Transcript Expanded Appeals Process Training
A Great L-EAP Forward:
Successes and Challenges in Implementing
FEMA’s Expanded Appeals Process
Todd Steiner
FEMA
Maggie Mathis, CFM
RAMPP
Background
FEMA’s regulations call for public notification and a
statutory appeal period when new or modified flood
elevations are issued
FEMA initiates due process through:
A Federal Register publication
Notifying the community CEO through a proposed flood
hazard determination (90-day start) letter or Letter of Map
Revision (LOMR) document
Publication of a newspaper notice twice following notification
of the community CEO
Publication of a notice on FEMA Flood Hazard Mapping
public website
2
Flood Hazard Determinations notice
Appeal policy previously
applied to Base Flood
Elevation (BFE)/flood
depth determinations
only
Excerpt from a old format notice
3
The Expanded Appeals Process
(EAP)
Effective December 1, 2011
Same due process procedures previously only
applied to BFE determinations now apply to:
The addition or modification of any Special Flood Hazard
Area (SFHA) boundary or zone designation
Zones A, AO, AH, A1-A30, AE, A99, AR, AR/A1-A30,
AR/AE, AR/AO, AR/AH, AR/A, VO, V1-V30, VE, and V
The addition or modification of any regulatory floodway
Applies to both studies and LOMRs
4
Why the Change?
FEMA’s Office of Chief Counsel recommended a
broader interpretation of what can be appealed
More consistent approach - changes in SFHA, zone,
and regulatory floodway boundaries can have the
same impact as a BFE/flood depth change
5
Ancillary Benefits
Simplified Federal Register publications and online
notices
No longer include flood source names or detailed BFE/flood
depth listings
Less time consuming and costly to prepare
Less costly publication
Fewer delays due to corrections
All preliminary FIRMs and FIS reports and LOMR
determination documents/attachments are now available
online
6
EAP Notices
7
When Does the EAP Apply?
All studies for which preliminary FIRMs are issued
on or after December 1, 2011
All studies for which a proposed flood hazard
determination notice (formerly a proposed rule) is
published in the Federal Register on or after
December 1, 2011
LOMRs issued on or after December 1, 2011
8
When Does the EAP Apply? (cont.)
The EAP will apply to revised preliminary FIRMs that are
the result of flood hazard changes unrelated to an appeal
resolution
The appeal period will apply to all revised preliminary AND
preliminary FIRM panels
Previously published FR proposed rule must be withdrawn
(if applicable) and a new EAP notice published
9
When Does the EAP Apply? (cont.)
Any exceptions to the criteria
must be presented to FEMA
HQ for consideration
Consistency in our replies to
requests from ineligible
communities that they be
afforded the EAP is needed –
guidance and pat replies will
be shared widely
10
Resources
Resources:
FEMA Procedure Memorandum No. 57: Expanded
Appeals Process
Criteria for Appeals of Flood Insurance Rate Maps
EAP Public Fact Sheets
Updated web content on FEMA.gov
11
Appeal Criteria
All appeals must be supported by
scientific and technical data
‘Criteria for Appeals of Flood
Insurance Rate Maps’ developed to
support PM 57
Establishes areas eligible for appeal
Identifies documentation needed to
support an appeal of each flood hazard
type (e.g. modeling, topography, etc)
12
Common Questions
Are we likely to receive more appeals and experience
more study delays?
Have the data requirements for appeal submittals
changed as a result of the EAP?
If only the SFHA boundary for a flooding source was
adjusted based on new topographic data (i.e., no new
hydrologic/hydraulic analyses have been performed
and BFEs have not changed), does that mean that the
BFEs along the flooding source can be appealed?
13
Common Questions
Is an appeal period required if an SFHA or portion of an SFHA is
removed from the FIRM, rather than added?
If there was an error or omission on a Federal Register
notice published prior to December 1, 2011, will the study
now be processed under the EAP?
14
EAP: Status of Implementation
Studies
46 Federal Register publications
90-day appeal periods have been initiated for 34 of
those studies
Requests for the EAP to be applied to ineligible
communities have not been received to date
Posting of the Preliminary Map
Products has been received
positively
15
EAP: Status of Implementation
LOMRs
145 Federal Register publications and appeal periods
initiated to date.
Concerns over the more lengthy process
have not materialized
“Changes to FEMA’s Appeal
Process” notice drawing
processing questions
16
What’s Next
Coming soon….Updates to:
Appeals, Revisions, and Amendments to National Flood
Insurance Program Maps: A Guide for Community Officials
Adoption of Flood Insurance Rate Maps by Participating
Communities (FEMA 495)
Guidelines and Standards for Flood Risk Analysis and
Mapping (formerly G & S for Flood Hazard Mapping Partners)
Document Control Procedures Manual
Long term ….
FEMA-based web solution for posting of Preliminary FIRMs and FIS
reports, LOMRs
17
For Further Information
Contacts:
FEMA
Todd Steiner
[email protected]
PTS Leads
Maggie Mathis
[email protected]
Paul Slonac
[email protected]
Mike Gilliam
[email protected]
18
Questions?