Transcript PowerPoint

17th of June, 2014
RBA Securitisation System
RBA Securitisation System
Technical Delivery Forum
Agenda
Introduction
Forum Protocol
RBA Project Status Update
Technical Update
Q&A Session
Next Steps
Introduction
Program Director – Andrea Brischetto
Program Project Manager – Caterina Lucia
IT Director – Nish Chandran
Technical Delivery Manager – David Zufic
Forum Protocol
•
All dial-in participant lines will be muted for most of the
presentation. All lines will be open during the Q&A portion of
this Forum.
•
To mute/unmute your own line, dial
*6 (mute)/#6 (unmute)
•
All questions will be handled in the Q&A portion of this
Forum. We will open up the floor to each institution in
alphabetical order.
RBA Program Status Update
• Vendor Partner Lewtan selected and engaged
• Project is in the Design Phase
•
•
•
Detailed Requirements finalised
Functional Specification and System design near completion
Submission file format near completion and XML schema to be communicated
early July
• Detailed Test Planning in progress
•
•
•
Testing scheduled with Industry during September to November
Controlled testing
Based on stable application and phased functionality
• Training plan in progress
RBA Program Status Update
• SIF website will be updated
•
As project is moving into Design and Build, the website will increasingly focus on
technical, implementation and testing aspects (geared to Project Managers)
• IP progress report high level summary
• June reports received last week thank you but not processed yet
• April reports indicate:
-All responding IPs expect to be ready by reporting requirement start dates
-About half of institutions use automated data transfer
Technical Update
• Online solution overview and update
•
•
Browser Support will be: Internet Explorer (Version 7 and later), Firefox
(Version 10 and later), Google Chrome (Version 18 and later), Safari (Version
5 and later)
https: website, login/password access based, standard network ports and
protocols
• Submission File Format and Specification Update
•
•
•
•
The submission file format for the data fields and VBA code across the Loan,
Security, Transaction and Pool categories and the Cash Flow Waterfall Model
will be in the XML format (“eXtensible Markup Language”)
A submission will consist of a single xml file per deal, per reporting period
(i.e. monthly basis)
Detailed XML Schema definition will be communicated early July
An Excel template with the XML Schema embedded will also be provided.
This will allow you to utilise Excel to auto generate the XML submission file
if necessary
Technical Update
• B2B Automated Submission Update
•
•
The B2B API layer will be via a secured web service, leveraging a private RBA
supplied certificate for authentication from a registered static computer ipaddress.
Full details on the API implementation and the registration process will be
released as soon as possible
• Project Information publication and Technical questions
submission and contact method via SIF Website:
http://www.rba.gov.au/securitisations/
Q&A Session
Next Steps
• RBA to:
1. Schedule ongoing regular technical forums
2. Post todays presentation on SIF website
•
IPs to provide by email to [email protected] by 18th July 2014:
1. Expected numbers of business users that will require a login to the
production system
2. Intent to use B2B Automated Submission service
3. Interest in UAT testing participation
Please include in the subject line of the email “Response to June Tech
Forum”