EcoPart 400
6 – 34 kW
Design & dimensions
• Front panel – 2 screws
• Pre-cut holes for flexible
tubes
• Adjustable feet
Design & dimensions
Brine connection
• 4 flexible tubes included
mounted from factory
• All direction compliant
Water IN
Water OUT
Brine Sole IN insulated
Brine Sole OUT insulated
Brine connection
• Insulated
• Tested with water
in factory
• Inside the product
Power output
• In the same dimension
CTC EcoPart 406
CTC EcoPart 408
CTC EcoPart 410
CTC EcoPart 412
CTC EcoPart 414
CTC EcoPart 417
5,90 kW
8,19 kW
9,98 kW
11,75 kW
14,29 kW
16,87 kW
COP – Noise level
• COP 0/35 EN14511
CTC EcoPart 406 CTC EcoPart 408 CTC EcoPart 410 CTC EcoPart 412 CTC EcoPart 414 CTC EcoPart 417
4,57
4,58
4,60
4,60
4,55
4,62
• Sound Power *EcoHeat ”old” 300
•
Mätningar enligt EN3747 vid 0/35. Värden gäller både 400V och 230V.
CTC EcoPart 406
CTC EcoPart 408
CTC EcoPart 410
CTC EcoPart 412
CTC EcoPart 414
CTC EcoPart 417
43 dB (A)*
42,5 dB (A)*
48,5 dB (A)*
49,2 dB (A)
51,5 dB (A)
51,2 dB (A)
Noise level
• Compressor cover
• New quality insulation
Other options
• Filling kit for sole /
brine
• Charging pump –
accesory
•
StratosTec 25/6
•
StratosTec 25/7
•
25/8,5
Electrical box
• Soft starter card
• Control system for HP
• Accessible from front
• Also EcoHeat 300
Electrical installation
• Cabling
• SEPARATE Bus and Supply
Control system
• Various options
•
BasicDisplay
•
EcoLogic V3
CTC Interface
•
EcoEl V3
•
EcoZenith i550
•
Ecologic PRO
Basic Display
Control system
• Basic Display for fixed temperature
– Short parameter list
• Return temperature setpoint
• Differential on / off
• Reading of the temeratrure
• Reading of the pressur
• Set the heatpump number for cascade
– Alarm handling
– Needed for casade application
Display
Name
Description
Ecoair, Ecopart
101
Operation mode
If mode is Fix return stop, display shows set-value for stop temperature, other
modes are displayed with corresponding letter A1, A2, A3 … A10
EA + EP
102
Start stop
difference
Only in Fix Return Stop Mode. Other modes do not show this display.
EA + EP in fixed return stop
mode
103
Discharge
Measured discharge temperature is shown here.
EA + EP
104
Outdoor
Temperature
Measured outdoor temperature is shown here.
EA
105
Last error / present
error
Displays the last / preset alarm with the letter “E” followed by the corresponding
error code
EA + EP
106
Brine out temp
Measured Brine Out temperature or Exhaust air temperature is shown here.
EA + EP
107
Brine in temp
Measured Brine In temperature is shown here.
EP
108
Inlet temp
Measured Inlet temperature is shown here.
EA + EP
109
Outlet temp
Measured Outlet temperature is shown here.
EA + EP
110
Suction temp
Measured Suction temperature is shown here.
EA + EP
111
High Pressure
Measured Pressure in bar in high pressure side is shown here.
EA + EP
Special function:
If up + dn is pressed for 3 seconds in this menu and product = EA -> start a
defrost. The defrost should then run and stop according to its function
description.
112
Low Pressure
Measured Pressure in bar in low pressure side is shown here.
EA + EP
113
Evaporation C
Measured Evaporator temperature from low pressure conversion is shown here
EA + EP
114
Condensing C
Measured Condensing temperature from high pressure conversion is shown
here
EA + EP
115
Suction SH
Superheat is shown here
EA + EP
116
EV %
Expansion valve opening is shown here
EA + EP
117
Capacity KW
Capacity from heat counter function is shown here.
EA + EP
118
Current A
Current (from soft starter) is shown here
EA + EP
119
Defrost Timer
Timer defrost is shown here
EA
Control system, Converter
• Ecologic V3 & EcoEl V3 +
CTC Converter
• Cable connection between
EcoPart and Converter
• Wall mounted
• Use of the 12 systems in
EcoLogic
CTC Converter
Converter
Control system, Converter
Control system
• Next step – CTC EcoLogic PRO
• Use of 6 systems
• See  Ecologic presentation
Next step
• EcoPart XL
• EcoPart 424
• EcoPart 434
EcoPart XL
• Performance