Introduction on GMES and its services

Download Report

Transcript Introduction on GMES and its services

Copernicus services and User Forum

Finnish GMES User Forum Helsinki 9.1.2013

Mikko Strahlendorff

Policy Makers USERS & Public & Private, Commercial

Overall view

What is their need?

Farming Oil Spill Tracking Air Quality Land Marine Atmosphere Flood Emergency Surveillance Arctic change Examples of Services Provided Information Services Security Climate Sustainable observation Space Infrastructure & In Situ Infrastructure OBSERVATION

Services as main goal

Core services – EU/public supported

• Provide standardized common (multi-purpose) information for Europe; using economies of scale • • Requested by the EU: link with European information needs ‘public good’ data policy: open access and free licensing

Downstream services - Commercial/national

• Tailored for specific applications at local, regional, national levels (public good or private use) • EU encourages and supports the implementation of these service layer (R&D)

Monitoring of Earth systems

Land Marine Atmosphere

Horizontal applications

GMES Services

Security Emergency Climate Change

Observational infrastructures

In-situ observation infrastructure:

air-, sea- and ground-based systems and instruments

• (e.g. airborne, balloons, floats, ship-borne, measuring stations, seismographs, etc)

Space infrastructure component for GMES: different missions co ordinated at European level

• Dedicated GMES missions: ESA Sentinels • Contributing missions: EU National, EUMETSAT and third parties

GMES Space component

• • • • • • Sentinel 1 – SAR imaging  All weather, day/night applications, interferometry; for vessel detection, oil spills etc.

 First launch 2013 Sentinel 2 – Multispectral imaging   for land applications, e.g. urban, forest, agriculture, etc. First launch 2013 Sentinel 3 – Ocean & Land monitoring  Wide-swath ocean color, vegetation, sea/land surface temperature, ocean altimetry  First launch 2013 Sentinel 4 – Geostationary atmospheric  Atmospheric composition monitoring, transboundary pollution  First launch 2017 on EUMETSAT MTG-S Sentinel 5 – Low-orbit atmospheric  Atmospheric composition monitoring  Precursor launch 2013, S5 first 2020 on EUM Post-EPS JasonCS – Ocean reference altimetry

User Forum and requirements

• GMES should be user driven • How is this working now? User Forum fills the flaw?

User Forum Provides requirements to EC Suomen User Forum UK, Ranska ...

GMES service providers Made user requirements themselves from now on EC requirements ESA gathers from services EEA gathers from services Satelite requirements In situ requirements • EC runs thematic workshops for each domain • User Forum has 2-3 domains on 1 meetings agenda

8

Emergency management GIO-EMS in rush mode

• • • • • • 21 activations in the period April 1, 2012 – now; 60% of activations, 78% of map products in Europe; In Europe: 7 forest fires, 2 earthquakes, 3 “other” events; Activations by AU in HU, IT (2), BG (2), ES (3), SE, PT, RO, DE, FR; Outside Europe: primarily floods, triggered by European AU and ASCU, and WFP, 3 in coordination with Int. Charter “Space and Major Disasters”; Close to expected trend for first 8 months.

• • • • •

EMS Performance parameters

Target for End Users: • • Reference map 6 hours Delineation and Grading 24 hours after activation request.

Average timing achieved for products needing new satellite acquisition: • • • • 3 hours for activation start up 34 hours for satellite tasking and acquisition 8 hours for satellite reception and validation 17 hours for delivery of first post-event product Average delivery time after activation request: 2.5 days; Only few cases meet the End User target, typically when satellite imagery is in archive, or planned for monitoring extensions.

Major bottleneck is still the satellite latency

Duration of activation phases

70 60 50 40 30 20 10 0 Map production and delivery Satellite reception and validation Satellite tasking & acquisition Request Handling

Land service

GMES land monitoring service: Pan-European Component Providing land cover and land cover change information at Pan European scale (CORINE) Production of 5 thematic high resolution layers Dissemination + archiving + cataloguing Follow up of FP 7 GEOLAND – Euroland Sub-Delegated tasks to the EEA GMES WP 2011 – 2012 – 2013 / Budget 22 Mi Euro H. Dufourmont, EEA

Land service

Contract type : Framework contract for HRLs production + MS Grants for validation and CLC 2012 Date : November 2011 6 LOTS divided per geographic regions and thematic layers Contractors : Metria (Se), Geo Ville (Au), VTT (Fi), GAF AG (De), SIRS (Fr), Planetek (It), Planatek (Gr), Indra (Sp), Eurosense (Be), Rapid Eye (De) H. Dufourmont, EEA

Land service

Implementation of GIO land services Pan EU Component on track except for: • • Work going on regarding the participation of Candidate & potential Candidate Countries.

Minor delay in production of High Resolution Layers, following the necessity of an additional streamlining phase and the problems with availability of input imagery.

Mitigation measures: • • Major mitigation measures had to be taken in the framework of the ESA GMES DWH Coordination and flexibility amongst stakeholders is of key importance to keep the planning H. Dufourmont, EEA

Land service

GMES land monitoring service: Global Land Component Providing Biophysical Parameters (13) on near real time, on a ten-daily frequency and with a world coverage Quality Control and User feedback analysis Dissemination + archiving + cataloguing Follow up of FP 7 GEOLAND – Biopar Cross-Delegated tasks to the EU DG JRC WP 2012 – 2013 / Budget 4 MEuro

LAI VGT

Contractors: VITO (Be), HYGEOS (Fr), Meteo France (Fr), ZAMG (Au), IPMA (Pt), EOLAB (Sp), INRA (Fr), Tu Wien (Au), UCL (Be), Univ. Leicester (Uk), Univ. Lisbon (Pt) E. Bartholome, DG JRC

Atmosphere service

Objective

GMES regulation: … air quality, atmospheric chemistry and composition … essential element for climate change monitoring and the future provision of ECVs … … on a regular basis and at regional and global levels… NRT analysis and forecast, reanalysis of past years

Air Quality for Europe

• O3, NO, NO2, CO, SO2, PM10, PM2.5

Global Atmospheric composition

• Greenhouse gases, reactive gases, • aerosol, stratospheric O3 •

Climate Forcing

• CO2, CH4, monitoring and reanalysis of fluxes •

Solar Energy, UV

• Ozone records, ultraviolet radiation

Atmosphere service

Current implementation of pilot service

Outside GIO as FP7 research project MACC-II

FP7-SPACE-2011: Prototype operational continuity of GMES services in the Atmosphere area

36 participants from 13 different countries

27,7 M € total cost (19 M€ EC contribution)

From November 2011 to July 2014

Coordinator: ECMWF (international organization) www.gmes-atmosphere.eu

Atmosphere service

Follow-up … from GMES User Forum consultation Event

ENV/EEA ENV/MACC-II

outcome

Assess feasibility [ETC/ACM]: to use MACC data for concentration maps (population exposure) Assess feasibility: early delivery of re-analysis based on un-validated data (AQ in-situ) EEA/MACC-II MACC-II/national user Information on OGC-compatible service interfaces Information meeting with AEA for DEFRA (UK) MS input to User Uptake Re-analysis of 2011 pollution events REA/ENTR/projects meeting Air Quality service chain (e.g. MACC PASODOBLE-obsAIRve) MACC-II/DWD Clarification of UV radiation service scope

Atmosphere service

Main building blocks Global system  ECMWF Integrated Forecasting System   (IFS), coupled to global chemical transport model (CTM) assimilates weather

in situ

data and ~50

satellite

sources, and composition data from ~10 satellite sources extensive use of

in situ

composition data for validation Regional system  Ensemble of seven nationally developed CTMs, European domain   driven by data from Global system assimilates

in-situ

air-quality data and

satellite

data

Marine environmental service

Objective: To provide information on the state of physical ocean and marine ecosystems for the global ocean and the European regional areas. Monitoring and forecast plus reanalysis of past years on

• • • • • • • Currents Temperature Salinity Sea ice Sea level Surface winds Biogeochemistry

Current implementation of a pilot service

Implementation: Outside GIO as FP7 research project MyOcean 2

• • • • • FP7-SPACE-2011: Prototype Operational Continuity for the GMES Ocean Monitoring and Forecasting Service 59 participants from 28 different countries 41,2 M€ total cost (28 M€ EC contribution) From April 2012 to September 2014 Coordinator: Mercator Océan http://www.myocean.eu.org

Follow up

Marine environmental service

… from GMES User Forum consultation Event

DG MARE consul tation, June 2012 EEA / DG ENV consultation on MSFD needs EuroGOOS / national authorities event, Oct. 2012 MyOcean-2 catalogue MyOcean-2 Science Days, Nov. 2012

outcome

Green paper on “ Marine Knowledge 2020 ” mapping to oceanographic forecasting from seabed Use and evolution of GMES marine service for Marine strategy framework Directive needs (Good Environmental State – GES) Nicosia declaration for the future European Ocean Monitoring Service; enabling economies of scale and avoiding duplication between the European and national levels New release of MyOcean-2 catalogue (version 2.2) published Scientific conference on data, modelling, data assimilation, validation, user requirements and downstream applications

Marine environmental service

Main building blocks

• •

Thematic Assembly Centres Marine Forecasting Centres

• •

Preparing the opera tional service starting September 2014 Negotiations on governance model for marine service

Climate change service

EU Regulation (911/2010) specifies that “ access to information for climate change monitoring in support of mitigation and adaptation policies ” shall be included in the GMES service component.

A Climate Change service must meet the Global Climate Observing System goals:

 Monitor the climate system  Detect and attribute climate change  Assess impacts of, and support climate variability & change adaptation to,

Climate change service

 consultation process: expert group (2010-2011), ‘ Helsinki GMES climate ’ conference (Jul 2011), GMES user forum (Nov 2011).

 6 th FP7 space call (closed since 21 Nov. 2012) EC funding: 26 M €  re-analysis (global and EU regional)  quality assurance for ECVs  climate indicator toolbox  Attribution products  data access

Climate change building blocks

FP7 work programme 2010 MACC-II MyOCEAN-II GeoLAND-2 MONARCH-A CARBONES EURO4M ERA-CLIM (Nov 2011-July 2014) (April 2012 – September 2014) (September 2008 – December 2012) (March 2010 – February 2013) (April 2010 – March 2013) (April 2010 – March 2014) (January 2011 – December 2013) FP7 work programme 2011 CORE-CLIMAX CHARMe (30 months) (24 months)

from European commission e.g.,FP7 Space call

Climate change service

from other bodies e.g., ESA, Eumetsat, EEA, WMO..

Harmonization/Coordination & QA platform Climate Indicator Data Store Customization platform Sectorial Information System Climate-ADAPT platform Selected information for customer DGs MS & other customers

SECURITY APPLICATIONS

Preparatory Workshop GMES Security – Jun 2012 • • • To inform Member States on GMES Security Activities and to seek advise on the way ahead Framing document distributed prior to the meeting Series of presentations in 3 sessions (available in CIRCA): • • •

Border Surveillance Support to External Action Maritime Surveillance

• • • Detailed discussion in the Working-Groups (BS and SEA) About 55 participants / Debate Conclusions presented to the User Forum Oct 2012 27

Security applications

GMES support to EUROSUR (BS) GMES BS WG: COM (ENTR, HOME, JRC), Frontex, EUSC, EMSA, EDA, ESA, MS Experts Concept for EUROSUR, V1.0 of 3.12.2009

Concept of Operations for EUROSUR (CONOPS), V2.3 of 29.6.2011 FP7 call 2012 : LOBOS and SAGRES starting Jan 2013 Main stakeholders: FRONTEX, EMSA, EUSC (with Industry)

GMES Support to EU External Actions (SEA) GMES SEA WG: SGC, RELEX, DEVCO, ECHO, ENER, JRC, ESA, EDA, EUSC, MS Experts Since 2011: EEAS

2010: Identification of User Scenarios 2011: Involvement of EEAS (via CMPD) 2012: (late/early 2013) WG recommendations 2013 (Jan): kick-off of 2 FP7 follow-on projects: 2014 (mid): Detailed operational specifications G-NEXT and G-SEXTANT 28

Security applications

Maritime Surveillance

• • • • • Mapping of Maritime Surveillance Activities: • • • • FP7: FP7 : ESA: EDA:

DOLHIN, NEREIDS, SIMITISYS, PTMAR MARISS

;

MARSUR

; EMSA: Operations and R&D • Coordination by Maritime Projects Coordination Board (PCB) What else could be done in the area of Maritime Surveillance?

• (e.g. anti-piracy/smuggling, fisheries control, monitoring illegal waste dumping) Holistic approach needed to improve cost/benefit ratio Governance issues at stake • different geometries across Member States • • • fragmentation of user communities; Europe is still working on an integrated Maritime Strategy • Identification of requirements through CISE; EDA to revitalise Identification of requirements for the Defence (UK) 29

FP7 GMES Security Projects timeline

FP7 GMES SECURITY projects

Call 2007

GMOSAIC DOLPHIN

Call 2010

NEREIDS SIMTISYS Call 2011 BRIDGES SAGRES

Call 2012

LOBOS G-NEXT G-SEXTANT

2009 2009 2010 2010 2011 2011 2012 2012 2013 2013 2014 2015 OPERATIONS 2014 30 2015

Possible implementation/coordination

Services

Atmosphere Marine Land Climate Security Emergency

Operators

ECMWF EEA EEA ECMWF FRONTEX ECHO/JRC

Means

Delegation agreement Delegation agreement Delegation agreement Delegation agreement Delegation agreement Administrative Arrangement 31

Next steps on Copernicus

• • • • • •

Decision on the budget (in/out MFF + amount) If out MFF, intergovern. agreement New Regulation proposed by EC Debates + adoption by EP and Council (co decision) Delegation Agreements to be concluded (and procurement) Start of the operations

32