PBU Screening Panel

Download Report

Transcript PBU Screening Panel

PBU Screening Panel Presentation Template

Sample Content

• • • • • • • • • • General Introduction General Layout of PBU Shop Drawings Manufacturing Process Delivery and Storage On-Site Installation Homeowners User Manual Maintenance and Renovation Annual Production Capacity Additional Info

PBU System – General Introduction

• Material of Wall Panel ¹ , Floor and Ceiling • Technical details ² of Wall Panel, Floor and Ceiling (e.g. thickness ³ , density, weight 4 , fire rating etc) • Minimum floor-to-floor height required

PBU System – General Introduction

• Extent ¹ of finishing and fitting works completed off-site (what items are done off-site and what items are done on-site?) • Type of tiles (including tiling method) • Type of floor trap • If any metal components were used, please provide details on the corrosion protection and life span of the metal components

General Layout of PBU (with a sample unit layout)

• To provide a general layout of a PBU (must include a sample floor plan of the apartment unit in order to show the PBU’s possible positions in relation to the other rooms/structural element of the apartment) – Locations of concealed services (pipes, M&E etc) – Location of vertical stack (must be accessible from outside the PBU but within the DU or common areas) – Location of maintenance panel within the PBU – Possible locations for the manufacturer’s label (including a sample label ¹ ) – Possible locations ² for grab bar(s) installation (please clarify if additional reinforcement is required)

Shop Drawings

• Shop drawings showing typical details of PBU • Typical details of interfacing between PBU wall panel to PBU floor slab • Typical details of interfacing between PBU wall panel to wall panel • Typical details of interfacing between PBU wall panel to structural floor slab or corbel • Connection details of sanitary wares and/or other fittings to PBU wall/floor

Shop Drawings

• Method of window installation • Typical details of interfacing between PBU wall panel and external wall (at window openings)

Design Considerations

• • Are there specific design considerations made to cater for drainage of water leakages?

Does the PBU system utilise single slab or double slab system? Please provide details of the supporting beam/corbel where necessary

Manufacturing Process

• Step-by-step description (flowchart with illustrative photos where possible) on the manufacturing process, including: – Water-proofing details (e.g. ??? mm upturn) – QC test details & schedule (e.g. when to conduct each watertightness test at what section of the PBU, static loading test on sanitary wares etc)

Delivery and Storage

• Transportation arrangement (including protective measures towards potential cracks/damages to PBU structure, internal finishes and fittings PBU during lifting and delivery) • Possible storage arrangement

On-Site Installation

• Installation method statement (can provide a pictorial summary in the slides, and separately provide the full method statement as a PDF supporting document) • Structural details and calculations on the lifting support ¹ (same as above) • Protective measures taken to prevent damages/theft after PBU is installed on-site

On-Site Installation

• Please clarify if site workers can complete the installation of pipe connections, gas water heater/electric storage heater without entering the PBU?

Homeowners User Manual

• To provide the content page of the sample homeowners user manual ¹ (to show what info will be included)

Maintenance/Renovation

• Method statement on maintenance/renovation works, including – How to carry out tile replacement works – How to carry out pipe repair/replacement works if there is chokage (especially for embedded pipes) – What is the minimum space requirement between the false ceiling and underside of top slab to allow for maintenance work and/or install water heater drum?

Annual Production Capacity

• • Local Plant Overseas Plant (if applicable)

Additional Info

• Provision for training of Installers/Renovators (for new systems uncommon in the local industry) • Any other relevant supporting info ¹