Brown - Substation Business Application Using CIM PI AF

Download Report

Transcript Brown - Substation Business Application Using CIM PI AF

December 12, 2007
Substation Business
Applications using
CIM / PI AF
by
Stephen Diebold
Manager – Real Time Systems
Kansas City Power & Light
Agenda
• Overview of KCP&L
• CIM / PI AF Project
 A Convergence of Opportunities
 Main Goal
 Situation Without Project
 Closing the Loop
 Asset-Related Applications
 Applications
• Interoperability Test
• Project Status
• Questions
• Over 810,000 customers
• Peak in excess of 5,660 MW
• Service territory across 47 counties
in MO and KS covering 17,934 sq.
miles
• Over 3,170 employees
• 30 office/service center locations
• 9 generation plant sites and 10
peaking facilities
• 3,309 miles transmission lines
• 24,466 miles of overhead
distribution lines
• 3,400 miles of underground
distribution lines
• 322 substations
CIM/PI AF Project
A Convergence of Opportunities
• EMS comes with PI Historian
– Stores history of EMS real-time point
data
– PI features for model-based access to
tags
– Utilizes standards-based CIM model for
EMS database configuration
CIM/PI AF Project
Main Goal
Transmission Engineering Interest
in moving from
Event-based maintenance
to
Condition-Based Maintenance
CIM/PI AF Project
Situation Without Project


AF

PI Server
..

EMS gathering 50,000+ points of
real-time data
CIM database where equipment
and associated real-time data
points defined for EMS
Point data history stored in PI tags,
but accessible only by point name
PI product (AF) able to model
equipment’s relationships to tags,
but product not currently used
..
CIM DE
Environment
EMS
field devices
CIM/PI AF Project
Closing the Loop
Export CIM model data to PI AF product
Create PI equipment / asset model
for retrieving historic tag data
• Create infrastructure for
generalized retrieval of
historic real-time information
AF
PI Server
GDA
(Utility Integration Bus)
..
– on equipment basis (by reference to
equipment location in system)
– on asset basis no matter where
asset has been moved in system
• Generalized retrieval is
essential to the creation of
applications
..
CIM DE
Environment
Network Manager
EMS
field devices
CIM/PI AF Project
Asset-Related Applications
Condition-Based Maintenance
Applications for transformers
and breakers
Condition-Based
Maintenance
Applications
AF
Asset
Management
System
PI Server
PI Server
GDA
(Utility Integration Bus)
•
•
•
•
..
Desktop access
Paging/Email notification
Web access
First step toward
“dashboard” access
to real-time Operations
data
..
CIM DE
Environment
Network Manager
EMS
field devices
Interoperability Test
• Demonstrate interoperability between ABB, SISCO and
OSISoft’s products based on the CIM and/or GDA.
• Verify compliance with the CIM for those CIM
classes/attributes involved in the information exchanges.
• Demonstrate the exchange of power system models using
the CIM and an RDF schema and XML representation of
the model data.
• Demonstrate exchange between ABB and SISCO products
using the services defined in the GDA Client and Server
interface standard.
Interoperability Test
Vendor
ABB
OSISoft, LLC
SISCO, Inc.
Product Name
• Network Manager, CIM
DE Toolkit
Tests
• Full Import using CIM XML and
GDA services
• Incremental Import using CIM XML
and GDA services
• PI AF
• Storage of the ABB model data
• PI System Explorer
• Review and browsing of the ABB
model data
• Part number: UIBPIWRAP-412095 Version 2.0.0 Beta
• PI Adapter
• Full Import using CIM XML and
GDA services
• Incremental Import using CIM XML
and GDA services
• Provide UIB message bus for
transport and communication
Project Status
• FAT completed June 4, 2010
• Interoperability tests completed
June 9, 2010
• SAT is being scheduled
Questions
Condition-Based
Maintenance
Applications
AF
Asset
Management
System
PI Server
PI Server
GDA
(Utility Integration Bus)
..
..
CIM DE
Environment
Network Manager
EMS
field devices
Contact information:
[email protected]
December 15, 2007