Cascadia Subduction Zone (CSZ)
Catastrophic Earthquake and Tsunami
Functional Exercise 2016
Concept briefing for a proposed comprehensive, coastal-centric, catastrophic
earthquake and tsunami EOC functional exercise in 2016
WSEMA – September 17, 2013
Terry Egan
Unit Manager
Plans, Exercises, Training
WA Emergency Mgt Division
[email protected]
Patrick Massey
Federal Preparedness Coordinator
Director, National Preparedness Division
FEMA Region 10
[email protected]
1
V3
CSZ Exercise 2016
The CSZ 2016 Exercise is a
progressive exercise series
commencing in early 2014 with
building block training and exercise
ramp-up events culminating in a
comprehensive four day EOC-toEOC functional exercise in the
Spring 2016.
Focus on coastal jurisdictions and tribes
along with select I-5 corridor and Eastern
WA jurisdictions.
Map : Cascadia Subduction Zone Fault Line
2
CSZ Exercise 2016
Scenario Overview
Magnitude 9.0 earthquake.
Direct impacts to States of Oregon and
Washington.
Complete rupture of the 800-mile fault line.
Impacts affecting over 140,000 square
miles.
Severe ground shaking lasting up to 5
minutes.
20’ to 80’ tsunami impacting the entire
coastline within 15-30 minutes.
Numerous aftershocks with several of
M7.0+.
Washington
Oregon
California
Crescent City
Simulation of a M9.0 CSZ earthquake. Graphic
provided by Pacific Northwest Seismic Network
3
CSZ Exercise 2016
CSZ Earthquake/Tsunami Impacts
15,000 deaths; tens-of-thousands injured
throughout three coastal states.
3 million households impacted.
800,000 requiring shelter.
Extreme transportation impacts to I-5
corridor west to coastline. Coastal
communities isolated.
Major extended disruptions to critical
infrastructure lifelines (electricity, refined
fuels, water supply, etc.)
Tremendous need for critical life-saving and
life-sustaining resources – extensive mutual
aid needed.
Map : Highway Road Segments in the Cascadia Region with
Expected Damages ranging from Slight to Complete under the
90th-Percentile Case Scenario.
4
CSZ Exercise 2016
Strategic Goals:
Enhance Joint Operations – Success in managing the consequences of a
wide-area catastrophic disaster hinges on how well local, state, tribal, and
federal actions and the whole community are integrated and synchronized.
The desire is for all exercise players at all levels to gain an appreciation of
the sheer necessity of joint unified action.
Instill an operational mindset shift to ‘catastrophic’ – Our elasticity and
ability to stretch to handle the impacts of a catastrophic disaster is a
daunting challenge. We need to plan and exercise for the worse.
Planning Springboard – The lessons learned in the CSZ 2016 Exercise will be
used to develop and/or update CSZ and related catastrophic disaster
response plans at all levels and to inform future exercise design.
5
CSZ Exercise 2016
Exercise Mission Statement:
Collaboratively plan, design, and conduct a comprehensive
functional exercise that tests local, state, tribal, and federal
catastrophic earthquake plans to improve our joint-interagency
and whole community ability to effectively respond to a widearea, catastrophic earthquake and tsunami caused by a rupture
of the Cascadia Subduction Zone (CSZ) fault along the Northwest
coast of the United States.
Draft-proposed
6
CSZ Exercise 2016
Exercise Participants (Anticipated)
WA Coastal counties, cities, and
tribes
Select WA I-5 Corridor and East-ofthe-Cascades Counties (TBD)
WA EMD
WA state agency ESFs
Department of Defense
NORTHCOM, NRNW, NGB, etc.
Nongovernmental Organizations
(VOAD)
Major private sector partners
Supporting States (AK and ID)
Private and public critical
infrastructure lifeline providers
FEMA Region X and federal agency
ESFs
International partners (e.g. British
Columbia)
FEMA National Response
Coordination Center (NRCC)
Public (e.g., Tsunami Evacuation
Drills - TBD)
7
CSZ Exercise 2016
The CSZ 2016 Functional Exercise will test EOC-to-EOC ability to perform tasks
and objectives (TBD) associated with all Response Core Capabilities:
Critical Transportation
Operational Communications
Environmental Response / Health
and Safety
Operational Coordination
Fatality Management
Infrastructure Systems
Mass Care Services
Planning
Public Health and Medical Services
Public Information and Warning
Mass Search and Rescue Operations
Public and Private Services and
Resources
On-Scene Security and Protection
Situational Assessment
8
CSZ Exercise 2016
Exercise Planning Timeline
Socialize
Concept
2013
Scenario
Document
Extent of
Play
Agreements
2014
Exercise
Series ‘Kick
Off’ Meeting
Concept
and
Objectives
Meeting
EXPLAN
‘Ground Truth’
Document
2015
Initial
Planning
Meeting
Mid-Term
Planning
Meeting
C&E
CSZ 2016
EEGs Training Exercise
2016
MSEL
Synchronization
Meetings
2017
Final
Planning
Meeting
After Action
Report
Published
Please note: A number of ramp-up events to include training courses, seminars, workshops,
tabletops (all TBD) will be conducted prior to the culminating functional exercise.
9
CSZ Exercise 2016
Why an Exercise in 2016?
Culminating point to many recent CSZ and catastrophic earthquake planning
efforts at the local, state, tribal, and federal level.
Allows adequate time to update plans, policies and procedures; also allows
time to build and design a complex exercise with many participants.
Implement a building block approach to train and exercise staffs on EOCspecific plans and procedures and joint-operations.
Significant amount of ‘areas for improvement’ identified in previous local and
larger exercises (e.g., Evergreen Quake Exercise Series).
10
CSZ Exercise 2016
Exercise Parameters – the concept as it stands now:
A four-day response functional exercise (FE).
Focus on WA coastal communities with select communities along I-5 corridor
and Eastern WA.
EOCs at all levels playing and activated to highest level – city, county, state,
tribes, feds, private sector.
All field-play simulated (with possibility of some actual field elements TBD) via
Injects-MSEL distributed via Control/Simulation cell.
Date: late May or early June 2016 (exact days TBD).
Goal of 24-hour play. Options of 12-hour or 8-hour play each day (TBD).
Local level of participation each day is objectives driven.
Plenty of TBD based on partner input
11
CSZ Exercise 2016
Considerations
The following are some of the major issues that will need to be
determined in designing the CSZ 2016 Functional Exercise:
Include components of Continuity of Operations into the exercise?
Duration of EOC play each day (24hrs, 12hrs, 8hrs)?
Telecommunications outage play during the exercise or in a separate drill?
Exercise length > 4 days?
Type of ramp-up events (trainings, seminars, etc.)?
Jurisdictions not playing in the exercise will be highly
encouraged to serve on the Exercise Design Team and
to assist neighboring communities that are playing
12
CSZ Exercise 2016
The Risk:
Need to recognize funding
and staff limitations and
other constraints in the
design and conduct of this
exercise and associated
events.
13
CSZ Exercise 2016
The path forward over next several months:
Socialize concept to local, state, tribal, federal, and other
partners.
Gather comments from exercise participants.
Conduct “Kick-off” meeting in January/February 2014.
Brief and discuss the exercise concept with whole community
Discuss the exercise planning/design governance structure
Solicit candidates to serve as exercise design team leaders
Discuss Extent-of-Play Agreement (XPA) parameters
Solicit and then vote on the exercise name and logo
14
CSZ Exercise 2016
For More Information Contact:
WA EMD
Name: Brittany Ginn
Position: State Exercise Program Manager
Email: [email protected]
FEMA Region 10
Name: Stephen Simerly
Position: Regional Exercise Officer
Email: [email protected]
15