MTA New York City Transit - The New York Building Congress

Download Report

Transcript MTA New York City Transit - The New York Building Congress

New York Building Congress
November 13, 2014
Frederick E. Smith, P.E.
Senior Vice President and Chief Engineer, CPM
NYCT Capital Program
2010-2014 Program
Rolling Stock
(Rail & Bus Fleets)
21%
Signals &
Communication
24%
$11.6B
Track
$1.4
Infrastructure
& Facilities
11%
Track
13%
Stations
18%
Other
9%
NYCT Capital Program
Proposed Program 2015-2019
Signals &
Communication
20%
Rolling Stock
(Rail & Bus Fleets)
18%
$17.1B
Track
Track
$1.413%
Infrastructure
& Facilities
18%
Stations
19%
Other
8%
NYCT Capital Program
2010-2014 Program
Signals &
Communication
24%
Rolling Stock
(Rail & Bus Fleets)
21%
$11.6B
Signals &
Communication
20%
Track
$1.4
Infrastructure
& Facilities
11%
Stations
18%
Proposed Program 2015-2019
Track
13%
Other
9%
Infrastructure
& Facilities
18%
Rolling Stock
(Rail & Bus Fleets)
18%
$17.1B
Stations
19%
Track
$1.4
Track
13%
Other
8%
3
Projected Capital Program Work
2015-2019
Carry over
2015-2019
Sandy
Program Areas
•
•
•
•
•
Recovery & Resiliency
Signals & Systems
Infrastructure and Facilities
Station Rehabilitation
Systems & Security
Infrastructure & Facilities
Sandy Recovery & Resiliency
Sandy: Addressing the Tunnels
1. Greenpoint Tube
Brooklyn Crosstown G Line – Awarded 2013 - COMPLETED
2. Montague Tube
Broadway R Line – Awarded 2013 - COMPLETED
3. Steinway Tube
Flushing 7 Line – Awarded 2013
4. Cranberry Tube
Fulton A/C Line – Award 2014
5. 53rd Street Tube
Queens M/E Line – Award 2014
6. Joralemon Tube
Lexington 4/5 Line – Award 2015
7. Canarsie Tube
14th Street L Line – Award 2016
8. Rutgers Tube
6th Av F Line – Award 2016
9. Clark Street Tube
Clark Street 2/3 Line – Award 2016
7
8
9
10
11
12
13
Sandy: Addressing the Yards
Recovery Projects:
Rockaway Park Yard-Power Cables 2014
207 Street Yard-Power Cables
148th Street Yard-Power 2015
Coney Island Yard-Power Cables 2016
2015
Resiliency Projects:
207th Street Yard
2015
148th Street Yard
2015
Coney Island Yard 2016
Yards will be addressed in multiple contracts with varied schedule.
We are providing near term protection at the yards. Coney Island Temporary parameter
protection was awarded this year. Similar plans for 207th Street and 148th Street Yards in
early 2015.
Sandy: Coney Island Yard
15
Sandy: South Ferry Rehabilitation
Sandy: South Ferry Rehabilitation
Sandy: South Ferry Rehabilitation
Signals and Systems
Sandy Restoration and Resiliency

Supports all Signal work in the Tunnels
• Rutgers and Cranberry Tubes which are planned for award in 2015;
and the Canarsie Tube.

Signals will take the lead in the modernizing of the Yard
Projects:
• 207th St Yard (including 200th St Interlocking) is planned for award
for 2016. This will be the first major capital investment in the yard
since the 1930s
• 148th St Yard would follow next in 2017/18
• Rockaway Park would be awarded in 2018
• Coney Island Yard, the largest of the 4 yards would be done in a
phased approach to minimize operational impact.
(note Yard projects – over $1B in work)
20
2010-2014
CBTC
Implementation Roadmap
Replace 11 Interlockings
•Flushing (Awarded)
•Culver (Awarded)
•Queens Blvd (2012 Award)
•Dyre Ave (2012 Award)
•34th, W4th and York Sts
Deploy CBTC
•Flushing (Awarded)
•Culver Test Track (Awarded)
Equip Fleets w/CBTC Equipment
•#7 Line Fleet (Awarded)
•Queens Blvd Fleets
2015-2019
CBTC
Implementation Roadmap
Replace 13 Interlockings
•
•
•
•
•
8th Ave(2)
6th Ave(4)
63rd Street(4)
Culver(2)
Broadway(1)
Deploy CBTC
• Qns Blvd Line (QBL) CBTC
• 6th Avenue Line CBTC (incl. 63rd St)
• Culver Line CBTC
Equip Fleets w/CBTC Equipment
• 6th Avenue Line Fleet
• 8th Avenue Line Fleet
Based on Full 2015-2019 Program Projects Full Funded
Infrastructure & Facilities
Substations and Power Upgrades
• Construct 3 new substations in Staten Island
Support new technology trains
• Construct 3 new substations on Canarsie Line
Support increased ridership demands
• Begin design for new substations in Manhattan
(6th and 8th Ave Lines)
• Support CBTC Rollout
• Upgrading Traction Power system
• Address substations which are beyond useful life
• Rehabilitating four substations
29
New Dorp Substation, Staten Island
30
Clifton Substation, Staten Island
31
Upgrade HVAC systems
Overcoat painting
Stations Rehabilitation
Number of Stations
Category
Component
Renewal
ADA Accessibility
Elevators/Escalators
Total
2010-14
126
38
9
13
186
2015-19
176
20
14
34
244
35
Small Business Mentoring Projects
Numbers of Projects
2014
2015
SBMP-Tier 1
24
20
SBMP Tier 2
11
13
SBFP
15
9
225 Street – Broadway-7th Ave Line
After
Before
Platform Canopy
20
104 Street
Jamaica Line
Street stair and canopy
Hunters Point Avenue
Flushing Line
Station renewal
ADA Accessibility
Systems and Security
New Bus Command Center
• Design, furnish, and install a new digital bus
radio communications system for NYCT and
MTA Bus.
• Design and construct a modern, secure
command center for NYCT and MTA
Bus operations.
44