CAMP LAYOUT
• The camp will have only ONE entry control
point.
• There will be a turn-around area inside the
camp.
– It will be part of the camp road near entry
control point.
COC
• Combat Operations Center (COC) and
Communications.
– Erected at the same time.
• COC
– CO is in charge of the COC.
– Protective wire around the COC is 35 meters
out.
– Symbol for protective wire is:
• X---X---X---X
Communications
• Comm
– Battalion main radio is at the antenna site
(ANT FARM).
– The maximum distance to the ANT FARM is
2 miles.
• Without comm the NMCB can not talk to
each other or the higher chain of command.
Company Command
Post
• Company Command Post (CP) and Alternate COC
(ACOC).
– Erected at the same time.
• B Co
– Responsible for camp maintenance and camp
security.
Company Command
Post
• ACOC
– XO is in charge.
– ACOC is usually the A Co. CP.
– The boards get updated by watch personnel at
the end of each COC watch.
– ACOC is maximum of 10 minutes from COC.
– Protective wire around ACOC is 35 meters out.
ECP & ASP
• Rear Security Entry Control Point (ECP)
– Has a M2HB.50cal.
• Ammo Supply Point (ASP)
– Minimum distance of 350 meters from berthing
and other compounds.
– Maximum distance of 2 miles from COC.
– Protective wire around ASP is 35 meters out.
LZ & BAS
• Landing Zone (LZ)
– 400 meters from front line.
– LZ has (3) landing areas and each landing area
has (4) landing points.
• Base Aid Station (BAS)
– 400 meters from front line.
– Within close proximity of LZ.
• LZ & BAS will go up at the same time.
Armory & EPW
• Armory
– No closer then 400 meters to front line.
– Protective wire around armory is 35 meters out.
• EPW
– Protective wire around EPW is 35 meters out.
– Near the ECP but not in sight of the ECP.
M224 & GALLEY
• M224 60MM Mortars
– 6 in Battalion TOA. They are all placed in the
same location, approximately 35 meters apart.
• Galley, Showers and Laundry
– Located close to one another so they can share
one leech field.
– A grease trap will separate the galley and the
leech field.
Supply & A Co.
• CTR, CSR, MLO & Supply
– Will be located near A Co. yard.
• A Co. yard will be located near the ECP.
• Bulk Fuel
– Located within the A Co. yard.
Latrines & Garbage
Pits
• Latrines
– Will be a minimum of 100 yards from the
galley and water sources.
– 50 feet downwind of berthing.
• Garbage Pits
– Not less than 100 yards from water sources.
– 35 yards from the galley.
Tents & Generators
• Berthing Tents
– At least 200 meters behind the front lines.
– 35 meters apart.
• Generators
– Will have pits and covers to reduce noise and
protect from weather.
– Located in a central area.