Contaminated land: dealing with
hydrocarbon contamination
Remediation options for
petroleum hydrocarboncontaminated soil and
groundwater
Contents of presentation
Remedial objectives
Ex situ remediation techniques
In situ remediation techniques
Monitored natural attenuation
Some comments on NAPL remediation
Some comments on MTBE
Monitoring and verification
Environmental Simulations International
Remedial objectives
Risk management (derived from risk
assessment)
– Remove the source
– Break the pathway
– Remove the receptor
Not usually an option!
Which contaminants?
Appropriate cost-benefit performance
Are there specific local requirements?
Previous CIEH training on remediation technologies
Environmental Simulations International
Remediation selection and
licensing
Beyond the scope of this presentation!
– But feel free to cover in discussion
– Licensing might include
– Planning requirements
– Mobile plant licence
– Waste management licence
– IPPC
Environmental Simulations International
Main remedial options for
petroleum hydrocarbons
Approach
Applied at
Source
Pathway
Move receptor
Restrict access
Excavate & treat
Pump & treat
Barriers/PRB’s
SVE & related
In situ bioremediation
Thermal techniques
Receptor
()
MNA
Environmental Simulations International
Ex situ remediation
Soil
– Excavate
– Excavate
– Excavate
– Excavate
and
and
and
and
landfill
biotreat
thermal treatment
soil wash
Groundwater
– Pump & treat
Environmental Simulations International
Adequate
definition of
area to be
removed?
Excavate & landfill
“Dig and dump”
– Historically the “default
option” for soils
– Future constraints
Legislative
Cost
Total environmental impact
– emissions, truck movements, etc.
Environmental Simulations International
Excavate & biotreat
Hydrocarbon degradation in oxygenated
treatment systems
– Windrows, biopiles, etc.
Well-established
Some common questions
–
–
–
–
–
Contaminant availability/residuals
Speed of treatment
Volatilisation
Leachate control
Indigenous or added microorganisms?
Environmental Simulations International
How biodegradable are
petroleum hydrocarbons?
“Rapid”
“Moderate”
“Slow”
BTEX
Highly substituted
monoaromatics
Asphaltenes
Naphthalenes
n-alkanes <C20
n-alkanes C20 –
C40
Branched alkanes
3-4 ring PAH’s
Environmental Simulations International
alkanes >C40
cycloalkanes
>4 ring PAH’s
Ex situ biotreatment
Environmental Simulations International
Excavate & thermal
treatment
Hydrocarbons, etc. desorbed from soil at
elevated temperatures
– e.g., rotary kiln
Off-gas treatment
– e.g., catalytic or thermal oxidiser
Straightforward technology but rarely used
Some common questions
–
–
–
–
Emissions control
Fuel use
Economics
Properties of treated soil
Environmental Simulations International
Excavate & soil wash
Hydrocarbon removal from soil by
water/agitation; treatment of process streams
Often pushed as method for PAH remediation
Some common questions
–
–
–
–
Process engineering (blockage, attrition, etc.)
Slurry handling
Water treatment
Economics
Environmental Simulations International
Pump and treat
Break pathway by abstraction of
groundwater; treat groundwater
– Really a containment technology
Some common questions
– How long to pump for?
– Pump water and/or NAPL?
– Water treatment technology
Hydrocarbons and other components
– Treated water discharge
– Long-term costs
Environmental Simulations International
In situ remediation
Barrier and PRB technologies
SVE and related technologies
Bioremediation
Environmental Simulations International
Barrier techniques
Variants
– Capping
– Cut-off walls (barriers)
– Solidification
Well-proven
– But solidification a questionable option for
hydrocarbons
Some common questions
– Long-term performance
– Ensuring integrity
Environmental Simulations International
Permeable reactive
barriers (PRB’s)
Reactive zones installed across the
groundwater plume to enhance
contaminant removal or degradation
For hydrocarbons, this is mostly likely to
involve enhancements of in situ
bioremediation
– We will consider this in a few slides time
Environmental Simulations International
SVE and variants
Removal of volatile components by moving air
through
– Soil (SVE; high vacuum extraction (HVE))
– Groundwater (In situ air sparging (IAS))
Can be combined with removal of
contaminated groundwater and/or NAPL
– Slurping (multiphase extraction)
Can be combined with enhanced
biodegradation
– Bioventing, bioslurping…
Environmental Simulations International
SVE and variants
Environmental Simulations International
SVE and variants
Well-established
Some common questions
–
–
–
–
Subsurface permeability
Subsurface heterogeneity
Effectiveness for MTBE
Emissions treatment
Thermal oxidisers
Activated carbon
Biofilters
– Groundwater management
Environmental Simulations International
In situ bioremediation
Contaminant degradation by stimulating
biological activity in the subsurface
– Note: hydrocarbon degradation is most effective in
the presence of oxygen
Many variants on basic process configuration
Some common questions
–
–
–
–
–
Can you supply enough oxygen?
Inhibitory effects?
Distribution of additives
Biofouling problems
Speed
Environmental Simulations International
“In situ bioreactor”
Environmental Simulations International
Biological PRB using ORC
Environmental Simulations International
In situ flushing
Addition of solvent or surfactant to
subsurface to enhance solubility of NAPL for
recovery by pumping
Much talked about, little used for remediation
Some common questions
–
–
–
–
Getting the additives to the right place
Getting the additives back
Effects of additives on soil structure
Economics
Environmental Simulations International
Monitored natural
attenuation (MNA)
Natural attenuation
– The effect of combined naturally occurring
physical, chemical and biological processes to
reduce the risk posed by polluting substances in
groundwater to the identified receptors.
Monitored natural attenuation
– Monitoring of groundwater to confirm that NA
processes are acting at a sufficient rate to protect
receptors and that remedial objectives will be
achieved within a reasonable timescale
Environmental Simulations International
MNA
Widely used in US and elsewhere
UK guidance (R&D P95)
Some common questions
– Duration appropriate?
– Long-term cost-benefit?
– Monitoring requirements
– Ensuring continuity
– Contingency requirements
Environmental Simulations International
UK MNA case summary
UK oil distribution terminal
– Gasoline additive release early-1970’s
– NA monitored since April 1994
– Risk-based approach
Sandy aquifer
– Potential minor aquifer
– Dissolved plume 9-14 m b.g.s.
– Velocity 15-50 m/year
Environmental Simulations International
Hydrocarbon MNA site
Environmental Simulations International
UK MNA case summary
Primary line of evidence: mass removal
by biodegradation
– Plume: front stationary and area reducing
– Benzene concentrations decreasing
Rates vary within plume
Inversely proportional to concentration?
Seasonal effects
Rate at plume front = 0.2%/day
Environmental Simulations International
NA data for benzene
Environmental Simulations International
UK MNA case summary
Secondary evidence: geochemical
– O2, NO3- and SO42- depletion with
increasing BTEX
– Stoichiometrically, available SO42- could
account for 43 mg benzene/litre: sufficient
Tertiary evidence: microbiological
– High microbial numbers, including large
sulphate-reducing population
Environmental Simulations International
Technologies for NAPL
remediation?
Limited “source” excavation
– Access permitting!
NAPL pumping
SVE/HVE/bioventing
Depending
Sparging/biosparging/slurping on
Ex situ bioremediation
components
…… or deal with the pathway(s)
– Pump & treat, trench, etc.
Environmental Simulations International
Pumping NAPL
Works best for light products/recent releases,
significant thicknesses and coarse formations
NAPL becomes trapped below the water
table if pumping stops
NAPL will not flow after it reaches residual
saturation
Many case studies have shown that most of
the NAPL remains in place due to trapping
Oil/water separation is difficult if product
becomes emulsified during pumping
Environmental Simulations International
Technologies for MTBE
remediation
Unsaturated soil
Excavation and
disposal
SVE and variants
Groundwater
Pump & treat
– Difficult to treat water
– Limited efficiency due
to partitioning
behaviour
Bioremediation
– Not straightforward
Sparging & variants
– Limited efficiency due
to partitioning
behaviour
Bioremediation
– Not straightforward
Environmental Simulations International
Monitoring & verification
Objectives may include:
1. Confirmation of risk
assessment findings
2. Confirmation of
remediation performance
3. Determination of when
remediation can cease
4. Indication of the need for
corrective action
Environmental Simulations International
Soil sampling
Basic guidance in CLR7
– Mean and maximum value tests to
determine compliance with target
concentrations
– Useful for relatively straightforward sites
but does not consider spatial distribution of
contamination
Geostatistics
– Specialist advice…
Environmental Simulations International
Groundwater monitoring
Where?
– Appropriate to site layout and remediation process
– Upgradient/downgradient
– Compliance points/sentinel wells
What?
– Contaminants posing significant risk
– Process indicators/geochemical parameters?
When?
– Depends on the site and the process
Establish performance baseline
Establish seasonality
– Can always reduce frequency once the situation is
understood
Environmental Simulations International
Monitoring NAPL thickness
1.6
Why is the thickness changing?
1.4
• Groundwater fluctuations (smearing)?
• Product trapping?
• Weathering?
• Remediation?
• A combination of the above?
FPH thickness (m)
1.2
1
0.8
0.6
0.4
0.2
0
Oct-95
May-96
Dec-96
Jun-97
Jan-98
Jul-98
Feb-99
Date
Figure 4. Changes in FPH thickness in MW 42 at the NIA site
Environmental Simulations International
Aug-99
Mar-00
Conclusions
There are diverse remediation options for
petroleum hydrocarbons
Important drivers
–
–
–
–
Risk management
Fitness-for-purpose
Cost-benefit
Duration
Ask the right questions! (And beware the
sales pitch).
Appropriate verification/monitoring
– Duration?
Environmental Simulations International
Conclusions
A combination of techniques is often the appropriate option
Environmental Simulations International