SCRAP TIRE MARKET DEVELOPMENT BY TERRY GRAY TAG
Download
Report
Transcript SCRAP TIRE MARKET DEVELOPMENT BY TERRY GRAY TAG
SCRAP TIRE MARKET
DEVELOPMENT
BY
TERRY GRAY
TAG RESOURCE RECOVERY
TIRE WORKSHOP 2013
SAN ANTONIO, TEXAS
APRIL 3, 2013
PERSPECTIVE
FIRST PROGRAM IN MINNESOTA IN 1984
MANY U.S. STATES STILL DON’T HAVE
SUCCESSFUL PROGRAMS
<1% UTILIZED IN 1984, BUT ABOUT 80%
IN 2011
MEXICO CAN ACCELERATE ITS GROWTH
BASED ON GOOD AND BAD HISTORICAL
EXPERIENCES
US SCRAP TIRE MARKET
TRENDS: 2005-2011
MAJOR APPLICATIONS
ENERGY
CEMENT KILNS
POWER GENERATION
PAPER MILLS
DEDICATED FACILITIES
PYROLYSIS/GASIFICATION
U.S. TIRE-DERIVED FUEL
MARKET TRENDS: 2005-2011
U.S. TIRE-DERIVED FUEL
MARKETS 2011
CEMENT KILNS
ENVIRONMENTALLY EXCELLENT
ECONOMICALLY ATTRACTIVE
QUICKLY DEVELOPED
GENERALLY WHOLE TIRES, SOME TDF
NEEDS CONSISTENT SOURCE
PROGRAM CORNERSTONE
MODERN CEMENT FACILITY
CEMENT KILN
MANUAL FEED SYSTEM
AIR LOCK
INTO KILN
RAPID COMBUSTION
POWER AND PAPER
INDUSTRIES
SPECIFIC BOILER TYPES INCLUDE
CYCLONE, STOKER-FIRED, CFB
DISPLACES COAL OR OTHER SOLID
FUEL
USES NOMINAL 1” OR 2” TDF, BEAD
WIRE REMOVED
COMPARATIVE TDF
PRODUCTION ECONOMICS
(CHIP SIZE VS TIRES/YR)
CHIP
SIZE
500,000 1,000,000 1,500,000
2.0”
+69%
-11%
-42%
1.5”
+82%
BASIS
-14%
1.0”
+94%
+35%
0%
PYROLYSIS
HISTORICALLY UNSUCCESSFUL
• NO COMMERCIALLY SUCCESSFUL
SYSTEMS IN NORTH AMERICA
• OVER $500 MILLION EXPENDED
• MAJOR COMPANIES AND SMALL
PROMOTERS
CRITICAL ISSUES
TECHNICAL PERFORMANCE
• UNRELIABLE OPERATION
• EXPLOSIONS/FIRES
• ENVIRONMENTAL ISSUES
AIR
CHAR DISPOSAL
ECONOMIC PERFORMANCE
• GAS UTILIZATION
• OIL ONLY BLENDSTOCK
• CHAR MARKET
CIVIL ENGINEERING
LIGHTWEIGHT FILL
DRAINAGE AGGREGATE
WHOLE TIRES IN RETAINING WALL
CONSTRUCTION
Dixon Landing Interchange
PROBLEM: Embankment Constructed
on Bay Mud
SOLUTION: Use TDA for the core of
the embankment
CHEAPEST SOLUTION: Caltrans
saved $470,000
Typical Cross Section
LOW PERMEABILITY SOIL COVER
TWO TIRE SHRED LAYERS
EACH LAYER UP TO 10 FT THICK
COMPRESSIBLE BAY MUD
Spread with bulldozer
Rt. 91 Wall in Riverside, CA
Freeway widening
Objective: show that reduced earth
pressures can reduce overall wall
construction costs
Length: 260 ft
Tires used: 75,000 PTE
Rt. 91 wall cross section
Half of TDA in Place
Potential Future Savings for Walls
Lower pressure on wall less
rebar
Potential reduction = 28 tons/100
ft
Potential cost savings =
$13,000/100 ft
RETAINING WALLS
WHOLE TIRES MECHANICALLY
JOINED TO STABILIZE OR RETAIN
SLOPE
NOT BROADLY APPLIED IN US DUE
TO LABOR COSTS
MINIMAL CAPITAL EXPENSE FOR
SMALL VOLUMES
CRUMB RUBBER
APPLICATIONS
SPORTS SURFACES
MOLDED PRODUCTS
RUBBER-MODIFIED ASPHALT
DECORATIVE MULCH
CRUMB RUBBER
CHARACTERISTICS
SLOW OVERALL MARKET GROWTH
HIGH CAPITAL
HIGH MAINTENANCE
MARKET CHALLENGES
RURAL CONSIDERATIONS
VOLUME SENSITIVITY
REGIONAL PLANS, COLLECTION
CENTERS OR PROCESSING
FACILITIES
MOBILE PROCESSING
CAREFULLY EVALUATE BALE
APPLICATIONS BEFORE STARTING
SUGGESTIONS
FOCUS ON ENERGY (ESPECIALLY
CEMENT KILNS) INITIALLY
DEVELOP CE DESIGN EXPERIENCES
AND PRACTICES
BEGIN TO ENCOURAGE CRUMB
MARKETS, BUT AVOID PREMATURE
OVER-COMMITMENT
PROCESSING EQUIPMENT
APPLICATIONS RANGE FROM WHOLE
TIRES TO FINE POWDER
SPECIFIC EQUIPMENT REQUIRED TO
PRODUCE EACH SIZE PRODUCT
KNOW MARKET BEFORE
PURCHASING EQUIPMENT
KEYS TO SUCCESS
LEARN FROM OTHERS’ SUCCESS AND
FAILURE
EVALUATE BEFORE CHARGING
CHALLENGE “MAGIC” PROPOSALS
RECOGNIZE LOCAL MARKET VARIATIONS
RECOGNIZE REALITY
CONTACT INFORMATION
TERRY GRAY
TAG RESOURCE RECOVERY
EMAIL: [email protected]
PHONE: (281) 463-7552