Bouw eerste retrofi binnenvaartschip van Europa

Download Report

Transcript Bouw eerste retrofi binnenvaartschip van Europa

LNG-REFIT
“EIGER – NORDWAND”
Ad Schroot,
LNG in de binnenvaart en milieu
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
1
Vessel particulars
“ Eiger-Nordwand”
Built
Overall lenght
Width
Draft
Tonnage
Capacity (4 layers)
Engines
2000
177 meter
11,45 meter
2,56 meter
5300 tonnes
348 TEU
2x 900 kW
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
2
Considerations
•
•
•
•
•
Which engine type?
The size of the tank?
Where do we place the tank?
Cape stone generator?
Start date of the refit?
Challenges
•
•
•
•
•
Ship built in 2000.
Drawings from 1999.
No digital drawings.
Ventilation, and ventstack position.
No standard procedures availible
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
3
2D Ship drawings
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
4
2D Ship drawings
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
5
REFIT Arrangement
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
6
REFIT Detailed design
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
7
REFIT Detailed design
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
8
Roof Strength Calculation
Simulation of falling container 4.5 ton from 5m equals 1230kN!
Load in center of main beam
Deformation : 10mm
Ad Schroot
Load next to main beam
Deformation : 20mm
Co-financed by European Union
Trans-European Transport Network (TEN-T)
9
BUNOVA CFD Simulation
Goal :
Approach :
Analysis of the explosion safety in case of gas leaks, by investigating
the ventilation rate of the LNG tank room.
Only the air flow is calculated, no actual gas leaks are simulated. It is widely accepted that for a semi enclosed
space, such as the LNG room of the Eiger, the ventilation is sufficient if the refreshment rate is more than 12 times
per hour. So the residence time in each part of the room should be smaller than 3600/12 = 300 seconds.
Conclusion : On average every 220 seconds, the engine room is refreshed
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
10
CCR recommendation
• In February we received the
CCR Recommendation
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
11
Meetings
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
12
Bunkering
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
13
Bunkering Procedure
Ad Schroot
Co-financed by European Union
Trans-European Transport Network (TEN-T)
14
Project Summery
•
•
•
•
•
•
•
•
•
•
•
•
•
Feb 2012
Jun 2012
July 2012
Dec 2012
Feb 2013
Mar 2013
Aug 2013
Sept 2013
Oct 2013
Feb 2014
Apr 2014
Jun 2014
Jul 2014
Ad Schroot
•
•
•
•
•
•
•
•
•
•
•
•
•
Start project, initial discussions
Conceptual design by project team
Presentation to LRoS
Introduction to Ministery of Infrastructure (IL&T, I&M)
Submission call for TEN-T project
Start detailed design
Presentation at ADN meeting in Geneve
Presentation at CCR meeting in Strasbourg
HAZID study by LROS
Recommendation of CCR is recieved
Start refit
Tests, commissioning & trials
Refitted ship started its normal operations
Co-financed by European Union
Trans-European Transport Network (TEN-T)
15
Questions ?