day one_session 1_2_bambridge
Download
Report
Transcript day one_session 1_2_bambridge
LiberTrace - Establishing and Operating a Timber
Legality Verification Department (LVD) within
Liberia’s Forestry Development Authority (FDA)
and Building Capacity within FDA
Inception presentation
12/12/2013
Clinton Bambridge – LiberTrace Project Manager
Table of contents
From LiberFor to LiberTrace
Outputs of LiberTrace Project
Liberia Legality Assurance System
IT Solution - LegalTrace
Project Initiated
© SGS 2013 – All rights reserved
2
From LiberFor to LiberTrace
LiberFor
LiberTrace
Project initiated
12/2007 (60 months initially)
10/2013 (60 months)
Funding
USAID / GOL/ PROFOR (WB/EU/DFID) /
Autofinancing
EU / DFID
Context
2006:
Forest concessions cancelled
New Forestry Law enacted
UN sanctions on timber export lifted
2011: VPA signed between EU and GOL
2013: VPA ratified by GOL
•
•
•
•
Main mandates
•
•
•
Development / monitoring of
computerized COCIS
Timber export permits emission
Forest taxes collection
Capacity building
•
•
© SGS 2013 – All rights reserved
Continuity of LiberFor mandates
Building LVD
Development of a CoC + legality web
based application
Auditing companies’ legality
compliance
Licensing system (FLEGT Licenses)
3
Project Objective
Objective:
Establish and Operate a Timber Legality Verification
Department (LVD) within Liberia’s Forestry Development
Authority (FDA) and Build Capacity within FDA
Beneficiaries:
FDA
Ministry of Finance
Stakeholders
Partners:
Forest sector operators
VPA Support Unit
FLEGT Coordinator
4
LiberTrace Project – 5 Outputs
Output 0: Project managed
Output 1: LVD established
Output 2: LVD capacities established
Output 3 - Design and development of the LVS
Output 4 - Design and development of the new COCIS
Output 4/3 - Roll out of the new COCIS/LVS
Output 5: LVD transferred to FDA
© SGS 2013 – All rights reserved
5
Output 0 – Project Managed (60 months)
FDA Board of Directors
MOA., MOC, MOF, MOCIT, MOPEA,
Central Bank, FDA MD, etc.
DFID
SGS
Corporate
Direction
Project Board / Project Evaluation Committee
Methodology
EFI
Quality
Assurance
PRINCE2
Project Management Team
Management by quarterly
stages
Quality management
M&E system based on KPIs
Work Packages
Project Initiation
Stage control
Project closure
© SGS 2013 – All rights reserved
LVD
Technical
Managers
Senior Users
LVD
Technical
Manager
FDA
MOF
DFID
Managing Represent- RepresenDirector
atives
tative
Executive
SGS
Managing
Director
Technical
Advisory
Committee
Senior Supplier
Project Manager
SGS Liberia/
Geneva
Project Support
Capacity-building
Team Leader
LAS
Team Leader
Project Management
Team
6
Output 1 – LVD to be established
Project Manager
LVD
Technical Manager
Invoice processing
Coordinator
LAS
Team Leader
Administrative
Officer
Database Information
Manager
Operations
Manager
Trainee Operations
Manager
Strategy
Vision of the LVD: values,
responsibilities, organisation
© SGS 2013 – All rights reserved
IT Expert
Capacity
Building
Team Leader
Trainee Database
Information Manager
Quality Manager
Work Packages
LVD institutional design
Installation in FDA HQ
Key positions staffed
Administrative management system / Initial QMS
7
Output 2 – Capacity built within the FDA
Capacity-building Implementation Plan (CBIP)
Capacity needs assessment,
Deployment plan, staff management plan, training plan,
procurement plan, communication plan
Training sessions
Management: Leadership, Integrity, HSE, QMS
IT: Basic IT, use of the COCIS & LVS, support and
maintenance
Forestry: Regulation/FLEGT, Verification procedures,
timber grading & scaling
Capacity-building approach
Change management,
“System builders”, Trainee/Graduate
© SGS 2013 – All rights reserved
8
Output 3 – Design and Development of the Legality
Verification System
The Legality Verification System is a key element of the Liberia
Legality Assurance System (LLAS)
Design of Legality Verification Standard Operating Procedures
(SOPs). Consultation of stakeholders and field testing
Based on EU/GOL VPA Legality Matrix
Verification of compliance with the Legality Standard
© SGS 2013 – All rights reserved
9
Output 4 - Design and development of the new
COCIS
Standard Operating Procedures (SOPs)
Review of existing SOPs
Design of new SOPs
Stakeholders consultation and field testing
Current COCIS used by LiberFor is LiberTrack
LiberTrack will be progressively replaced by the new
COCIS based on SGS solution: LegalTraceTM
10
SGS web application: LegalTraceTM
LegalTraceTM is:
The timber traceability and legality software developed by
SGS in compliance with VPA requirements.
Built on the SGS “.Net” Framework already used worldwide
by SGS Group.
A single software solution that manages traceability and
legality verification as well as the functionality enabling the
issuance of FLEGT licences.
Based on the recommendations of SGS forestry and IT
experts, LegalTraceTM has been developed as a generic
system covering 80% of the requirements of any VPA.
The remaining 20% will be developed specifically for Liberia
into an application called LiberTrace.
© SGS 2013 – All rights reserved
11
Outputs 3 & 4 - LVS & COCIS operated
LVD Headquarters in Monrovia
03 permanent field offices
Intermittent presence in other sites
Operational team structure
COC Inspection teams
LV Inspection teams
COC / LV Rangers
COC/LV Data Management
Internal Auditing
© SGS 2013 – All rights reserved
12
Output 5 – LVD transferred to the FDA
Month
2
Recruitment and deployment
12
Transfer Plan approved by DFID and GOL
24
25
Pilot handover in one selected regional office
Scaling up the handover in remaining regional offices based on
lessons learned from the pilot.
43
49
51
Handover of complete LVD headquarters functions, but with a
continuing backstopping and coaching/mentoring programme;
LVD certified against ISO9001 standards
Post-handover support provided by SGS
60
© SGS 2013 – All rights reserved
13
Project Initiated: activities up to date
Outputs
Activities
Output 0: Project managed
Meetings with key stakeholders
Key resources mobilized
Procurement initiated
Reporting structures implemented
Output 1: LVD established
Job Descriptions of SGS/FDA Counterparts
drafted
Output 2: LVD capacities established
In progress
Output 3 - Design and development of the LVS
Deployment of Legality Expert – Dr. M. Brink
in progress
Output 4 - Design /development of the new COCIS
LiberTrace IT solution under development
Output 4/3 - Roll out of the new COCIS/LVS
Delivered project month 18
Output 5: LVD transferred to FDA
Transfer plan month 12 , implementation to
follow
© SGS 2013 – All rights reserved
14
Thank you
Clinton BAMBRIDGE, Project Manager
Email: [email protected]
Francis K. ODOOM, Project coordinator – Capacity building
Email: [email protected]
Jerome LAPORTE, Project coordinator – LAS
Email: [email protected]
© SGS 2013 – All rights reserved
15
© SGS SA 2013. ALL RIGHTS RESERVED.
WWW.SGS.COM
16