Part 1 SU 7 Review

Download Report

Transcript Part 1 SU 7 Review

Part 1
Study Unit 7
• Fausto Company employs a standard cost system in which direct materials
inventory is carried at standard cost. The company has established the
following standard for the materials costs of one unit of product:
•
• Standard 4 pounds
• Quantity $ 7.50/pound
• Standard Cost $30.00
•
• During June, the company purchased 166,100 pounds of direct material at
a total cost of $1,362,020. The company manufactured 34,600 units of
product during June using 140,450 pounds of direct materials. The price
variance for the direct materials acquired by the company during June is
(Do not round intermediate calculations.):
•
• $98,315 favorable.
• $116,270 favorable.
• $116,270 unfavorable.
• $98,315 unfavorable.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Fausto Company employs a standard cost system in which direct materials inventory is
carried at standard cost. The company has established the following standard for the
materials costs of one unit of product:
Standard 4 pounds
Quantity $ 7.50/pound
Standard Cost $30.00
During June, the company purchased 166,100 pounds of direct material at a total cost
of $1,362,020. The company manufactured 34,600 units of product during June using
140,450 pounds of direct materials. The price variance for the direct materials acquired
by the company during June is (Do not round intermediate calculations.):
$98,315 favorable.
$116,270 favorable.
$116,270 unfavorable.
$98,315 unfavorable.
First, determine the actual price per unit of materials as follows.
Total cost of $1,362,020 ÷ total pounds of 166,100 = $8.20 per pound.
Then, the price variance for the direct material acquired by the company is determined
as follows.
Materials price variance = AQ × (AP − SP).
Materials price variance = 166,100 × ($8.20 − $7.50) = $116,270 (U).
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Fausto Company employs a standard cost system in which direct materials inventory is
carried at standard cost. The company has established the following standard for the
materials costs of one unit of product:
Standard
Quantity
Standard
Price
Standard
Cost
3 pounds
$ 7.8/pound
$23.4
During June, the company purchased 166,700 pounds of direct material at a total cost
of $1,466,960. The company manufactured 47,200 units of product during June using
143,950 pounds of direct materials. The direct material quantity variance for June is:
$18,330 unfavorable.
$20,680 favorable.
$18,330 favorable.
$20,680 unfavorable.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Fausto Company employs a standard cost system in which direct materials inventory is carried at standard cost.
The company has established the following standard for the materials costs of one unit of product:
Standard
Quantity
Standard
Price
Standard
Cost
3 pounds
$ 7.8/pound
$23.4
During June, the company purchased 166,700 pounds of direct material at a total cost of $1,466,960. The
company manufactured 47,200 units of product during June using 143,950 pounds of direct materials. The direct
material quantity variance for June is:
$18,330 unfavorable.
$20,680 favorable.
$18,330 favorable.
$20,680 unfavorable.
First, determine the standard quantity allowed as follows.
Total units of 47,200 units × standard quantity of 3 pounds per unit = 141,600 pounds.
Then, the direct material quantity variance is determined as follows.
Materials quantity variance = SP × (AQ – SQ).
Materials quantity variance = $7.80 × (143,950 – 141,600) = $18,330 (U).
SU 7.5 Mix Variances
Mix Variance – Isolates the effects of using the ACTUAL mix
instead of the STANDARD mix.
Mix variance = ATQ x (SPSM – SPAM)
Actual Total Quantity x Std mix of inputs – Actual mix
Favorable variances = Actual mix < Std mix
SU 7.5 Yield Variances
Yield Variance – Isolates the effects of differences between
the ATQ of inputs and the STQ.
Yield variance = (STQ – ATQ) x SPSM
Std Total Qty - Actual Total Qty x Std mix of inputs
Favorable variances = Actual Total Qty < Std Total Qty
Review page 266
SU 7.6 Overhead Variances
Total Overhead Variance consists of four variances.
-Total Variable overhead variances = flexible budget variance
-Spending variance – difference between actual variable overhead and
(budgeted application rate x the actual amount of input)
-Variance is favorable if actual production spending < std spending
-Efficiency variance – budgeted application rate times the difference between
the actual input and the standard input allowed for actual output.
-Total Fixed overhead variances
-Spending Variances – difference between actual fixed overhead and the
amount budgeted. Same as fixed overhead flexible budget variance. The fixed
overhead is the same over the relevant range of output.
-Production volume variance – (Idle capacity variance) difference between
budgeted fixed overhead and the product of the budgeted application rate and
the standard input allowed for the actual output.
-Review page 269 Analysis of Overhead Variances
• Houghton Company maintains warehouses that stock items carried
by its e-retailer clients. When one of Houghton's clients receives an
order from an online customer, the order is forwarded to Houghton.
Houghton then pulls the item from the warehouse, packs it and
ships it to the customer. Houghton uses a predetermined variable
overhead rate based on direct labor-hours. According to the
company's records, .08 direct labor-hours are required to fulfill an
order for one item and the variable overhead rate is $6.25 per
direct-labor hour. During July, Houghton shipped 290,000 orders
using 23,000 direct labor-hours. The company incurred a total of
$141,450 in variable overhead costs. The variable overhead
efficiency variance during July was:
•
• $2,300 unfavorable.
• $1,250 favorable.
• $2,300 favorable.
• $1,250 unfavorable.
•
•
•
•
•
•
•
•
•
•
•
Houghton Company maintains warehouses that stock items carried by its eretailer clients. When one of Houghton's clients receives an order from an
online customer, the order is forwarded to Houghton. Houghton then pulls the
item from the warehouse, packs it and ships it to the customer. Houghton uses
a predetermined variable overhead rate based on direct labor-hours.
According to the company's records, .08 direct labor-hours are required to
fulfill an order for one item and the variable overhead rate is $6.25 per directlabor hour. During July, Houghton shipped 290,000 orders using 23,000 direct
labor-hours. The company incurred a total of $141,450 in variable overhead
costs. The variable overhead efficiency variance during July was:
$2,300 unfavorable.
$1,250 favorable.
$2,300 favorable.
$1,250 unfavorable.
The variable overhead (VOH) efficiency variance during July is determined as
follows.
VOH efficiency variance = SR (AH – SH).
VOH efficiency variance = $6.25 per hour (23,000 hours – 23,200 hours) =
$1,250 (F).
• Problem 7.6
• Water Control Systems manufactures water pumps and uses a standard
cost system. The standard overhead costs per water pump are based on
direct labor hours and are as follows: Variable overhead (4 hours at $8 per
hour) $32 Fixed overhead (4 hours at $5* per hour) 20 Total overhead cost
per unit $52
• * Based on a capacity of 100,000 direct labor hours per month.
• The following information is available for the month of November: 22,000
pumps were produced although 25,000 had been scheduled for
production.
• 94,000 direct labor hours were worked at a total cost of $940,000.
• The standard direct labor rate is $9 per hour.
• The standard direct labor time per unit is four hours.
• Variable overhead costs were $740,000.
• Fixed overhead costs were $540,000
•
•
•
•
•
Water Control’s variable overhead spending variance for November was
A. $48,000 unfavorable.
B. $60,000 favorable.
C. $40,000 unfavorable.
D. $12,000 favorable.
• Problem 7.6
• Water Control’s variable overhead spending variance for November
was
• D. $12,000 favorable.
• The variable overhead spending variance is the difference
between actual variable overhead and the variable overhead
based on the standard rate and the actual activity level. Thus, the
variable overhead spending variance was $12,000 favorable
[(94,000 actual hours × $8 standard rate) – $740,000 actual cost].
• A. $48,000 unfavorable.
• Answer A is incorrect. The variable overhead efficiency variance is
$48,000 unfavorable.
• B. $60,000 favorable.
• Answer B is incorrect. The variance of $60,000 favorable is based
on 100,000 hours, not the actual hours of 94,000.
• C. $40,000 unfavorable.
• Answer C is incorrect.
The fixed overhead spending variance is $40,000 unfavorable.
• PROBLEM 7.6 #2
• A fixed overhead volume variance based on
standard direct labor hours measures
• A. Deviation from standard direct labor hour
capacity.
• B. Deviation from the normal, or denominator, level
of direct labor hours.
• C. Fixed overhead use.
• D. Fixed overhead efficiency.
• Problem 7.6 #2: A fixed overhead volume variance based on
standard direct labor hours measures
•
•
B. Deviation from the normal, or denominator, level of direct labor hours.
The fixed overhead volume variance measures the effect of not operating at the
budgeted (denominator) activity level. It is the difference between budgeted fixed
costs and the product of the standard fixed overhead application rate and the
standard activity level for the actual output. A favorable variance means that
activity was greater than expected and that fixed overhead was overapplied. It
might be caused by, for example, hiring more workers to provide an extra shift. An
unfavorable volume variance means that activity was less than budgeted
(overhead was underapplied), for example, because of insufficient sales or a labor
strike. Accordingly, the volume variance is usually outside the control of
production management. Moreover, unlike other variances, it does not directly
reflect a difference between actual and budgeted expenditure of resources.
•
•
•
•
A. Deviation from standard direct labor hour capacity.
Answer A is incorrect. The volume variance is not related to direct labor.
C. Fixed overhead use.
Answer C is incorrect.
The volume variance is not related to overhead use.
D. Fixed overhead efficiency.
Answer D is incorrect.
The volume variance is not related to overhead efficiency.
•
•
• Problem 7.6 #3
• Nanjones Company manufactures a line of products distributed nationally
through wholesalers. Presented below are planned manufacturing data for
the year and actual data for November of the current year. The company
applies overhead based on planned machine hours using a predetermined
annual rate.
•
•
•
•
A. $6,000 unfavorable.
B. $6,000 favorable.
C. $2,000 favorable.
D. $14,000 unfavorable.
• Problem 7.6 #3 Answer
• C. $2,000 favorable. Answer C is correct.
The variable overhead spending variance equals the
difference between actual variable overhead and the
product of the actual input and the budgeted application
rate. At a variable overhead application rate (standard
cost) of $10 per machine hour ($2,400,000 ÷ 240,000
hours), the total standard cost for the 21,600 actual
hours was $216,000. Given actual costs of $214,000, the
favorable variance is $2,000.
• Answer A is incorrect.
The variance is favorable.
• Answer B is incorrect.
The amount of $6,000 is based on planned machine
hours of 22,000.
• Answer D is incorrect.
The variance is favorable.
• Problem 7.7
Standard Costs
Actual Costs
Direct Material
600,000 units of materials at $2.00 each
700,000 units at $1.90
Direct Labor
60,000 hours allowed for actual output
at $7 per hour
65,000 hours at $7.20
Overhead
$8.00 per direct labor hour on normal
capacity of 50,000 direct labor hours:
$6.00 for variable overhead
$2.00 for fixed overhead
$396,000 variable
$130,000 fixed
• Problem 7.7 – Calculate the following:
•
•
•
•
•
•
•
1)
2)
3)
4)
5)
6)
7)
Material Price Variance AQ x (SP-AP)
Material Quantity Variance (SQ-AQ) x SP
Labor Rate Variance AQ x (SP-AP)
Labor Efficiency Variance (SQ-AQ) x SP
Variable Overhead Spending Variance (AQxSP)-AC
Variable Overhead Efficiency Variance(SQ-AQ)xSP
Fixed Overhead Spending Variance
– Flexible/Static budget – Actual costs incurred
• 8) Fixed Overhead Efficiency Variance
– (Std hours allowed for actual outputs x Std rate) x
Flexible/Static budget
SU 7.8 Sales Variances
Single Product Sales Variances
-Evaluating the production and selling functions.
-Differences are either price variance or volume
variance
-Sales volume variance = Sum of the sales quantity
and mix variance
-For a single product the sales mix variance is zero.
SU 7.8 Sales Variances
Multiproduct Sales Price Variance
-Used with two more products.
-Calculate as single and add the results
-Or -Multiply the actual total units sold x the difference between:
-the weighted-average price based on actual units sold at
actual unit price and the weighted-average price based on
actual units sold at budgeted prices.
SU 7.8 Sales Variances
Multiproduct Sales Quantity Variance
-Used with two more products.
-Calculate as single and add the results
-Or -Calculate the difference between:
-Actual total unit sales x the budgeted weighted-average UCM for the
actual mix.
-Budgeted total unit sales times the budgeted weighted-average UCM
for the budgeted mix.
-Can be separated into Sales quantity and Sales mix variances.
SU 7.8 Sales Variances
Sales quantity variances
BCM based on Actual Unit Sales – BCM based on Budgeted Unit Sales
Sales mix variances
Actual units sold - BCM based on Actual mix – BCM for the budgeted
mix and actual total unit sales.
Review page 273.
• Problem Review
• Page 288 #37
• Page 286 #38