FEMS IMPLEMENTATION BY H.O. CORE TEAM
Download
Report
Transcript FEMS IMPLEMENTATION BY H.O. CORE TEAM
MISSION
FEMS
IMPLEMENTATION BY
H.O. CORE TEAM ON
WAR FOOTING BASIS
H.O. CORE TEAM
• 1. MR. AJAY CHAFALE – AE-MIS-HO
• 2. MR. SATISH NAWATHEY – AEDOMBIVLI DIVISION .
• 3. MR. T.G. DESHPANDE – JE –
KALYAN – R – DIVISION
• 4. MR. ABHAY RAUT – JE –
WASHI CIRCLE
H.O. CORE TEAM
• 5. MR. AJAY KHODKE – SA – HO – IT
• 6. MRS. KIRTI MODAK – AP – MIS –
CELL , HO , MUMBAI.
• 7. MR. BAGUL – AP – HO – IT
• 8. MR. TUSHAR BIND – AP – HO - IT
LOCATION
THROUGH OUT THE
STATE AT VARIOUS
ZONE / CIRCLE
LEVELS
TARGET
• TO COMPLETE ALL THE ACTIVITIES
OF FEMS AND GENERATE THE
FEEDER WISE ENERGY AUDIT
REPORTS FOR A SUB DIVISION
• ANALYSIE THE REPORTS AND THEN
TAKE PROPER ACTIONS FOR
REDUCING THE LOSSES BY USING
FEMS AS A TOOL.
TARGET
• TO FORM A ZONAL / CIRCLE WISE
TEAM TO RESOLVE THE PROBLEMS
RELATED WITH FEMS AT THE SAME
LEVEL ONLY.
• H.O. CORE TEAM WILL BE ALWAYS
SUPPRTING TO ZONAL / CIRCLE TEAM
FOR 24 Hrs. AND 365 DAYS
THREE DAYS WORKSHOP AT
ZONAL / CIRCLE LEVEL
INCLUDES
• INSTALLATION OF SOFTWARE
• COMPLETE FEEDING OF MASTER
DATA – ( 11 Activities )
• VARIOUS TRANSACTIONS LIKE
• DT FAILURE &COMMISSIONING
• FEEDER INTERRUPTIONS
ACTIONS RELATED WITH
ENERGY AUDIT
• SUB STATION , SUB DIVISION WISE
AND FEEDER WISE CONSUMPTION AS
AN IN PUT.
• ACCEPTING THE ( BILLED UNITS ) HT
& LT BILL DATA COMING FROM “IT”
• GENERATING THE ENERGY AUDIT
REPORTS – FEEDER WISE AND SUB
DIVISON WISE ALSO.
OUT PUT OF
HO CORE TEAM
• GENERATING THE
FEEDER WISE LOSSES
AT SUB DIVISION
LEVEL THROUGH
FEMS HAS STARTED.
• UPDATE INFORMATION
IS AS FOLLOWS
• TOTAL NO OF
FEEDERS FOR E.A.=
%
%
%
%
LOSS
LOSS
LOSS
LOSS
>
50%
betwe
en
25%
&
50%
betwe < 5%
en
5% &
25
CIRCLE WISE INFORMATION
CIRCLE
i)
ii)
Kalyan
–I
Kalyan
– II
S / DN
8 Nos
8 Nos
LOCATION
1) East – I
3) MIDC
5) Netivali
7) Kalyan – III
2) West
4) East – II
6) Kolshewadi
8) Kalyan – IV
1)Ulh - 1
3) Ulh - III
5) Ulh - V
7) Badlapur
2) Ulh - II
4) Ulh - IV
6) Ambernath
8) Shahapur
ZONAL / CIRCLE
TEAM
i)
Mr. Oze –
JE
Approx.
Participants
– 25 Nos
CIRCLE WISE INFORMATION
CIRCLE
RASTA
PETH
S / DN
4 NOS
LOCATIONS
i)
ii)
iii)
iv)
Shivaji
Nagar
Aundh
Ganesh
Khind
Nagar
Road
PARTICI
PANTS
Approx. 40
to 50
Participants
ZONAL /
CIRCLE TEAM
i)Mr. Nakate –
Dy.EE
ii)Mr. Wadodkar –
Dy.EE
iii)Mrs. Ambadkar
– J.E.
iv)Mrs. Asha
Pawar - Sub. Eng
v)Mr. Jayant
Limaye –
Sub.Eng.
CIRCLE WISE INFORMATION
CIRCLE
S / DN LOCATIONS
PARTICIP
ANTS
ZONAL /
CIRCLE
TEAM
Mr. Chikate
– S.A. – I.T.
– Vasai .
VASAI
4 NOS
i) Vasai - West
ii) Virar - East
iii) Virar - West
iv) Dahanu
Approx. 15
to 20
Participants
CIRCLE WISE INFORMATION
CIRCLE
S /DN
LOCATIONS
PARTICI
PANTS
ZONAL / CIRCLE
TEAM
Being at Initial
Stage
i)
i)
ii)
iii)
NANDED 1 No
BID
LATUR
NANDED
Approx.
URBAN S/DN 30 to 40
Participa
nts
ii)
Mr. Inamdar –
JE
Mr. Wadze JE
CIRCLE WISE INFORMATION
CIRLE
S/DN
LOCATION
PARTICI ZONAL / CIRCLE
TEAM
PANTS
i)
ii)
i)
ii)
Parbhani 3 Nos
Jalna
i)
ii)
iii)
Hingoli
Parbhani
Jaln-R
Approx.
10 to 15
Participa
nts
Mr. Kale – JE
Mr. Vishwas
sabnis – J.E.
CIRCLE WISE INFORMATION
CIRCLE
S / DN LOCATION
PARTICIP
ANTS
ZONAL /
CIRCLE
TEAM
i)
Aurangabad
8 Nos
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
Chavani
Cidco
Shahaganj
Kranti Chawk
Power House
Sillod
Kannad
Vaijapur
Approx.
20 to 25
Participant
s
ii)
Mr. Kale –
JE
Mr. Vishwas
Sabnis –
J.E.
CIRCLE WISE INFORMATION
CIRCLE
S / DN LOCATION
PARTICIP
ANTS
ZONAL /
CIRCLE
TEAM
i)
ii)
i)
Kolhapur 2 Nos
i)
ii)
Kolhapur
North Zone
Kolhapur
East Zone
Approx. 30
to 40
Participants
Mr.
Kumthekar
– AE
Mr.
Bhagwat JE
CIRCLE WISE INFORMATION
CIRCLE
S / DN
LOCATION
PARTICIP
ANTS
ZONAL /
CIRCLE
TEAM
i)
i)
Sholapur 1 No
Sholapur – A Approx.
Zone
5 to 7
Participants
Mr.
Rajkumar
Patil – JE
CIRCLE WISE INFORMATION
CIRCLE
S / DN
LOCATION
PARTICIP
ANTS
ZONAL /
CIRCLE
TEAM
i)
i)
Sangli
2 Nos
i)
ii)
Sangli Approx.
Central 10 to 15
Participants
Zone
Sangli
North
Zone
Mr.
Jagdale –
JE
CIRCLE WISE INFORMATION
CIRCLE
S / DN
LOCATION
i)
2 Nos
i)
Karad
ii)
PARTICIPA
NTS
Kard – Approx.
U
5 to 8
Karad - Participants
II
ZONAL /
CIRCLE
TEAM
CIRCLE WISE INFORMATION
CIRCLE
S / DN LOCATION
PARTICIPA
NTS
ZONAL /
CIRCLE
TEAM
i)
i)
Washi
2 Nos
i)
ii)
Panvel – U
Bhingari
Washi
Railway
Approx. 15
to 20
Participants
Mr.
Abhay
Raut –
JE
CIRCLE WISE INFORMATION
CIRCLE
S / DN
LOCATION
PARTICIPA ZONAL /
CIRCLE
NTS
TEAM
i)
i)
Thane
3
Nos
i)
ii)
iii)
Neelam
Approx.
Nagar
5 to 7
Participants
Kopri
Lokmanya
Ms.
Manisha
Surwade
– JE
CIRCLE WISE INFORMATION
CIRCLE
S / DN
LOCATION
PARTICIPA
NTS
ZONAL /
CIRCLE
TEAM
Mr. Amrutkar
from “IT”
Nasik
i)
Nasik
1 No
Satpur
MIDC
Approx.
5 to 7
Participants
CIRCLE WISE INFORMATION
CIRCLE
S / DN
LOCATION
PARTICIPA
NTS
i)
1 No
Amaravati – U
Approx.
25 To 40
Participants
Amaravati
REMARK
Complete –
one day
training
session for
Morshi Dn.
At Morshi
CIRCLE WISE INFORMATION
CIRCLE
S / DN
LOCATION
PARTICIPA
NTS
ZONAL /
CIRCLE
TEAM
i)
i)
ii)
Nagpur 2 Nos
Rural
Nagpur
Urban
i)
ii)
Nagpur
Rural
S/Dn
Shankar
Nagar
Approx.
25 to 30
Participants
Mr.
Lonare
– JE
CIRCLE WISE INFORMATION
CIRCLE
S / DN LOCATION
PARTICIPA ZONAL /
CIRCLE
NTS
TEAM
i)
i)
Chandrapur
1 No
under
Nagpur
Rural Zone
including
Bhandara &
Gondia Circle
Ballarshah
Approx.
25 to 30
Participants
ii)
Mr. Amit
Shivalkar
– JE
Mr.
Shendre
– JE
CIRCLE WISE INFORMATION
CIRCLE
S / DN
LOCATION
Ratnagiri
Circle
2 Nos
i)
ii)
R–I
CHIPLUN Rural
PARTICIPANTS
ZONAL /
CIRCLE
TEAM
Mr.
Harshad
Apate –
AP
Approx. 10 to 12
Participants
Mr. Misal
JE
Mr.
Sinkar
JE
CIRCLE WISE INFORMATION
CIRCLE
Sindhudurg
S/
DN
LOCATION
2 Nos i)KUDAL - U
ii)RAJAPUR
PARTICIPANTS ZONAL /
CIRCLE
TEAM
Approx. 5 to 7
Participants
STATISTICAL CIRCLE WISE
TOTAL INFORMATION
TOTAL NO
TOTAL NO
OF CIRCLES OF S / DNS
25 NOS
57 NOS
APPROX.
REMARK
TOTAL
IN ADDITION
PARTICIPANTS TO THIS SAY
APPROX.
250 TO 300
AROUND
200
ENGINEERS
HAVE
TAKEN
TRAINING AT
NASIK TRD
TILL UP
DATE .
OBSERVATIONS
• EXISTING METERS AT ALL 33/22/11 KV
S/S NEEDS TO BE REPLACED BY
STATIC OR ELECTRONIC WITH HIGH
CLASS & ACCURACY ON TOP
PRIORITY.
• ONLY INTRESTED ENGINEERS ARE
FAMILIER WITH CMS AND FEMS
ACTIVITIES AND HENCE ACTIVITIES
OF S/DN ARE CONTINUED.
OBSERVATIONS
• MANY S/DNS ARE DEPENDENT ON
OPERATOES ( OUT SOURCED )
• ACTIVITIES GETS STOPPED ,THE MOMENT
ENGINEER GETS TEANSFERED OR
OPERATOR LEAVE THE JOB.
• ALL SUB DIVISION WISE LOSSES VARIES
FROM 8% TO 40 %
SOFT REQUIREMENT
• 1. AS AND WHEN THERE IS A DESIRED OUT
PUT,CONCERNS SHOULD NOT BE
TRANSFERRED IRRESPECTIVE OF NO OF
YEARS.
• 2. PREFERABLY ONE INDEPENDENT
ENGINEER SHOULD OPERATE ALL THESE
ACTIVITIES AT SUB DIVISION LEVEL
RELATED WITH CMS AND FEMS AND
ALSO RECENTLY INTODUCED SPOT
BILLING SYSTEM.
SOFT REQUIREMENT
• 3. IF THE REQUIREMENT NO -2 IS FULL
FILLED THEN THE ACTIVITIES WILL
CONTINUE FOR A LONGER PERIOD
• 4. AMC OF PROFIT CENTERS SHOULD
BE EITHER AT CIRCLE LEVEL OR
AT THE MOST AT ZONAL LEVEL.
SOFT REQUIREMENT
• AN APPROPRIATE ACTION SHOULD
BE TAKEN FROM MANAGEMENT
SIDE TO BOOST THE MORAL OF THE
ZONAL / CIRCLE TEAM
• MSEDCL SHOULD PROVIDE FACILITY
TO AVAIL INTREST FREE LOAN TO
PURCHASE DESKTOP PC OR LAPTOP
TO WORK EVEN AT RESIDANCE.
SOFT REQUIREMENT
• A SEPARATE INDEPENDENT TEAM
FROM IT SHOULD BE THERE FOR
DEVELOPMENT OF FEMS & CMS
• CMS & FEMS TRAINING SHOULD BE
IMPARTED TO INDUCTION BATCH ON
TOP PRIORITY.