st kenneths primary school - Primary Schools Modernisation

Download Report

Transcript st kenneths primary school - Primary Schools Modernisation

SLC PHASE 2
ST KENNETHS PRIMARY SCHOOL
PARENT COUNCIL MEETING
respect
integrity
innovation
collaboration
excellence
ALISDAIR ELLIOT – CONSTRUCTION MANAGER
1
ST KENNETHS PRIMARY SCHOOL
PARENT COUNCIL MEETING
SECTION 1
1.0
Introduction and Agenda
2.0
3.0
4.0
5.0
Close
Project Overview & Images
BLL Project Team & Logistics
Current Progress & Phase 2 / 3 Transition
Q&A
2
ST KENNETHS PRIMARY SCHOOL
SECTION 2
2.0
The Project
2.1
2.2
Project Overview
Images
3
ST KENNETHS PRIMARY SCHOOL
2.1 Project Overview
The project:
This project is our fourth new-build primary school building to be constructed within Phase 2 Tranche 1 of the South Lanarkshire
Primary Schools Modernisation Programme.
The Client:
South Lanarkshire Council
The Contract: PPC 2000 (Partnering framework contract agreement)
Overview:
The project comprises the tandem build construction of a new two-storey 16 classroom primary school. In addition to the classrooms,
the building comprises private and main stream nurseries, a double gym hall, general purpose room, library and IT Suite. The new building is located
within the existing school campus, formerly the location of the existing sport pitch and car park. The works are being carried out in two phases to allow
the existing school to operate whilst the new building is under construction. On completion of the new school building the users will decant from
existing to new allowing progression into phase 2 where the scope is to remove asbestos from the existing school, demolish the building, complete the
sports pitch and finish the hard and soft landscaping.
Construction: The construction of the primary school is a steel frame structure with holorib decking
topped with a concrete floor slab on pads/strip foundations. The building will have predominantly a
facing brick outer leaf with areas of metal cladding and curtain walling on the elevations. The roof will be
an aluminium standing seam roof throughout.
Internally, underfloor heating has been incorporated throughout the building with fit out specification
aligning with other projects in the programme.
Externally, the scheme includes external hard and soft landscaping and lighting design scheme
complete with a standard 60 x 40 metre sports pitch, car parking / pupil drop off with playground & soft
play areas around the school/nursery.
Building:
ST KENNETHS
PRIMARY
SCHOOL
GIFA
3569 m²
4
ST KENNETHS PRIMARY SCHOOL
2.2 Images
5
ST KENNETHS PRIMARY SCHOOL
3.0 PROJECT TEAM / SITE LOGISTICS
SECTION 3
3.0
Project Team & Site Logistics
3.1
3.2
3.3
BLL Design Team
BLL Construction Team
Site Logistics
6
ST KENNETHS PRIMARY SCHOOL
3.1 BLL Design Team
Architect
Cost Consultant
Structural Engineer
Services Engineer
This is the design team engaged upon the St Kenneth’s Primary School Project
7
DELIVERY TEAM
DESIGN TEAM
CORE TEAM
ST KENNETHS PRIMARY SCHOOL
3.2 BLL Construction Team
GORDON ANDERSON
Regional Director
ED PARRY
Commercial Director
ANDY STRONACH
Framework Manager
TRACEY-LEIGH FINDLAY
Framework Commercial Manager
BARRY O’HAGAN
Framework Delivery Manager
TOM CAIRNEY
Framework
Safety Manager
Alisdair Elliot
Construction
Site Manager
OMAR AHMED WAZIR
Planning Manager
Michael McMullan
Construction
Manager (Part)
TBC
Finishes Construction
Manager (Part)
EMMA ROBB
Commercial Manager
8
ST KENNETHS PRIMARY SCHOOL
3.3 Site Logistics – Overall Phasing Diagram
9
ST KENNETHS PRIMARY SCHOOL
3.3 Site Logistics – Phase 1 Logistics
10
ST KENNETHS PRIMARY SCHOOL
3.3 Site Logistics – Phase 2 Logistics
11
ST KENNETHS PRIMARY SCHOOL
3.3 Site Logistics – Phase 3 Logistics
12
ST KENNETHS PRIMARY SCHOOL
3.0 PROJECT TEAM / SITE LOGISTICS
SECTION 4
4.0
Programme
4.1
4.2
Current Progress
Phase 2 / 3 Transition
13
ST KENNETHS PRIMARY SCHOOL
4.1 Current Progress
PROGRESS
Bovis Lend Lease are currently reporting works on programme with all works due for completion 23/07/10
Works on site at present comprise the following:
External Works
•External Brickwork
•Curtain Walling Windows and Doors
•External Cladding
14
ST KENNETHS PRIMARY SCHOOL
4.1 Current Progress
Internal Works
•Interior Fit Out (Joinerwork, floor finishes, suspended ceilings)
•
•Mechanical & Electrical Installation
•Architectural Metalwork
•Decoration
•Gym Fit Out
15
ST KENNETHS PRIMARY SCHOOL
4.2 Phase 2 / 3 Transition
Bovis Lend Lease are scheduled to take possession of the Phase 3 site on the 30 July 2010 and commence preparation works for demolition of the existing
school.
Demolition of the existing school is scheduled to be completed during
November 2010. Following which BLL will install synthetic sports pitch and
carry out further hard and soft landscaping works
BLL are scheduled to complete all Phase 3 works during January 2011
BLL are intending to use the existing delivery entrance of East Mains Road
to service the Phase 3 works
16
ST KENNETHS PRIMARY SCHOOL
PARENT COUNCIL MEETING
SECTION 5
5.0
Q&A
Close
17