Transcript Document
1 Confidential | Copyright © 2014 TriZetto Corporation Operational/Automation Analysis Samantha Goff – UMR Operations Manager Susan Bostick – TriZetto Business Consultant 2 Confidential | Copyright © 2014 TriZetto Corporation UMR - Pursuit of Continuous Improvement UMR initiated a cross functional work group focused on improving auto adjudication The team identifies opportunities for updates through: Updates to business configurations, Modifications to existing workflows and processes and/or Solutions that require programming support. The team evaluates auto adjudication at the directory level and plan level. The team identifies new opportunities; prioritizes identified solutions based on business need and projected impact; and monitors impact of implemented solutions. 3 Confidential | Copyright © 2014 TriZetto Corporation Directory Level Auto Adjudication Review Directory level review evaluates: Overall auto adjudication rates by directory and benefit type Utilization of claim comments and line comments Auto adjudication based on specific codes (benefit code, procedure category, diagnosis category, procedure code, etc.) Recommendations received by team members Directory level review results in: Updates implemented through business configurations Updates that require programming support to improve auto adjudication 4 Confidential | Copyright © 2014 TriZetto Corporation Plan Level Auto Adjudication Review Plan level review evaluates: Volume of members with comment codes in EM/EDM Auto adjudication based on benefit type and benefit code Utilization of claim comments and line comments Plan level review results in: Updates to current benefit configuration we can implement with business configurations without updates to the benefit design of the plan Provide recommendations for benefit design updates to consider implementing in the future that would support increased auto adjudication Updates that require programming support to improve auto adjudication 5 Confidential | Copyright © 2014 TriZetto Corporation Automation Review Request The auto adjudication team recommended support from TriZetto to complete an analysis and provide recommendations Feedback from the TriZetto perspective would help to: Identify opportunities to improve current configurations Review functionality available in future release to implement Evaluate existing processes and workflows Automation review included detailed analysis of a sample of plans Plans selected based on claim volume, current auto adjudication rate, and specific benefits that are common or difficult to administer UMR provided plan benefit information, code configuration information and auto adjudication baseline amounts for the plans 6 Confidential | Copyright © 2014 TriZetto Corporation TriZetto Review and Preparation for Onsite Meetings 7 Confidential | Copyright © 2014 TriZetto Corporation TriZetto Review & Preparation Primary goal was to identify ways to gain efficiencies through system setup changes, workflow process changes and automation improvements Comprehensive review of client identified plans Focus on plan structure & standardization Build accuracy and proper use of system functionality Comprehensive review of CBX table for specified plans 8 Confidential | Structure Features utilized (COI & Copay override, Seq messaging etc) Plan exception usage Was automation maximized Copyright © 2014 TriZetto Corporation TriZetto Review & Preparation Claim Workflow system setup Evaluated how system responses were established in claim workflow programs (CBSX, CECM, CEPM) How system was established Up-to-date on code loads (Diagnosis/CPT/HCPCS) Code categorization – extent of breakdown Modifiers established (GMP & MMD-CM) Calculation parameters 9 Confidential | Copyright © 2014 TriZetto Corporation Onsite Collaboration Session with TriZetto and UMR teams 10 Confidential | Copyright © 2014 TriZetto Corporation Onsite Automation Review Susan traveled to the UMR office in Onalaska, Wisconsin to facilitate work sessions for a week with representatives from the UMR teams: Claim operations, plan coding, Eligibility, Repricing, IT During the work sessions, we reviewed: Current configuration set-up for the plans provided Reviewed business work flows and business rules that contribute to our current configuration design The sessions provided an opportunity to exchange feedback, ask questions and collaborate on alternative solutions to consider. 11 Confidential | Copyright © 2014 TriZetto Corporation On- Site Review Plan Builders – discuss workflow New business versus plan changes Ways to streamline plan building Discussed perceived automation inhibitors Review dental plan setup to minimize work effort Discussed analysis findings CBX workflow & modification recommendations Use of new/existing functionality How to monitor automation improvements 12 Confidential | CECM- field 14-display routing errors only CECM- field15- update workflow audit trail Assess Claim Exception Listing (CER) ClaimWorkflow Audit Inquiry (CBAUDTI), monitor 1st pass Copyright © 2014 TriZetto Corporation TriZetto Recommendations 13 Confidential | Copyright © 2014 TriZetto Corporation TriZetto Recommendations After the sessions, Susan prepared a report that included her recommendations and observations. She acknowledged the areas where the current configuration and workflow were optimal to support our current business needs with no improvements identified. She presented recommendations for updates to consider to current configurations to support increased flexibility and auto adjudication. In addition, she presented recommendations for updates to consider to current workflows to increase productivity and efficiency. 14 Confidential | Copyright © 2014 TriZetto Corporation After the Onsite Collaboration Session 15 Confidential | Copyright © 2014 TriZetto Corporation Automation Review Action Plan UMR created an action plan based on the automation review results Feedback from work sessions incorporated into plan Recommendations TriZetto automation report added to plan Action plan captured recommendations to implement immediately, updates to implement in the future, and track our progress with implementation of changes that were a result of the analysis. 16 Confidential | Copyright © 2014 TriZetto Corporation TriZetto Recommendations Updates implemented impact: Plan testing process updated to minimize impacted claims and support increased auto adjudication Implemented updates to CEPM, GADP, CBX records to support increased auto adjudication Enhance code categorization in MM to support increased flexibility and auto adjudication Updates identified for implementation in the future: Refine claim processing workflow to further leverage mailbox routing and use of the ‘g’ option Evaluate use of plan exception codes to identify root cause, decisions required, and solutions to eliminate the need to manually process the claims Review system capabilities after upgrade (PMCR, DVT, etc.) 17 Confidential | Copyright © 2014 TriZetto Corporation Keep appraised QicLink changes Point person(s) to stay current on system changes to QicLink Customer Exchange – disseminate the information Review upgrade release information Review PAR listings How-To-Section Did you know videos ICD-10 Corner QicLink e2 Corner Exception processing-How to & what not to do Take advantage of annual conference presentations Minicasts and Webinars 18 Confidential | Copyright © 2014 TriZetto Corporation Workshop Survey We would like to extend you an opportunity to provide candid feedback. During the workshop you should have received an e-mail notification for you to take an on-line survey. If you could take a few minutes to complete at this time , we would greatly value your feedback. For your convenience, the survey will be available throughout the remainder of the conference should you not be able to complete immediately. 19 Confidential | Copyright © 2014 TriZetto Corporation Thank You! 20 Confidential | Copyright © 2014 TriZetto Corporation