March 7, 2013 Dr. Loren C. Scott Loren C. Scott & Associates, Inc.

www.lorencscottassociates.com

Natural Gas

A Key Driver In Louisiana & Its Ports

7 6 9 8 5 4 3 2 1 1990 Figure 4: Price of Natural Gas 2013 2014 PGA $3.00 $3.10

Low $2.00 $2.00

High $4.00 $4.00

1995

PGA

2000 2005

PGAL

2010

PGAH

Logistical Issues

• • •

Each hydraulic fracking stage requires:

– –

300,000 gallons of water 200 tons of sand Port of Caddo-Bossier – space for firms providing these products & services 20-40% of fluid solids used in fracking flow back to the surface as hazardous waste and require transportation to other well sites or treatment and/or disposal sites

Subsurface water contamination?

• •

Significant distance between frac zone and aquifer Proper casing & cementing and regulatory oversight are important

Fracking and Contamination of Drinking Water

Hydraulic fracking is subject to both federal and state regulations

There have been no instances of fracking causing contamination of drinking water.

Michael Economides in Offshore Engineer 11/11

• •

2011:

– –

35,000 wells drilled in U.S.

120,000 hydraulic fracturing treatments executed; 4 stages per well on average

Zero cases of drinking water contamination 60 years of fracturing

1.2 million wells

No scientific cases of drinking water contamination

Energy’s Political Influence Has Widened Markedly

Increased Demand For Port Services: #1 Boom in Manufacturing

Manufacturing in general; Chemicals specifically

Three Major Benefits to Chemical Producers

Makeup in Louisiana

Sector Total Basic chemicals Resins, synthetic rubber, artificial synthetic fibers & filaments Pesticides, fertilizers & other agricultural chemicals Plastics products manufacturing Rubber products manufacturing Value of Shipments* $58.2 Billion $37.4 Billion $7.4 Billion $4.6 Billion $0.8 Billion $0.3 Billion

Price of Major Input has Declined

• • •

Ammonia fertilizer From natural gas liquids like ethane we get ethylene which is the foundation of

– – – – –

Food packaging, toys, house wares Swimming pool liners, vinyl pipes Pantyhose, clothing, carpets Bottles, cups Tires, foot ware, auto antifreeze Clean burning boiler fuel

$18 $16 $14 $12 $10 $8 $6 $4 $2 $0

Natural Gas Prices by Region ($/mmBtu)

Japan LNG Import Price Europe Import Price Index Henry Hub

3rd: Naphtha v. Ethane

Ethylene made of

In Europe:

naphtha derived from oil

Oil @ $100 $1,400 to make ton of ethylene

In U.S.

Ethane, derived from natural gas

$730 to make ton of ethylene

Baton Rouge: Chemical & Related Construction

Westlake Chemical: $466 mm chlor-alkali in Geismar – 100 new jobs, & expansion at site; Construction underway 7/12

• •

$300 mm upgrade at Georgia Pacific Air Liquid – Ascension:

$85 mm capex; 5 jobs

DMC Carter Chambers – Baton Rouge:

$10 mm capex; 80 jobs

Baton Rouge: Chemical & Related Construction

Methanex Corp-Geismar (7/12)

Moving idle methanol plant from Chile to Ascension Parish

$550 mm capex; 130 new jobs; Avg salary = $56,000; open late 2014; hiring starts before end 2012.

Fitch Rating says second, equal size, plant to be moved here as well (12/11/12)

Baton Rouge: Chemical & Related Construction

• •

Shintech – Plaquemine (4/12)

New $120mm plant to make key ingredient in latex paint; 30 new jobs Avalon Rare Metals – Geismar

Feasibility study being conducted $300 million rare earth elements separation plant

Complete study 2013-II; +175 jobs

Baton Rouge: Chemical & Related Construction

BASF

New $120 mm acid plant (7/12); 11 jobs; At engineering/ground prep phase; Ground breaking 10/12; Done by end 2013.

Two surfactant plants; $120 mm; groundbreaking spring ’12; end 2013-II

Several smaller projects totaling $100 mm; 50% chance

Less than 25% chance on couple of mega projects ($500 mm - $1 bill); competing with TX

Baton Rouge: Chemical & Related Construction

• • • •

Honeywell: $33 mm expansion (7/11)

Start 12/11; end 2013; 11 new jobs Williams: $350-$400 mm to increase ethylene production at Geismar plant (9/11) Huntsman – Geismar: (8/12)

Commissioned engineering design study to increase size of plant ExxonMobil - Baton Rouge: (9/12)

$215 mm in facility upgrades

State-of-the-art synthetic aviation oil blending center in Port Allen

Facility in Port Allen to be largest producer of finished lubricants in the world

Baton Rouge: Chemical & Related Construction

SNF Polymer Project: Iberville Parish

$362 mm capex over 5 years; 1 st fall ‘11 unit completed

500 direct jobs & 100 contract employees (100 in 2011; 100 each additional year)

Emerson Process Management - Gonzales

$10 mm expansion & regional HQ; +50 jobs

Make and refurbish valves for chemical industry

Baton Rouge: Chemical & Related Construction

• •

Cf Industries – Donaldsonville (11/12)

– –

$2.1 bill to build nation’s largest nitrogen plant Finish 2016; +93 jobs Waller Marine – Port of Baton Rouge (3/13)

$200-$400 mm small LNG facility

Service supply vessels that have to start using cleaner-burning, low sulfur diesel fuels in 2015

45 jobs; operational by mid-to-late 2014

Potentials

BioNitrogen Corp. – Pointe Coupe (3/13)

$1.25 billion in tax exempt bonds preliminarily approved by LA Community Development Authority;

letter of intent signed to buy 250 acres of land next to Pointe Coupe Parish Port

Build 5 plants to convert agricultural waste into fertilizer; 260 jobs

Start construction 2014; Open 2015.

New Orleans MSA Construction

• •

Dow: Restarting cracker in St. Charles Parish

$400 mm capex ; 64 jobs; start 2013-I Dyno Nobel International – Waggaman (5/12)

Feasibility study for $800 mm ammonia production facility @ existing Cornerstone Chemical Company site.

+60 new jobs; decision early 2013

Lake Charles Construction Potential

• •

Sasol Gas-to-Liquids Facility

96,000 bbls per day of diesel, naphtha & other chemical products; 2 stages of 48,000 each; 1 st opens 2018; 2 nd opens year later

Up to $11 -14 bill over 2013-17;Front End Engineering Design (FEED) started 12/12.

700 jobs; $95 mm payroll; Feasibility study underway; due late 2012 Sasol Ethylene Cracker & derivatives complex

– – –

$5-7 bill over 2013-17; 528 Sasol jobs + 358 contract workers; $58.9 mm payroll Feasibility study to be completed in late 2012.

Lake Charles Construction Potential

G2X Energy (1/16/13)

$1.3 billion plant at Port of Lake Charles to turn natural gas into gasoline

Construction 2014-17; hiring complete by end of 2015

243 jobs @ $66,500

Final decision by end of 2013

Other non-MSA Developments

• •

Mosaic – St James Parish (12/12)

– – –

FED being done on $700 mm ammonia plant 53 new jobs @ $83,000 Make decision mid 2013; Construction start – 2014; operation – 2016 Zero Emission Energy – St. James (3/13)

$1.3 bill ethanol plant---largest in North America-- across from Nucor

– –

63 new jobs @ $66,500 Construction start 2013-IV; end mid-2016

Other non-MSA Developments: Potentials

Shell Gas-to-Diesel Refinery (4/12)

$10 billion plant; feasibility study underway: TX v LA

2 years to develop detailed engineering plans to determine if feasible

Between LA & TX; One of two parishes in LA; abundant natural gas is key

Manufacturing in general should gain worldwide market share Cheap energy off-setting cheap labor advantage Example: Benteler Steel $900 mm capex; 675 jobs Port of Caddo Bossier

Potentials

Ozkan Steel USA – BTR MSA (1/13)

Looking at sites on River for $150 mm steel plant; 350 jobs

Phase 1 – facility to sort scrap metal (summer 2013)

Phase 2 – melting plant (June 2014)

Phase 3 – rolling plant (June 2015)

300,000 tons of specialty steel for shipbuilders

Potential Problem for Chemicals: European Shale Gas Plays

European Barriers to Shale Development

• • •

Generally, mineral rights owned by government, not individuals.

Greens more influential with government than individuals

Lease & royalty payments make locals more tolerant of drilling activity Little geological data on foreign shale deposits.

U.S.: tens of thousands of wells drilled with geologic data publicly available via state regulators

Little known about rocks overseas & whether characteristics make fracking possible Once found little to no infrastructure in place to move product to market.

Thank God for France!

• • •

May 11, 2011 National Assembly voted to prohibit hydraulic fracing in the country Bulgaria recently disallowed as well 11/21/12: European Parliament implemented a Europe-wide moratorium on shale gas development

#2 Watch Power producers

EPA attacks on coal-fired power plants: an alternative low cost fuel is great

Power Use of Natural Gas

• •

Next 2-3 years little change After that, between 35-75 gigawatts of coal-fired power plants will be shut down

Amount depends on how rapidly EPA regulations on cross-state pollution & mercury emissions are implemented

Baton Rouge: Chemical & Related Construction

Trafigura:

Re-Opened Ormet’s Burnside terminal @ $100 mm as Impala Warehousing

State-of-the-art bulk terminal for coal, bauxite, and alumina

Adding $270 mm coal export terminal: design phase (7/12)

Plaquemines Port: Doubling Coal Exporting

• • •

IMT Coal

$12 mm expansion Ram Terminals:

$150 mm on new terminal Oiltanking Inc.

$136 mm project

#3 Watch LNG Exports

Construction in Lake Charles Future:LNG

Re-Build for Export Terminal: Cheniere Energy

Sabine Pass LNG: $5.6 billion project for first 2 of 4 trains – convert import/export terminal; started construction 8/12;

Now has four 20-year contracts for 10.5 bcf annually. (1/12); BG Group – Britain; Gas Natural Fenosa – Spain; GAIL – India; KOGAS;

– – –

2 nd train $4.5 bill contract let to Bechtel 12/12. FEED & Permitting work started on 3 rd train 12/12. Construction of 3 for 5 th rd and 4 train to be built. th units determined by demand. New agreement with Total Gas & Power (9/12) will allow

Approval from DOE given to export LNG (5/11) to non free trade partners of U.S. (valuable asset); Japan & Spain not free trade partners & import 4.12 tcf per year.

• •

LNG Retrofit Re-Build for Export Terminal

Cameron LNG (Sempra) asked FERC for 2-year authority to re-export; Inked deals w Mitsubishi and Mitsui Corps to work together in exchange for 1.7 bcfd (620 bcf annually) of export capacity to Japan. Plus GDF Suez of France agreed to about 0.4 bcfd. Total 657 BCF annually. Start construction late 2013; operate 2016. $6 billion project; 130 jobs. Asked FERC for permission to begin building 12/12

Lake Charles Exports, LLC (Trunkline)

Received DOE permission to export domestic gas from its terminal 7/11; 2 bcfd for 25 years (8/11)

Applied to FERC to start construction by 2014; ship by 2018 (4/12)

Financial support from BG Group & Southern Union Note: LNG export price - $18 mmbtu

Huge Construction Potential

Magnolia LNG (1/18/13)

$2.2 bill natural gas liqufaction plant at Port of Lake Charles;

Final decision late 2014; start construction 2015

45 jobs @ $75,000

Australian company

Careful! Who will head EPA & DOE?

Impact of GOM Recovery on Ports along Southern Coast:

Fig. 2: Oil Prices 120 100 80 60 2012 2013 2014 Average $95 $95 $95 Low $80 $80 High $110 $110 40 20 0 90 92 94 96 98

POA

00 02

POAL

04 06 08

POAH

10 12 14

The Recovery

• • •

Pre-spill: Post-spill: 33 11 rigs in deep waters rigs 11 deepwater drill ships left the GOM after spill

• •

As of 5/12-- 24 rigs in deep waters Good news: 9 new drill ships or semi submersibles on way & in place by 2013-II

GOM Deepwater Expected Rig Count: ISI

• • •

2013: 36 Mid 2014: 50 2015-17: 60+

Benefits of the Gulf?

• • • • • •

Elephant finds

Chevron St. Malo Field, lower tertiary: 13,000 bbl/d (Bakken: 1,000 b/d) Straddles world’s biggest consumer Politically stable area (Argentina alarm) Cost of taxes, royalties, and regulations among lowest in world Lots of opportunities from small, low risk prospects to giant targets in extreme conditions Vast network of pipelines & refineries

My Favorite “Blonde Energy” Story

“I lost my 710 cap.”

March 7, 2013 Dr. Loren C. Scott Loren C. Scott & Associates, Inc.

www.lorencscottassociates.com