KHABAROVSK REFINERY
HYDROPROCESSING PROJECT
ARU / SWS – MAIN EQUIPMENT
TRAINING COURSE
APRIL 29th – MAY 3rd 2013, MADRID, SPAIN
MAIN EQUIPMENT DESCRIPTION
ARU IS EQUIPPED WITH THE FOLLOWING MAIN EQUIPMENT:
1) RICH AMINE FLASH DRUM
2) AMINE REGENERATOR
3) AMINE SUMP DRUM
4) STORAGE AND DELIVERY SECTION
2
RICH AMINE FLASH DRUM
MAIN FEATURES
Packed column on top
of the drum
Internal skimming
pot
Rich DEA solution
Blanketed with inert
gas
3
RICH AMINE FLASH DRUM
MAIN PARAMETERS:
Pressure controlled
Amount of cold lean amine sent to
scrubber (around 1.5 m3/h)
OPERATING CONDITIONS
Temperature
(°C)
Pressure
(kg/cm2 g)
Operating
60
0.9
Design
160
4.5
4
AMINE REGENERATOR
MAIN FEATURES
Valve type trays
Chimney tray
Top section in SS
DEA solution
Internal skimming pot
in the Reflux Drum
5
AMINE REGENERATOR
MAIN PARAMETERS:
Rich Amine / Steam ratio in the Reboiler
Acid Gas to SRU temperature = 55°C
Regenerator Reflux Drum pressure = 0.9
kg/cm2 g
Rich Amine to Regen. = 93 °C
Temperature of lean amine solution sent to
Storage and delivery section (92°C)
Demi Water make-up to reflux drum
OPERATING CONDITIONS Temperature
Operating
Design
(°C)
Pressure
(kg/cm2 g)
Top
115
1.0
Bottom
124
1.2
Top
160
5/FV
Bottom
160
5/FV
MAIN LIMITATIONS
Amine degradation
Antifoam solution needed
6
AMINE SUMP DRUM
MAIN FEATURES
Pure DEA loading
facilities
Blanketed with inert
gas
Installed inside pit
7
AMINE SUMP DRUM
MAIN LIMITATIONS
Amine degradation
OPERATING CONDITIONS
Temperature: 55 °C
Pressure:0.1 kg/cm2 g
8
STORAGE AND DELIVERY SECTION
MAIN FEATURES
Blanketed with inert
gas
Air louvers
9
STORAGE AND DELIVERY SECTION
MAIN PARAMETERS:
Temperature of lean amine solution sent to
HCU Section (55°C)
Amount of amine sent to filtering system
(around 15%)
Amount of cold lean amine sent to
Scrubber on Rich Amine Flash Drum
(around 1.5 m3/h)
OPERATING CONDITIONS
Temperature
(°C)
Pressure
(kg/cm2 g)
Operating
55
ATM
Design
200
HYDR.+0.015
MAIN LIMITATIONS
Amine degradation
10
MAIN EQUIPMENT DESCRIPTION
SWS IS EQUIPPED WITH THE FOLLOWING MAIN EQUIPMENT:
1) SOUR WATER FEED SURGE DRUM
2) SOUR WATER STRIPPER
11
SOUR WATER FEED SURGE DRUM
MAIN FEATURES
Internal skimming
pot
Blanketed with inert
gas
12
SOUR WATER FEED SURGE DRUM
MAIN PARAMETERS:
Pressure controlled
OPERATING CONDITIONS
Temperature
(°C)
Pressure
(kg/cm2 g)
Operating
51
0.55
Design
160
4.5
13
SOUR WATER STRIPPER
MAIN FEATURES
Valve type trays
Chimney tray
(top and bottom)
Top section in SS
14
SOUR WATER STRIPPER
MAIN PARAMETERS:
SW Acid Gas to SRU temperature = 85°C
Sour Water to Stripper = 84 °C
Temperature of pumparound return to
Stripper = 65°C
Temperature of stripped water sent to
HCU/DHT = 90°C
Temperature of stripped water sent to
WWT = 40°C
OPERATING CONDITIONS Temperature
Operating
Design
(°C)
Pressure
(kg/cm2 g)
Top
85
0.9
Bottom
123
1.2
Top
160
5/FV
Bottom
160
5/FV
MAIN LIMITATIONS
Surface temperature of the
acid gas line
15
Rome
Viale Castello della Magliana 75
00148 - Italy
Ph. +39 06 602161
Fax +39 06 65793002
[email protected] – www.tecnimontkt.it
16
THANK YOU FOR THE ATTENTION