Blue print for throughput enhancement on HDN

Download Report

Transcript Blue print for throughput enhancement on HDN

Blue print for throughput enhancement on HDN B.V.L.Narayana

SPTM/ RSC/ BRC

Critical issues and redressal  Constraints  CAPACITY CONSTRAINTS ON HDN ROUTES  Terminal constraints  Overcome by  Investments in Strategic capacity expansions

High density network  Consists of  Seven routes  Six feeder routes  Carries  76% of freight GMT  71% of passenger and freight GMT  Accounts for 28% of route KMs

HDN –routes and feeders

ISSUES CONSIDERED  GROWTH PATTERNS OF MAJOR COMMODITIES FOR ALL ROUTES EXCEPT NDLS-HWH and NDLS-BB  STEEL  COAL  CONTAINERS  IRON ORE  PORT CONNECTIVITY  LRDSS PROJECTIONS FROM 2005-06

Eleventh plan targets

Methodology  Collate all line capacity statements for all HDN routes  Project capacity utilization till 2011-12  Identify critical sections  Validated by projections from LRDSS  Review with zonal railways  Estimate level of investments

Recommendations  124 works  14185 crores investments  Over and above DFC projects  Investment needs for 25t Axle load separately done

LRDSS  an objective tool for planning and prioritizing capacity enhancement projects decades.

based on traffic projections over the next two  Started in 1994  Strategic tool for long term investment planning

LRDSS  The system consists of a comprehensive set of modules which cover different aspects of the investment analysis viz:        1) 2) 3) Facility Performance Module Market Analysis Module Traffic Forecasting Module 4) 5) Traffic Assignment Module Benefit Cost Analysis Module 6) Terminal Analysis Module 7) Multi-modal Corridor Analysis Module

LRDSS  Inputs required  Production and consumption forecasts  From planning commission  Ministries  Traffic surveys  Market surveys for customer sensitivity  Cost data  Field Level Data To Simulate Train Running On a Section

Broad Structure of Model – Phase-II

Market Analysis Facility Performance Traffic Forecasting Traffic Assignment Cost Benefit Analysis Financial Forecasting

12