ISE 6 Phase 2 Demo Scenario

Download Report

Transcript ISE 6 Phase 2 Demo Scenario

ISE 6 Phase 2 Demo Scenario

Nov 20, 2008

Stakeholders •

ISEA – NSWC PHD (Combat Systems) – NSWCCD SSES (HM&E)

Program Offices – PMS 500, etc.

– IWS 1 (Combat Systems) – IWS 2 (Above Water Sensors) – PEO Ships

Policy Makers – NAVSEA 04L – OPNAV N40

Shipyards (Acquisition and Planning Yard) 2

Invitation List • • • • • • • • • •

Jim Colson (Army LOGSA) 04L - Bernie Coval, Tim Kriegal, Bucky Buchanan ISW1 – Jolene Marshall, CAPT Mall ISW2 – Noel Smith, PMS 500 – Cheryl Smorto, – Claude Barrens (CGX ship design manager) NAVSSES – Joe Picossi PHD – Troy Sutton, Fabio Vitale, CAPT Ruehlin PEO Ships PEO Subs PEO Carriers 3

Demo Date • •

Phillys in DC April 13-16 Easter is April 12 4

Process Improvements

• • • • Exchange of integrated design and logistics product data – Between Design and Logistics – Between ISEA, NAVSEA 05, Shipyards, and OEMs – Throughout full life cycle (currently only in acquisition) Standardized data exchange formats – Neutral format IDE data – Improved quality and reduced cost through standardized schema and automated validation/exchange – Enable data reuse Automated identification of change impacts – Reduce costs to evaluate changes – Support cost benefit analysis, design trade studies, etc. – Impact of design or logistics changes Enables Virtual Navy Enterprise 5

LSA R OEM (RSC) Revised Radar Collaboration Develop ECR

As-is Scenario

Authorization, Funding Program Office Authorization, Funding Update Design and Logistics LSA R ISEA (PHD) Revised Radar Data Revised HM&E Data Program IDE Identify Changes Mod 2 Radar Shipyard / NAVSSES Update Design and Logistics Changes NDE-FMP NAVICP WSF CDMD OA TDMIS Navy S1000D Database (Content@) LEAPS

Demo Scenario

Authorization, Funding Program Office(s) OEM (RSC) LSA R Collaboration Develop ECR Revised Radar

AP 239 + S1000D

Update Design and Logistics LSA R ISEA (PHD) Revised Radar Data

AP 239 + S1000D

Authorization, Funding Program IDE Revised HM&E Data

AP 239 + S1000D

Identify Changes Shipyard / NAVSSES Update Design and Logistics Changes

AP 239 + S1000D AP 239 + S1000D

PLCS NDE-FMP NAVICP WSF CDMD OA TDMIS Navy S1000D Database (Content@) LEAPS

LSA R OEM (SIR)

AP 239 + S1000D

Revised Radar

Demo Scenario by System

Authorization, Funding Program Office(s) Need to add S1000D repository From OEM and Shipyard

S1000D modules

Authorization, Funding Collaboration Develop ECR Update Design and Logistics LSA R ISEA (episTree) Revised Radar Data

AP 239 + S1000D

Program IDE (Teamcenter) Revised HM&E Data

AP 239 + S1000D

Identify Changes Shipyard / NAVSSES Update Design and Logistics Changes

AP 239 + S1000D AP 239 + S1000D

PLCS Navy S1000D Database (Content@) CDMD OA TDMIS NDE-FMP NAVICP WSF LEAPS

In-service Ship Alt • •

PEO authorization SHIPMAIN coordinates development of Alt – ISEA develops Alt for radar system • ISEA submits ECR to OEM • Update design (drawings) • Update logistics (ILS) – Planning yard / NAVSSES develop Alt for HM&E • Update design (drawings) • Update logistics (ILS)

Current Issues •

Investigate LOGSA LSAR DEX – Tim, Ted, Mike 10

Clarifciations •

Separate Ship Constructor demo – Maybe ShipTech – Different audiuence – 2 nd tier yards 11

Demo Data • •

Content@ DB – John Crehan to work with Bernie – End of Jan – link from RSC is operational to deliver modules • Fall back plan – manually add to Content@ Dual Band Radar – Receiver Exciter (REX) Spy 3 • 30 data modules • Functional description, Removal, Procedure, graphics – John Crehan provide metadata by Dec 5 – Matt P. – acquire LCB data, including HSC numbers 12

Demo Data •

HM&E system – Use AC system (514) – Use AC Plant #1 (51421) – Change the motor (514212122) and compressor (514212121) – Mike talk to Harold Roll about S1000 DM for AC plant – Ben – find additional VFI tech data for motor and compressor • Tim – find out who has S1000D data for LPD 17 motors – Populate data sheet – CAD model for equipment • Could export from CATIA • Need GUIDS for LEAPS • Mike – Provide STEP files for distributed systems 13

Previous Demo Planning Slides

14

ISE 6 Phase 2 Demo Scenario

• • Initial Data Exchange and Load – Export selected HVAC system from LPD IDE as PLCS data with links to S1000D data modules – Export selected Dual Band Radar (DBR) system from NSWC PHD/Raytheon (System TBD) as PLCS data with links to S1000D data modules – PLCS data modified to allow import into DDG 1000 IDE – PLCS data imported into DDG 1000 IDE – S1000D data and publication modules for HVAC and DBR delivered to Navy Common Source Data Base (CSDB) Change Management – New Mod of Dual Band Radar is developed and authorized for use – New radar cabinets generate more heat, require additional cooling in the space – New cooling requirements passed to Shipyard Engineering – HVAC system is redesigned – Affected S1000D data modules for HVAC and DBR system Technical Manuals are updated – HVAC and DBR system Technical Manuals updated – Updated design passed to LEAPS 15

PLCS & S1000D: Functional Scenario

Shipyard A IDE (Design, Logistics, Support) Navy IDE (Design & Analysis) Data Prep & QA (Design, Logistics, & CAD) Navy ISEA (GFE Change) Shipyard B Design (3D CAD Data) Shipyard B IDE (Update Tech Pub) 16

PLCS & S1000D: Exchange Scenario

Shipyard A IDE AIM/SIR LPD 17 IPDE Software AP 239 + S1000D Navy IDE LEAPS Navy Design & Analysis Repository S1000D Modules Knowledge Management NAVSEA / NSWCCD Common Source DB S1000D Modules Content@ episTree Software AP 239 + S1000D Candidate Data Module Updates AP 239 + S1000D Shipyard B IDE Teamcenter DDG 1000 IDE Software Ship Alt Changes AP 214 HVAC 3D Design Design Shipyard NAVSEA / Navy ISEA TBD System New Support Requirements CAD Tool

17

PLCS & S1000D: Data Scenario

Shipyard Design & IDE HVAC Sys HVAC Sys Drawing1 HVAC Sys Drawing2 HVAC Ducts Duct 1 Duct 2 Chillers Chiller 1 Chiller 2

DM 1.1

DM 1.2

DM 2.2

DM 1.3

DM 2.3

HVAC Sys TM 1 HVAC Sys TM 2

Mod 1 Mod 2

ISEA IDE (Radar)

DM 1.1

DM 1.2

DM 1.3

DM 2.1

Mod 1 Radar TM Mod 2 Radar TM

DM 2.2

Updated Requirements 18

Demo Data • •

HVAC and DBR system PLCS data – Similar to last year’s demo – Equipment – chiller?

– AP 227 implications HVAC and DBR system Tech Manual / Data Modules – Need to define minimal TM content, divide into DM – Define DMC structure – Define necessary metadata 19

Backup

20

AP239/PLCS (ISE-6 Phase 1) Demo Scenario

ShipConstructor 2008 Design Navy IDE LEAPS Navy Design & Analysis Repository CATIA (V4 AEC) AP 227 AP 227 ShipConstructor 2006 AP 214 3D Design AP 239 Design & Logistics episTree Knowledge Management Software Shipyard A - IDE AIM/SIR LPD 17 IPDE Software AP 239 Design & Logistics AP 239 AP 214 Shipyard B - IDE Design & Logistics, including 3D Design Teamcenter DDG 1000 IDE Software

21

PLCS & S1000D: Functional Scenario

Navy ISEA (GFE Change) Navy IDE (Design & Analysis) Shipyard A Design (3D CAD Data) Shipyard A IDE (Update Tech Pub) Data Prep & QA (Design, Logistics, & CAD) Navy Depot (Design, Logistics, Support) 22