will comprise:
user tools (portals, systems for applications management
and monitoring, result visualization and other purposes,
compatible with the lower-layer software used in PLGrid);
software libraries;
virtual organization systems: certificates, accounting,
security;
data management systems: metadata catalogues, replica
management, file transfer;
resource management systems: job management,
applications, grid services and infrastructure monitoring,
license management, local resource management.
Cracow Grid Workshop, October 15-17, 2007
9
Polish Grid
Planned realization of aims: PL-Grid Project
The PL-Grid Project is split into several workpackages
P1
PROJECT MANAGEMENT
Coordination
P2
PLANNING AND
DEVELOPMENT
OF INFRASTRUCTURE
Structure
Operation Rules
Dissemination
P6
P3
OPERATIONS CENTER
P5
P4
GRID SOFTWARE
AND USERS
TOOLS DEVELOPMENT
SECURITY CENTER
EGEE
DEISA
….
SUPPORT FOR VARIOUS
DOMAIN GRIDS
Training
Cracow Grid Workshop, October 15-17, 2007
10
Polish Grid
PL-Grid Workpackages
Project management (including structure and
dissemination) –
coordinated by ACK CYFRONET AGH (Kraków),
Planning and development of infrastructure –
TASK (Gdańsk),
Operations Center – ACK CYFRONET AGH
Grid Software and Users Tools development –
PCSS (Poznań),
Support for domain Grids – ICM (Warsaw),
Security Center – WCSS (Wrocław)
Cracow Grid Workshop, October 15-17, 2007
11
Polish Grid
WP3: PL-Grid Operations Center’s tasks
Cracow Grid Workshop, October 15-17, 2007
12
Polish Grid
WP4: Grid Software and Users Tools
WP4: development
Software repository
Framework for application development
High-level virtual organizations using knowledge
Resource virtualization for VO
Semantic information on experiments
Integration of software components
VO and resource management
Legacy codes adaptation
Knowledge supported data access
Cracow Grid Workshop, October 15-17, 2007
13
Polish Grid
Examples for potential use
HEP – WLCG
Computational chemistry – Gaussian,
Turbomole .....(Charmm, Amber,
DL_POLY..)
Biology/Pharmacy – proteins ...
Meteorology
Complex systems (multiagent games...)
Cracow Grid Workshop, October 15-17, 2007
14
Polish Grid
Networking and computational
infrastructure of Polish Tier2 for WLHG
Cracow Grid Workshop, October 15-17, 2007
15
GAUSSIAN in Grid
Enabling Grids for E-sciencE
• Gaussian VO created supported by 2 Partners (EGEE
activity)
• Accepted by Vendor
• Registration:
https://voms.cyf-kr.edu.pl:8443/vo/gaussian/vomrs
• VO Manager: Mariusz Sterzel
(CYFRONET),
EGEE II Comput. Chemistry
coordinator
[email protected]
EGEE-II INFSO-RI-031688
ACK: Tomasz Szepieniec
[email protected]
Never Born Protein Folding
Enabling Grids for E-sciencE
Prof. Irena Roterman
interest (CM UJ)
also EUChinagrid
EGEE-II INFSO-RI-031688
ACK: Tomasz Szepieniec
[email protected]
Polish Grid
Present Partners’ Resources
# Processors, Peak Performance (GFlops) and RAM (GB)
CYFRONET
ICM UW
PCSS
CI TASK
proc.
Rpeak
RAM
proc.
Rpeak
RAM
proc.
Rpeak
RAM
proc.
SMP
204
1080
368
60
664
192
224
845
328
128
Clusters
650
8399
1729
500
3400
1036
380
3188
1068
Total
854
9479
2097
560
4064
1228
604
4033
152
5666
End 2007
Rpeak
WCSS
RAM
proc.
768
512
136
780
264
288
3226
2304
256
3600
768
1396
416
3994
2816
392
4380
1032
912
1344
50000
5376
272
13077
2792
Cracow Grid Workshop, October 15-17, 2007
Rpeak
RAM
18
Polish Grid
Collaboration with EGI-DS
Use cases identification
1. INFRASTRUCTURE-ORIENTED
1.1. Release of New Grid Middleware
1.2. Adding new NGI/EGI site
1.3. Functionality Alert at some NGI site
1.4. Resources negotiation for VO
2. APPLICATION-ORIENTED
2.1. QoS bandwidth demand
2.2. LHC on-line filtering
2.3. Commercial application with license server
2.4. Parallel application
3. END USER-ORIENTED
3.1. Privately funded hardware
3.2. Single user with no VO assignment needs to enter the Grid
Active participation in EGI Workshop in Budapest (2.10.07)
Cracow Grid Workshop, October 15-17, 2007
19
Polish Grid
Conclusions
Initial stage achieved
Agreement signed
Scientific Council established
Management Board
Proposal prepared
Cracow Grid Workshop, October 15-17, 2007
20