Transcript Summary

Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 25, 2014

Gas Well Deliquification Breakout Session Ask Experts about Troubleshooting Plunger Lift Wells

Lynn Rowlan, Echometer Company Dave Cosby, Shale Tec LLC Dave Green, Well Master Stan Lusk, Patriot Artificial Lift Mark Graeve and Mike Elliott, WPX Energy

Breakout Session Details

Session Purpose: 1. Experts = Instructors from Plunger Lift Class 102 2. Our Goal was to facilitate discussion.

Number of Attendees ~ 100

Operating Companies ~ 80% Duration of Session – Full Time Allotted from 2:30-3:45 February 25, 2014 2014 Gas Well Workshop 2

Primary Discussion Points

1. Operate Plunger Lift w/Packer a.

NEED 5 TIMES MORE GAS b. PLUNGER NEEDS TO FALL AGAINST FLOW c.

USE VELOCITY FOR CONTROL d. TRY USING FORMATION FRACS TO STORE ENERGY AND TRY TO NOT SHOOT A HOLE IN TUBING e.

SET PACKER CLOSE TO TOP OF PERFS – MAYBE 3 JOINTS 2. How to Optimize Plunger Lift w/Packer a.

CONTROL ARRIVAL VELOCITY TO OBTAIN REPEATABLE CYCLES WITH SMALL LIQUID LOAD b. INITIALLY SELECT PLUNGER BASED ON NO AFTER FLOW c.

ADJUST AFTERFLOW TO CONTROL VELOCITY February 25, 2014 2014 Gas Well Workshop 3

Primary Discussion Points

3. Can Foamer Help Plunger Lift a. USUALLY DOES NOT HELP b. GASSY COLUMN TALLER / REQUIRES MORE SHUT IN TIME TO FALL THROUGH 4. How do you pick a plunger a. SELECT FAST PLUNGER EARLY IN LIFE TO MINIMIZE LIQUID LOAD PER CYCLE b. IF SAND, THEN SOLID OR BRUSH c. USE PAD IF PRESSURE BUILD IS SLOW d. USE RULE OF THUMB GAS MUST GREATER THAN 400 SCF/BBL LIQUID/1000 FT DEPTH February 25, 2014 2014 Gas Well Workshop 4

Primary Discussion Points

5. Design Plunger Cycle a. USE FOSS&GAUL EXCEL SPREADSHEET b. USE PRODOP FROM PLTECH LLC 6. Tubing Intake Set Depth a. SET TUBING DEEP INTO PERFORATED INTERVAL b. IF SET ABOVE PERFS, THEN MUST USE STANDING VALVE 7.

c. USA COMPANIES? ARE USING STANDING VALVES Limit Restrictions ~ Use KIMRAY 1” or larger hole February 25, 2014 2014 Gas Well Workshop 5

Primary Discussion Points

6. Should you throttle flow a. NEVER DURING UNLOADING b. THROTTLE TO CONTROL PRESSURE OF PREVENT DAMAGE c. DONE TO KEEP GAS RATE FROM OVER-RANGING METER 7. Use 2 stage plunger system a. HIGH GAS RATE CAN UNSEAT TOOL b. IF WELL IS STRUGGLING TO RUN CONVENTIONAL c. USE SOLID IN BOTTOM AND GOOD SEALING PLUNGER IN TOP d.

HARD TO USE IN “S” SHAPED WELL February 25, 2014 2014 Gas Well Workshop 6

Primary Discussion Points

8. Set Depth in Horizontal Well a. NORMAL MAX INCLINATION IS 60 DEG.

b. TRIED A COUPLE AT 70 DEG.

c. TOE UP CONSIDERED BEST d. MORE PRODUCTION IF SET IN DEVIATION e. USE SOLID BECAUSE PADS COLLAPSE FROM GRAVITY f. 1 ARKOMO SHALE WEL @ 74 DEG.

g. IS THE PLUNGER GETTING TO BOTTOM h. 2 PIECE MAXIMUM IS 60 DEG February 25, 2014 2014 Gas Well Workshop 7

Primary Discussion Points

9. Gas Lift Assisted Plunger Lift a. USE 2-PIECE PLUNGER i.

WITH MINIMUM (ALMOST NO) SHUT-IN ii. WITH MINIMAL IMPACT ON TUBING PSI iii.

WITH “NO” IMPACT ON GAS LIFT SYSTEM b. WATCH OUT FOR THIEF ZONE IN DEPLETED WELLS TAKING LIFT GAS February 25, 2014 2014 Gas Well Workshop 8

Summary

More topics discussed than time permits – not everything recorded

Lot of interest

YES –This Session Should Be Repeated in the Future

February 25, 2014 2014 Gas Well Workshop 9

Copyright

Rights to this presentation are owned by the company(ies) and/or author(s) listed on the title page. By submitting this presentation to the Gas Well Deliquification Workshop, they grant to the Workshop, the Artificial Lift Research and Development Council (ALRDC), and the Southwestern Petroleum Short Course (SWPSC), rights to:

– –

Display the presentation at the Workshop.

Place it on the www.alrdc.com web site, with access to the site to be as directed by the Workshop Steering Committee.

Place it on a CD for distribution and/or sale as directed by the Workshop Steering Committee.

Other uses of this presentation are prohibited without the expressed written permission of the company(ies) and/or author(s) who own it and the Workshop Steering Committee. 2013 Gas Well Workshop 10 February 25, 2014

Disclaimer

The following disclaimer shall be included as the last page of a Technical Presentation or Continuing Education Course. A similar disclaimer is included on the front page of the Gas Well Deliquification Web Site.

The Artificial Lift Research and Development Council and its officers and trustees, and the Gas Well Deliquification Workshop Steering Committee members, and their supporting organizations and companies (here-in-after referred to as the Sponsoring Organizations), and the author(s) of this Technical Presentation or Continuing Education Training Course and their company(ies), provide this presentation and/or training material at the Gas Well Deliquification Workshop "as is" without any warranty of any kind, express or implied, as to the accuracy of the information or the products or services referred to by any presenter (in so far as such warranties may be excluded under any relevant law) and these members and their companies will not be liable for unlawful actions and any losses or damage that may result from use of any presentation as a consequence of any inaccuracies in, or any omission from, the information which therein may be contained.

The views, opinions, and conclusions expressed in these presentations and/or training materials are those of the author and not necessarily those of the Sponsoring Organizations. The author is solely responsible for the content of the materials.

The Sponsoring Organizations cannot and do not warrant the accuracy of these documents beyond the source documents, although we do make every attempt to work from authoritative sources. The Sponsoring Organizations provide these presentations and/or training materials as a service. The Sponsoring Organizations make no representations or warranties, express or implied, with respect to the presentations and/or training materials, or any part thereof, including any warrantees of title, non-infringement of copyright or patent rights of others, merchantability, or fitness or suitability for any purpose. 2014 Gas Well Workshop 11 February 25, 2014