Research activity in Earth Science
Download
Report
Transcript Research activity in Earth Science
Enhanced oil recovery using CO2
The North Sea, an Opportunity?
Jon Gluyas
Durham Energy Institute, UK
Carbon Capture & Storage,
Geological Society of London
- 15th September 2010 -
Outline
•
•
•
•
•
•
•
CO2-EOR – a long history
UK oil reserves
UKCS – the EOR prize
UK industrial CO2 production
Project timing
Costing the earth & saving the planet
The CO2-EOR heritage
CO2-EOR – A Long History
• Initiated 1970s in
response to oil crisis
• Texas at forefront of
technology & leads the
way today
• Permian Basin in NW
Texas is the primary
injection area
• 1000s km 32” pipeline &
associated infrastructure
developed
• Natural & anthropogenic
CO2 sources used
CO2-EOR – Technology
• Water Alternating Gas (WAG)
– CO2 injected to swell oil and increase fluidity
– H2O injection to displace oil to production wells
• Gravity Stable Gas Injection (GSGI)
– CO2 injected at field crest
– Stabilising pressure and promoting gravity drainage
• Miscible flood – critical CO2 dissolved in oil
– swelling oil, viscosity reduced surface tension reduced
• Immiscible CO2 displacement
– Partial dissolution in oil may reduce viscosity substantially
Schematic WAG
http://www.netl.doe.gov/scngo/Petroleum/publications/eordrawings/eordraw.html
How much additional
recovery?
• West Texas 4-12% of STOIIP (observed)
– 60+ projects (~100 world wide)
• US DOE 7-14% of STOIIP (calculated)
• Institute for Energy (Netherlands) 9-18%
STOIIP of UK, Norwegian & Danish fields
(calculated)
How much CO2 is used?
• 0.1 to 0.45 pore volumes injected
• Typically 1 (net*) tonne of CO2 injected
delivers 2.5 to 5 bbl oil (average 3 bbl)
• Tapered WAG (decreasing CO2 volumes)
most effective
*Net = total injected - recycled
UK Oil Fields
From Gluyas & Hichens, 2003
Viking
Graben
Moray Firth &
Central N Sea
UK Offshore Oil Reserve
Proven
Cumulative
Oil
Production in
millions
tonnes
(bnbbl)
3315
(24.9)
Estimated
Ultimate
recovery in
millions
tonnes
(bnbbl)
3723
(27.9)
Probable
P+P
Possible
Maximum
361
(2.7)
4048
(30.4)
360
(2.7)
4444
(33.3)
https://www.og.decc.gov.uk/information/bb_updates/chapters/Table4_3.htm
UKCS Recovery Factors ~45%
• High End - Piper – recovery factor >70%
• Low End - Lyell – recovery factor ~5%
Jayasekera &
Goodyear SPE 75171
UKCS & West Texas Oil Fields
UKCS
• Sandstones
• Most > 2.7 km deep
• Most > 90ºC
• Light oil ~35-40API
• Typically high quality
(permeability – 100s mD)
• Line drive water floods for
secondary recovery
• Low well density
2nd Development Board Meeting
West Texas
• Sandstones & dolomites
• 1.2 to 1.8 km deep
• 15-60ºC
• Light oil 30-42API
• Typically low quality
(permeability 4-16 mD)
• Pattern floods
l
• High well density
UKCS vs West Texas
• West Texas – incremental oil recovery 4-12% of
STOIIP
• CO2 is expected to be miscible (or nearly so)
with current conditions in the UKCS oil
reservoirs
• UKCS fields more permeable and at higher
temperature than those in West Texas – both
factors may favour the North Sea
From Goodyear et al, IEA EOR Caracas 2002
UKCS – The Prize
• Assuming UKCS:
– Reserve of 30,000mmbbl
– STOIIP 30,000/0.45 = 67,000mmbbl
• From West Texas 4-12% additional recovery of STOIIP
– Yields 2,700 – 8,000 mmbbl technical reserves
– Requiring ~1 t CO2 per 3bbl*
• For ~3,000 mmbbl, ~1,000 Mt CO2 required
*range 2.5 to 5 bbl/tonne
UK Industrial CO2 production 2007
• Scotland
19mm tonnes
• North East 21mm tonnes
• Yorkshire 27mm tonnes
& Humberside
UK oil province
100km
http://www.decc.gov.uk/en/content/cms/statistics/climate_change/climate_change.aspx
Supply & Demand
• Assuming all industrial CO2 from the
eastern UK could be available for CO2EOR yields 60-70mm tonnes per annum
• Over a 15-25 year period (ie typical CO2EOR project length) this would use 1
billion tonnes CO2 …. the quantity required
to optimise CO2-EOR in the North Sea
Are UK Oil Fields Ready For
CO2-EOR?
Arbroath
Maureen
Claymore
Ninian
The Time is Right (but don’t wait)
UKCS Shrinking Infrastructure
Jayasekera & Goodyear SPE 75171
UK Security
of Supply
Shortfall in 2010
~15 mm tonnes
Equivalent to
~300,000 bopd
Equivalent to
Initiating ~1/3
potential CO2EOR projects
DECC publication 2008
Costing the Earth?
• For the North Sea
– There is no CO2 infrastructure
– There is no ‘ready’ source of CO2
– The first project will be an enormous commitment
• But in 2003
–
–
–
–
–
WoS to Magnus pipeline laid
~200 miles long
CH4 for WAG
50mmbbl additional reserves
3+ years extra field life
Saving the Planet
• 1bbl of oil contains ≡ 0.42 t CO2 after
combustion
• 1bbl produced by CO2-EOR requires
between 0.4 and 0.2 t CO2
• At best – the process is carbon neutral
• At worst – the process is halving
emissions
CO2-EOR Heritage
• The CO2 production from
eastern UK could ‘power’
CO2-EOR in the North Sea
for 10-15 years per project,
over ~30 year period
• It could deliver:
– Improved security of oil supply
– Infrastructure usable for carbon
capture
– Increased tax revenues over
current projections
Deep aquifer storage area