IPD/BIM THESIS PROPOSAL
Mission Statement:
To deliver innovative designs, with an integrated, streamlined
approach to building systems and construction management
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Introduction
BIM Goals/Coordination
AGENDA
BIM Goals/ Coordination
Main Roof Redesign
Façade Redesign
Community Rink Redesign
Conclusion
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Main Roof Redesign
Façade Redesign
Community Rink Redesign
Conclusion
Introduction
BIM GOALS
2
Design with constructability in mind
1
Optimize building performance
PROPOSAL FOCUSES
Potential BIM Uses
3D Coordination, Design
Review, Design Authoring
Energy Analysis, Lighting
Analysis, Building System
Analysis, Site Analysis, Design
Authoring, Sustainability LEED
Evaluation
3D Coordination, 4D Modeling,
Cost Estimation, Design
Authoring
Building Systems Analysis, Cost
Estimation, Structural Analysis,
Energy Analysis, Mechanical
Analysis, Design Authoring, 3D
Coordination, Construction
Systems Design
Façade Redesign
CM
Create an iconic symbol for Penn State hockey with increased
structural efficiency
Façade Redesign
Create an energy efficient lightweight facade
Community Rink Redesign
Create a more efficient mechanical system while incorporating
daylighting strategies
Alex Ho
Conclusion
PROGRAM COORDINATION
Main Roof Redesign
Nate Babyak
Community Rink Redesign
Mechanical
1
Goal Description
Value Added Objectives
Recognize design conflicts before
they reach construction
Create an energy efficient arena
Main Roof Redesign
Structural
Priority (1-3)
1-Most Important
1
BIM Goals/Coordination
Brian Sampson
Alex Schreffler
L/E
Introduction
BIM Goals/Coordination
PROJECT SCHEDULE
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Main Roof Redesign
Façade Redesign
Community Rink Redesign
Conclusion
Introduction
MAIN ROOF REDESIGN LOGIC
BIM Goals/Coordination
INSPIRATIONS
Create an Iconic Symbol for Penn State Hockey
Reduce the Size of the Roof Girders/Trusses
Reduce Volume of the Main Arena
Coordinate MEP and Structural
Create an Efficient Erection Procedure
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Main Roof Redesign
Façade Redesign
Community Rink Redesign
Conclusion
Introduction
MAIN ROOF REDESIGN LOGIC
BIM Goals/Coordination
PROPOSED DESIGN
Reduce the Size of the Roof Girders/Trusses
Reduce Volume of the Main Arena
Coordinate MEP and Structural
Create an Efficient Erection Procedure
Alex Ho
Brian Sampson
Façade Redesign
Community Rink Redesign
ERECTION PROCESS
Create an Iconic Symbol for Penn State Hockey
Nate Babyak
Main Roof Redesign
Alex Schreffler
Conclusion
Introduction
BIM Goals/Coordination
MAIN ROOF REDESIGN LOGIC
Main Roof Redesign
Discipline
Structural
Create an Iconic Symbol for Penn State Hockey
Reduce the Size of the Roof Girders/Trusses
Construction Management
Reduce Volume of the Main Arena
Coordinate MEP and Structural
Mechanical
Create an Efficient Erection Procedure
Lighting/Electrical
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Façade Redesign
Community Rink Redesign
Roof Redesign Tasks and Tools
Secondary Tasks
Programs to be Used
Design/Analyze Cable Stay
SAP, Revit
Mast, Cables, Roof Girder
Adjust Interior Steel Framing
RAM, Revit
Design Erection Process
SAP, Navisworks
Revit Architecture, Revit Structure,
Cost Analysis
MS Excel
Conclusion
References
ASCE 7-10, ASCE 19-96, AISC
Steel Manual 13 Ed., ACI 318-08
AISC Steel Manual 13 Ed.
AISC Steel Manual 13 Ed.
RS Means, Vendor(s)
Schedule Analysis
Microsoft Project, Navisworks
RS Means, Vendor(s)
Site Plan Analysis
AutoCad, Adobe Acrobat, MS Excel
-
Roof Composition
H.A.M. Toolbox/Trane Trace 700
-
Mechanical Room Layout
Main Bowl Ductwork Layout
Shaft Coordination
Revit MEP 2012
Revit MEP 2012
Revit MEP 2012
Arena Lighting Analysis
AGi32
NCAA Recommendations ASHRAE
90.1
Arena Lighting/Catwalk/
Scoreboard Structural Loads
Circuit/Panel Redesign
-
Coordiante with Structural Member
Revit MEP
NEC 2011
Introduction
BIM Goals/Coordination
FAÇADE REDESIGN LOGIC
Create a Lightweight Façade of Glass and Metal Panels
Optimize Daylighting
Architectural Lighting
Possible Integration of Lateral Bracing
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Main Roof Redesign
Façade Redesign
Community Rink Redesign
Conclusion
Introduction
BIM Goals/Coordination
FAÇADE REDESIGN LOGIC
Create a Lightweight Façade of Glass and Metal Panels
Optimize Daylighting
Architectural Lighting
Possible Integration of Lateral Bracing
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Main Roof Redesign
Façade Redesign
Community Rink Redesign
Conclusion
Introduction
BIM Goals/Coordination
FAÇADE REDESIGN LOGIC
Create a Lightweight Façade of Glass and Metal Panels
Optimize Daylighting
Architectural Lighting
Possible Integration of Lateral Bracing
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Main Roof Redesign
Façade Redesign
Community Rink Redesign
Conclusion
Introduction
BIM Goals/Coordination
FAÇADE REDESIGN LOGIC
Main Roof Redesign
Discipline
Structural
Create a Lightweight Façade of Glass and Metal Panels
Optimize Daylighting
Construction
Management
Architectural Lighting
Possible Integration of Lateral Bracing
Mechanical
Lighting/Electrical
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Façade Redesign
Community Rink Redesign
Façade Redesign Tasks and Tools
Secondary Tasks
Programs to be Used
Design Panels (wind,
ETABS, MS Excel
earthquake, gravity, etc)
Lateral System Design/
ETABS, RAM
Analysis
Conclusion
References
ASCE 7-10
ASCE 7-10, AISC Steel
Manual 13th Ed.
Cost Analysis
Revit Architecture, MS Excel
RS Means, Vendor(s)
Schedule Analysis
MS Project, Navisworks
RS Means, Vendor(s)
Site Plan Analysis
AutoCad, Adobe Acrobat, MS Excel
Construction Manager
Wall Composition
H.A.M. Toolbox/Trane Trace 700
-
Panel To Glass Ratio
Shading
Trane Trace 700
Trane Trace 700
Daylighting Analysis
Revit Architecture, AGi32, 3DS Max
Shading Analysis
Revit Architecture, AGi32, 3DS Max
Architectural Lighting Analysis
AGi32
Circuit/Panel Redesign
Revit MEP
IES 2011 Lighting
Handbook
IES 2011 Lighting
Handbook
IES 2011 Lighting
Handbook ASHRAE 90.1
NEC 2011
Introduction
BIM Goals/Coordination
COMMUNITY RINK REDESIGN LOGIC
Move Mechanical Units to Increase Fan Efficiency
Flexible Roof Design
Coordinate Daylighting
Coordinate Mechanical Shafts with Structure
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Main Roof Redesign
Façade Redesign
Community Rink Redesign
Conclusion
Introduction
BIM Goals/Coordination
COMMUNITY RINK REDESIGN LOGIC
Move Mechanical Units to Increase Fan Efficiency
Flexible Roof Design
Coordinate Daylighting
Coordinate Mechanical Shafts with Structure
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Main Roof Redesign
Façade Redesign
Community Rink Redesign
Conclusion
Introduction
BIM Goals/Coordination
COMMUNITY RINK REDESIGN LOGIC
Move Mechanical Units to Increase Fan Efficiency
Flexible Roof Design
Coordinate Daylighting
Coordinate Mechanical Shafts with Structure
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Main Roof Redesign
Façade Redesign
Community Rink Redesign
Conclusion
Introduction
BIM Goals/Coordination
Main Roof Redesign
Discipline
COMMUNITY RINK REDESIGN LOGIC
Structural
Move Mechanical Units to Increase Fan Efficiency
Façade Redesign
Community Rink Redesign Tasks and Tools
Secondary Tasks
Programs to be Used
Design/Analyze Lobby Roof for
SAP, Revit
Mechanical Units
Design/Analyze Community Rink Roof
Construction
Management
Coordinate Daylighting
Coordinate Mechanical Shafts with Structure
Mechanical
Lighting/Electrical
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
RAM, Revit
Conclusion
References
ASCE 7-10, ASCE 19-96, AISC Steel
Manual 13 Ed.
ASCE 7-10, AISC Steel Manual 13
Ed.
Schedule Analysis
Revit Architecture, Revit Structure,
MS Excel
Microsoft Project
Site Plan Analysis
AutoCad, Adobe Acrobat, MS Excel
Construction Manager
MEP Coordination
Roof Analysis
Navisworks, MS Project
Trane Trace 700
-
Façade Analysis
H.A.M. Toolbox/Trane Trace 700
-
Ductwork Layout
Revit MEP 2012
Community Rink Lighting Analysis
AGi32
NCAA Recommendations ASHRAE
90.1
Daylighting Analysis
Revit Architecture, AGi32, 3DS Max
IES 2011 Lighting Handbook
Solar Thermal Gain Analysis
Circuit/Panel Redesign
Trane Trace 700
Revit MEP
Coordinate with Mechanical Member
NEC 2011
Cost Analysis
Flexible Roof Design
Community Rink Redesign
RS Means, Vendor(s)
RS Means, Vendor(s)
Introduction
GROUP MILESTONES
Milestone 1: January 27, 2011
CONCLUSION
Main Roof Redesign
Create an iconic symbol for Penn State hockey with increased
structural efficiency
Main Roof Redesign Complete
Milestone 2: February 13, 2011
Lobby Design Complete
Milestone 3: March 2, 2011
Façade Redesign
Create an energy efficient lightweight facade
Façade Design Complete
Milestone 4: March 26, 2011
Community Rink Design Complete
BIM Goals/Coordination
Community Rink Redesign
Create a more efficient mechanical system while incorporating
daylighting strategies
Nate Babyak
Alex Ho
Brian Sampson
Alex Schreffler
Main Roof Redesign
Façade Redesign
Community Rink Redesign
Conclusion