DMA Fuel Change-over and MGO Cooling System

www.dma-marine.com

For Retrofit and Newbuilding REV2011041001 E ngineering – P roduction – I nstallation – C ommissioning Specialist in Marine and Offshore HVAC Systems

1

Agenda

1. DMA introduction

2. Background

3. Process of HFO/MGO change over

4. Principle of MGO cooler system

5. Scope of Supply for DMA MGO System

6. Engineering and Design

7. Production and Fabrication

8. Installation

9. Commissioning

2

1. DMA Introduction

DM Alscott

• Factory established in 2003 • JV established in 2008

Together, we do more.

3

2. Background

IMO have ratified 200 NM of the North American coastline as a SECA area by the Aug. 2012 – 0.1% Sulphur effective from January 1 st 2015 4

2. Background

5

3. Process of HFO/MGO change over Change-over valve Preferential position for Cooler Optional position for Cooler

6

3. Process of HFO/MGO change over

1. Regulate the index of engine, around 25~40%.

2. Shut off steam tracing & steam to pre-heater.

3. Monitor viscosity: 2 cSt ~ 20 cSt.

4. ViscoSense (4~20mA) signal input the control box of DMA cooling system.

5. Start DMA cooling system, the chilled water is available in stand-by.

6. Initiate the change-over on touch screen from HFO to MGO.

Then the MGO will add into circulating line gradually.

7. The rate of temperature drop of fuel inlet to the circulating line is controlled to not exceed 2 ℃ per minute.

8. MGO cooler is ready to cool the fuel oil per the viscosity of fuel oil in circulating line.

7

4. Principle of MGO Cooler System

Basing on P&ID, the line, whereas the

3-way Valve

is installed in the cooling water

Temperature Sensor

is mounted at the

Plate Heat Exchanger

oil outlet.

The temperature of fuel outlet will be controlled by the

Controller

.

8

5. Scope of Supply for DMA MGO SYS.

5.1. Fuel change-over valve 5.2. Chiller unit 5.3. Pump unit 5.4. Buffer tank 5.5. PHE Cooler unit 5.6. Accessories

9

5. Scope of Supply for DMA MGO SYS.

Fig. 5.1 Change-over Valve

10

5. Scope of Supply for DMA MGO SYS.

Fig. 5.2 Marine Water-Cooled Chiller

11

5. Scope of Supply for DMA MGO SYS.

Fig. 5.3 Water Pump Unit

12

5. Scope of Supply for DMA MGO SYS.

Fig. 5.4 Buffer Tank

13

5. Scope of Supply for DMA MGO SYS.

Fig. 5.5 Fuel Oil Cooler Unit

14

6. Engineering and Design

6.1. Capacity calculation by Software 15

6. Engineering and Design

6.2. P&ID 16

6. Engineering and Design

6.3. Program for MGO change-over 17

7. Production and Fabrication

7.1. Factory 18

7. Production and Fabrication

7.2. Assembly, Painting, Store 19

8. Installation

8.1. Finding place for plants on vessel 20

8. Installation

8.2. Finding place for control box 21

8. Installation

8.3. Finding cooling-water source for chiller sys.

22

8. Installation

8.4. Finding fresh-water source for chiller sys.

23

8. Installation

8.5. Making foundation for plants 24

8. Installation

8.6. Rigging and mounting 25

8. Installation

8.7. Finding cutting points for AE 26

8. Installation

8.8. Finding cutting point for ME 27

8. Installation

8.9. Making isolated and bypass valves for fuel pump 28

8. Installation

8.10. Connecting fuel piping 29

8. Installation

8.11. Connecting water piping 30

8. Installation

8.12. Making insulation for fuel piping 31

8. Installation

8.13. Routing cable for plants 32

8. Installation

8.14. Mounting change-over valve 33

8. Installation

8.15. Mounting change-over valve 34

9. Commissioning

9.1. Checking wiring 35

9. Commissioning

9.2. Signing check list by Owner 36

9. Commissioning

9.3. Signing check list by Owner 37

9. Commissioning

9.4. Signing check list by Owner 38