Transcript EDMs - NuPECC
NuPECC Meeting Edinburgh
Design Study “EDM”
October 10, 2014 | Hans Ströher (Forschungszentrum Jülich)
Novel precision storage rings for Electric Dipole Moment searches
Institut für Kernphysik (IKP) 28. April 2020 Folie 2
CP Violation by EDMs
Electric Dipole Moments violate P- and T-invariance Spin EDM + T + Original illustration by: physicsworld.com
Via CPT theorem, T-violation corresponds to CP-violation
28. April 2020 Institut für Kernphysik (IKP) Folie 3
Science Case
The matter-antimatter asymmetry of the universe: What we should see : What we actually see : equal amount of predominantly matter matter and antimatter almost no antimatter Matter Ratio 10 10 :1 Anti Matter This is one of the big unsolved problems in physics !
28. April 2020 Institut für Kernphysik (IKP) Folie 4
Source(s) of EDMs
Multiple experimental input is required … … to disentangle the fundamental source(s) of EDMs
28. April 2020 Institut für Kernphysik (IKP) Folie 5
Principle of EDM Search
Particle spin alignment along momentum (frozen spin) Radial E-field: torque on spin – rotation out of ring plane
28. April 2020 Institut für Kernphysik (IKP) Folie 6
Frozen Spin
Technique
Left: a polarized charged particle (beam) in a storage ring Spin Momentum Proton:
„ all-electric (E) ring “ magic momentum
Proton, Deuteron, 3 He:
„ all-in-one (E-B) ring “ variable momenta
Right: fixing the horizontal spin along the momentum direction
28. April 2020 Institut für Kernphysik (IKP) Folie 7
Project impact
EDM searches are must-do experiments
Physics Search for
new physics
Matter/antimatter puzzle Complementary to LHC Technology New storage ring design Beyond state-of-the-art equipment Society Capacity development (training, education) International scientific cooperation Cooperation with high-tech industry
The EDM Storage Ring will be a European flagship project !
28. April 2020 Institut für Kernphysik (IKP) Folie 8
Design Study
WP6: Ring Layout WP3: Electrostatic Deflectors WP4: Beam Instrumentation WP5: Beam Polarimetry WP2: Dissemination of results WP1: Consortium Management
28. April 2020 Institut für Kernphysik (IKP) Folie 9
Design Study
WP6: Ring Layout Concept: use of clockwise (false effects and counter-clockwise beams
systematic errors) Proton: „all-electric ring“
one vacuum chamber Proton, deuteron ( 3 He): „E-B ring“
separate beams
28. April 2020 Institut für Kernphysik (IKP) Folie 10
Participants
42 months, 2.8 M € (personnel only)
Deliverable:
CDR
for storage ring
Institut für Kernphysik (IKP) 28. April 2020 Folie 11