Importance
 Critical for evacuation & transportation of 615 MT of
Coal production target by 2016-17.
 MCL - incremental production significant for AP, TN
and Karnataka.
 Ch projects important for Rajasthan, Maharashtra and
Gujarat.
Imp …
• Substantially increase coal
availability.
• Improve Power Scenario.
• Enhance Freight Rev. of Rlys.
• Enhance incremental rev. of
Jharkhand.
COAL CONNECTS
 No. Of Project :
31
[Jointly identified by Min. of Rly., Power & Coal]
CRITICAL
:
5
MAJOR
:
9
MINOR
:
17
SWEEP
RAILWAY WISE:
ECR- 18
SECR- 06
ECOR- 03
ER- 01
SER- 01
SER+ ECR- 01
SCR- 01
SUBSIDIARY WISE:
CCL- 12
NCL- 07
SECL- 05
MCL- 05
BCCL- 01
SCCL - 01
CRITICAL COAL CONNECTS
S
N
Name of Project
Coal Field
1
2
Tori-Shivpur Kathautia
Shivpur -Kathautia
3
Jharsuguda-Sardega
North
Karanpura
North
Karanpura
IB Valley
4
BhupdeopurKorichappar-Baroud
Diversion of fire
affected area.
5.
MandRaigarh
JHARIA
Coal State
Subsi.
Co.
CCL
JH.
CCL
JH.
MCL
Odisha
SECL
CH.
BCCL Jh . WB
TORI- SHIVPUR- KATHAUTIA
1. Tori-Shivpur New Line (CCL)
• 43 Km.
1094 Cr.
60MT out of total 140 MT.
• Deposit work of CCL CAO/CON/ECR
Milestone :
• Stage I - Conditional clearance. [29.4.11/ 1.8.12]
• Stage II - Clearance on 19.6.13.
• Work from Tori end.
• TDC: June 2016. [ CCI Target for Mar /2015]
Assistance Required
• Complete possession of required 375 ha of land is
made available by Jh by 30.10.13. At present, 99 ha
of Govt. and Raiyati (Pvt.) land are not available at
131 locations/stretches in the entire span of 44 km.
• Tree Felling and Clearance by 30.10.13.
• Adequate security for men and machines deployed.
• Deputation of LA & Forest officials to resolve issues.
• Beef up Security at vulnerable loctions.
• Ensuring inter-district coord. (Chatra, Latehar,
Hazaribagh)
2
Shivpur-Kathautia
(Part of Tori-Kathautia Revised Alignment)
• Shivpur-Hazaribag was not agreed by MoEF hence
changed to Shivpur-Kathautia
• 47.70 Km
1250 Cr.
CCL
CAO/CON/ECR.
 Milestone :
•
Early identification of forest : to enable Rlys to file Stage-I.
•
•
•
Land Acquisition.
Handing Over Possession.
Final Forestry Clearance.
3. Jharsuguda-Barpalli-Sardega
•
52.41 Km. IB Valley Odisha 555 Cr.
MCL
CAO/CON/SER
.
• Takes
off from Jharsuguda-FCI-Shunting neck &
terminates at buffer end at Sardega. Includes Dhutra
connection.
•Passes through Jharsuguda & Sundergarh districts, 24
• 2 Tehsils- Jharsuguda & Hemgir & 2 Forest Div. vill.,
Sambalpur & Sundergarh.
•To evacuate and transport 60 MT of coal from GopalpurManoharpur Blocks in IB valley of MCL.
•Jharsuguda-Barpalli-Sardega …
•Includes : Con. of Main Sdg. b/n FCI Shtg. Neck &
Sardega.
: Loading Bulb at Barpali.
: Rail Flyover at Jharsuguda.
•Target : Dec.’14.
• 29.8.2013 : After hectic persuasion by the Railways,
Stage- I forest clearance has been forwarded by the
State Govt. to MoEF and the clearance is likely to be
obtained shortly.
4. Bhupdeopur-Korichappar-Baroud
• 27.2.2012 : MOU with CH.
• 3 corridors : East. North.
East-West Corridor.
• Bhupdeopur- Korichhapar/Baroud [Mand- Raigarh]- Part
East Corridor.
• Execution : SPV route with CH. CIL. IRCON. Bhupdeopurkorichappar-Korba & Gevra road –Pendra road projects .
• NL b/n Bhupdeopur-Korichapar will be extended to Korba via
Dharmjaigarh - 63 km project costing 344 Cr.
• Gevra Road to Pendra Road (East-West Corridor), 122 km .“In
Principle” approval from Plg Comm.
• March 13: 2 JVs formed. Land acquisiton is in process.
• TDC : 2yrs for Ph I & 3 Yrs. For complete.
East
Diversion of Fire Affected Railway
Lines in Jharia area of BCCL
 133 Track km.
 172 trains I/C 46 Pass.
 DHN & ADRA
MAJOR COAL CONNECTIVITY
PROJECTS
1. Piparwar Railway Siding [CCL]
• 30 Km.
90.60 Cr.
CCL
RITES
25 MT
Roadblocks :
Severe Law & Order problem
TDC- Dec.’13 for Ph I & Jun’14 for Ph II
2. Ashoka Siding Project [CCL]
 Facts :
• 12.5 Km
129Cr
CCL
• take off from 11th km of Piparwar.
Milestone :
• Transferred to RVNL.
.
Target : June 2015
12-15 MT
CAO/C/ECR.
3. Shivpur-Chatti Bariatu & Hazaribagh-Banadag Sdgs.
 Facts
:
• Shivpur-Chatti Bariatu (14 km) & HazaribaghBanadag (9 km)
• ECR.
NTPC
CAO/CON/ECR
• Survey by RITES
Milestone :
 Shivpur-Chatti-Bariatu : DPR submitted to
NTPC.
 Banadag project : Likely to be opened for
Goods Traffic.
4. Koderma-Hazaribagh-Barkakhana-Ranchi -NL
 Facts :
• 189 km.
2957.21 Cr.
JH share - 66%
CAO/CON/ECR.
• Important for evacuation of coal from Hazaribagh-Banadag siding
.
Milestone :
• TDC for Koderma-Hazaribagh : Oct.’13
Hazaribagh-Barkakhana (57 km) : Sept.’14
Barkakhana-Ranchi (65 km): Dec.’15
5. Koderma – Tilaiya New Line
 Fact :
• 64 Km. Line [34 km under forest area of Bh & Jh] 418 Cr.
CAO/CON/ECR
• Critical for : BARH Thermal Power Plant of NTPC [Operational -Feb’ 14].
• Involves construction of 5 long tunnels 6 via ducts bridges.
 Milestone :
• Stage-II forest clearance from BH –Pending.
• fly over at Manpur - To avoiding reversal. NTPC to give consent.
• Land acquisition Issues. 70% civil work in non forest area is complete.
• TDC : 2014-15 – Stage-I -non forest land (40km)
: 2018-19 – Stage-II in forest land (25km)
6. Angul- Talcher Bulb Line
• Doubling of feeder lines
• Auto signalling
7. Rail Corridor connecting Angul-Talcher Line
Facts :
• 85 Km.
5200 Cr
RITES
Odisha (IDCO).
• Corridor involves laying of Railway lines & roads.
Milestone :
• Feasibility report submitted. State Govt. has requested to implement
through PPP route.
•CMPDIL has suggested change in alignment that needs to be
firmed up.
• PPP Policy in place.10/12/12.
•5 Models:
Non Govt Pvt. Line JV BOT
Cap Augmentation : Fundng by customers
: Annuity
Alternative: Feeder route Doubling and auto Signalling.
8. Bhadrachalam-Sattupalli NL
Facts :
•
56.25 Km 337.50 Cr SCCL
CAO/CON/SCR.
 Milestone :
• Rs.6 cr. provided by SCCL to SCR for conducting
FLS etc. by SCCL.
• Sept. 2013- Working Plan of Construction to be
submitted.
• Nov 13. – Terminal Arrangement for Sattupalli to be
finalised by SCCL.
9. Vasundhara : Addl. Link
Odisha Govt.+ MCL+ SECR+ Rampia
Co.
‘Common Corridor Concept’
Balance Coal Connectivity Projects
S.No.
1.
2
3
4
5
6
7
8
Name of Project
Renovation of Chainpur-Sarubera
Completion of balance work of
Dhori siding of CCL.
Improvement of Dudhi Chua siding.
Modification of Dudhi Chua Yard for
2nd Silo
New Railway Siding for Block B
project
Complete
track
renewal
at
Shaktinagar to Jayant Silo of NCL
including improvement to Jayant and
Spur siding
Balance work of KBJ railway line
between
Krishnashila
and
Shaktinagar Railway station
PRL system Amlohri and Nigahi
Executing
Agency
DHN
Coal Subsi
Projects
CCL
TDC Sept. 2013.
ECR
CCL
Work completed
DHN
NCL
TDC July 2013
Raising of speed from
SKTN to DCH
DHN
NCL
RITES
NCL
RITES
NCL
TDC Sept.2013. 10 addl.
rakes
Feasibility report
submitted by RITES to
NCL.
Estimate submitted by
RITES.
RITES
NCL
NCL to submit full
estimate value.
RITES
NCL
DPR is under process by
RITES
Status
Balance Coal Connectivity Projects
S.No.
Name of Project
9
Krishanshila Railway siding
10
Railway Sdg at Lakhanpur
Coalfields of Bishrampur Area
11
12
13
14
15
16
17
Executing Agency
Coal Subsi
Projects
RITES
NCL
SECL
DPR is under process
by RITES
SECL has to give the
DPR for taking the
project further
SECL
SECL
Nov’ 13 TDC DPR
DPR under approval
CCL
March 2013 Feasibility report of
Amarpalli submitted
April 2013 –
Feasibility report of
Magadh submitted.
ASN
CCL
TDC Dec 2013.
DHN
CCL
Estimate under
preparation.
RITES
MCL
RITES
MCL
DPR under preparation.
Feasibility report in
advanced stage.
DPR approved by
SECR. Land issue to
be sorted by MCL.
RITES have done
initial survey and
feasibility study
New Rly Siding at Kusmunda area
SECR
Construction of New sdg. parallel to
SECR
old sdg. at Bhatgaon area
Magadh and Amarpalli Rly. Siding
Renovation of CP siding of Giridih
of MNK area
Renovation of Swang & Jarandih
siding
Temporary connect of Lingraj
siding with Talcher main line.
nd
2 siding at Himgir station, Kanika
Status
ISSUES:AREAS OF CONCERN
• Environmental clearances.
• Land acquisition and possession.
• Law & order.