Transcript Lower Seletar Waterworks (LSWW)
Lower Seletar Waterworks (LSWW)
Project Status
• Consultants: Black & Veatch (SEA) Pte Ltd • • • Preliminary study and detailed design completed Calling of Tender : 13 Jun 2008 Closing of Tender : 11 Sep 2008
Scope of construction works
• Raw water pumping facilities at existing Lower Seletar Pumping Station • Waterworks: 60mgd membrane plant with electro chlorination • Raw water and treated water pipelines will be laid by PUB 1