BGS-CIEP Rate - Energy Components (Continued)
Download
Report
Transcript BGS-CIEP Rate - Energy Components (Continued)
BGS-CIEP Rate - Energy Components
(Continued)
• Ancillary Services Charge
– For PJM administrative charges and;
– Other generation-related items necessary for electric grid
stability.
– Charge is from a PJM Tariff.
• BGS Reconciliation Charges
– Recovers the difference between monthly amount paid to
BGS suppliers and the total revenue received from BGS
customers for the preceding months for the applicable BGS
supply.
– Charge changes each quarter and can be a positive or
negative (e.g. a charge or a credit).
• All Charges subject to sales and use tax (SUT).
BGS-CIEP Rate – Capacity
Components
• BGS Capacity Charges (Generation)
– Charges per kilowatt of Generation Obligation.
– The charge recovers customer’s allocated share of overall
summer peak load on PJM system.
– Rate obtained through BGS Auction. It is the only
component BGS suppliers bid on.
• BGS Transmission Charges
– Approved by FERC.
– Recovers Customer’s share of overall summer peak
transmission load assigned to JCP&L (or other EDC).
– Billed on a per kWh basis.
– Subject to change periodically on the effective date of the
PJM rate as approved by Federal Energy Regulatory
Commission (FERC).
Applicable Riders
• Default Supply Service Availability Charge:
(DSSAC) Cost to administer and maintain hourly priced
default service for BGS-CIEP customers. Associated
revenues passed through by JCP&L to Suppliers. NOTE:
DSSAC set to $0.000/kWh for the 12 month period
beginning June 1, 2005
• System Control Charge (SCC): Recovers cost
associated with Demand Response Programs.
Data Sources
Types of customer load data
available from JCP&L
Monthly load data, including kWh, kW, and
capacity peak load share is available at no cost.
• Hourly interval kW data, if appropriate
customer metering is available, can be
requested at $40.00 per account.
• Monthly paper service ($132/year)
• Monthly email service ($108/year)
• Data pulses from your meter
Requesting Monthly or
Hourly load data for
“shopping”
• Call JCP&L Customer Interaction Center (CIC)
at 1-800-543-4655
• Have your 20-digit customer number available
• Give authorization to send your monthly or
hourly load data to the electric generation
supplier of your choice.
Requesting Monthly or Hourly
Load data for Shopping
Have supplier call Supplier Services at 1-440546-8667 to request your monthly or hourly load
data.
Supplier must have signed authorization giving
JCP&L permission to provide them with this
confidential information.
Supplier Services will request the supplier to fax
the authorization form before data is sent via
email.
Electronic Data Interchange
(EDI)
• Certified electric generation suppliers can
request monthly usage data (not hourly data)
electronically via an EDI 814HU transaction.
• Data will be returned to supplier via EDI 867HU
transaction within one business day.
• Supplier must have Customer authorization prior
to requesting data.
Other Information Sources
E-Mail, [email protected] or Phone
440-546-8667
Website;
http://www.firstenergycorp.com/supplierservices
Website; http://www.firstenergycorp.com/customerchoice
Website; http://www.bpu.state.nj.us/
INSERT LINK TO SUPPLIER INFO SHEET
Website; http://www.pjm.com
Website; http://www.njcleanenergy.com/
Shopping Alternatives
Locating a licensed Electric
Generation Supplier
Go to BPU website for up to date listing of
Suppliers:
– http://www.bpu.state.nj.us/wwwroot/energy/G
PUlist.htm