PBS COALS
• • • • • • • • •
46 years of operating history 4 th largest coal producer in Pennsylvania, the USA 48,000 acres of land in Somerset County, South Pennsylvania 147 million tons of in-place reserves 251 million tons of measured and indicated resources 12 operating mines with 8 new mines currently permitted 2 cleaning/load out plants Access to 2 major rail lines Experienced and available local workforce
PBS IN THE MARKET PLACE
PBS HAS 14% OF LV PRODUCTION IN THE USA Jim Walter Cliffs Consol
PBS
Alpha Bluestone ArcelorMittal United Other ICG
Total 2007
3 800 3 700 2 500
2 500
3 150 1 350 800 1 000 1 420 50
20 270 2008
4 400 4 200 3 500
2 700
3 200 1 200 1 000 1 200 -85 600
21 915 2009 2010F
5 700 4 500 6 400 5 000
2011F
6 000 4 500
Share'11, %
21% 16% 5 100
3 500
3 450 1 700 6 000
4 000
3 700 1 700 4 500
4 000
3 300 1 700 16%
14%
12% 6% 1 250 1 500 740 1 000
28 440
1 500 2 100 1 160 1 200
32 760
1 500 1 200 1 050 600
28 350
5% 4% 4% 2%
100% PBS is alternative to “big three suppliers” source of low volatile hard coking coal
-Sufficient reserve base -Permits in place Pier space in Newport News and Norfolk, starting from June’2011 – also in Baltimore -Commitments from railroads -Controlled costs
UNDERGROUND MINING
Kimberly Run Deep Mine
• • • •
6 drift access room and pillar mines; 11 continuous mining units Raw production of 2,1 million tons in 2008 with potential to increase to 3,4 million tons in two years Good infrastructure New mines:
•
Kimberly Run drift mine
•
Horning D drift mine
•
Roytown 2 nd unit added Agustus Deep Mine Quecreek Deep Mine Horning
SURFACE MINING
7820 Dragline operating at Buffalo Surface Mine
• • • • •
6 mines operating, 5 additional mines permitted, 5 mines in permitting process 1 dragline site – 44 cubic yard capacity 5 shovel / truck sites – 14 to 33 cubic yard capacity Raw production of 1,2 million tons in 2008 135 company employees and 20 contractor employees Buffalo Surface Mine
PROCESSING FACILITIES Shade Creek Plant
• • •
Shade Creek Plant 600 raw tons per hour 4,5 million raw tons per annum (3,4 million clean tons) 10’000 ton train load-out on Norfolk Southern (100 tons per rail car)
PROCESSING FACILITIES Cambria Plant
• • •
Cambria Rebuilt and upgraded to 400 raw tons per hour 2,7 million raw tons per annum (2,0 million clean tons) 7’200 ton train load-out on CSX rail line (90 tons per car)
Cambria under construction Construction just completed Cambria Rail Load Out
SUPERIOR MARKET ACCESS
25 days to India 30 days to China
• • • •
Well-developed infrastructure Railroad flexibility Access to port piers in Baltimore and Norfolk Proximity to major seaborne markets
KEY CLIENTS OF PBS COALS
PBS Coals
PBS COAL INC. / SEVERSTAL RESOURCES CONTACTS
For additional information please contact: Yevgeny Shmakov Senior Sales Manager Severstal Resources Klary Tsetkin Str. 2/3 Moscow, 127299 Russia Office: +7 (495) 981 09 10, ext. 6728 Fax: +7 (495) 981 09 18 Mobile: +7 (917) 501 1612 E-Mail: [email protected] E-Mail: [email protected]
Agents in INDIA
NARESH SHARMA M/s Manali Engineering India 5,6,7,8 3rd floor ,Old Jail Road Civil Lines, Gurgaon Email: [email protected]
website: www.manaliengineering.com
ph 0091-124-4072478,3202478 Mobile:- 09999724168