Solar Power Projects

Download Report

Transcript Solar Power Projects

‫بسم هللا الرحمن الرحيم‬
Proposed Projects for Promotion
2014
1
General Information
 Total Installed Capacity
 Total Generation
 Peak Load – 2013
 Number of Customers
 Population - 2012
 Energy Access up to now
 Average Annual Growth
= 2,850 MW
= 8,182.231 GWH
=1962 MW
=1,976,000
= 35 Millions
= 34 %
= 14 %
2
3
DAL Dam
Location : Second Cataract at
DAL area ( Nile River State)
(North of Khartoum)
 Generation Capacity: 8 Units –
642 MW.
Preliminary Feasibility Study :
Available.
Funding: Needed.
0
4
Dagash Dam
Location : South of Mograt
Island (Nile River State) (North
of Khartoum)
 Generation Capacity: 8 units
with total capacity 320MW.
 Construction period 5 years.
Preliminary Feasibility Study :
Available.
Funding : Needed.
0
5
Location : 120 km north the city of
Dongola.
Generation Capacity: 360 MW
(6X60MW) Kaplan type.
 Project Status: Contracted
Funding : Needed.
0
6
Shereik Dam
Location : on the 5th Nile cataract.
Generation Capacity: 420 MW
(6X70MW) Kaplan type.
Project Status: Contracted.
Funding : Needed.
0
7
8
Location: Red sea state in eastern Sudan - about 70 Km
to the north of Port Sudan
Generation Capacity & Configuration : Red Sea Power
Plant consisting of two independent units with a
configuration of 2X300 MW steam turbine units.
Plant fuel type: coal
 Project contract type : turnkey project
Project Status : Contracted
Fund : Needed
9
The main objective of these projects is to supply
Sudan National Grid with clean, sustainable, eco-
friendly energy with low operating cost.
10
11
Red Sea wind farm
Location: Tokar south of Port Sudan,
Red Sea State.
Generation Capacity: 180MW
Status: wind measurement
ongoing.
 Feasibility study : ongoing.
Funding : Needed.
12
Location: Nyala.
Capacity: 20MW. It will be
implemented in two
phases, 10 MW each.
Annual average wind speed: 7.9 m/s.
Feasibility study: available
Land: Available
Estimated commission
date for phase one: 2013-2014.
Status: Tendering phase
Fund : Needed
13
Average wind speed 4.2
– 8.1 meter/second at
80 meters above
ground level (agl)
Areas with highest wind
speed:
oRed Sea
oNorthern Sudan (Dongola)
oJabel Marra Mountains in
western Sudan
14
Solar Power Projects
15
Capacity: 10 MW
Location: Khartoum
Estimated commission date:
2013
Feasibility Study : available
Tendering for the project will be
at end of 2013
Funding : Needed
16
Capacity: 5 MW
Location: Nyala
Estimated commission
date : 2013
Feasibility Study :
available
Tendering for the project
will be at end of 2013
Funding : Needed
17
Capacity: 3 MW
Location: Al Fashir
Estimated commission date:
2013
Feasibility Study : available
Tendering for the project
will be at end of 2013
Feasibility study : Needed
Funding : Needed
18
Capacity: 2 MW
Location: Al Geniena
Estimated commission
date: 2013
Feasibility Study : available
Tendering for the project
will at end of 2013
Funding : Needed
19
Average
daily
solar
irradiation: 5.8 – 7.2 kWh/m2
The
solar
radiation
increases in northern and
west-northern areas and
decreases towards the south
20
Location: River Nile State(North of Khartoum)
Feasibility Study: Available
Route Length: 350km OHTL – 500KV Line – Single
Circuit on self supported Lattice Tower Twin Conductors
2X240/40 mm² Aluminum
Substation: 2 New substations
Funding : Needed.
21
Location: Blue Nile State(South of Khartoum)
Feasibility Study: Available
Route Length: 300km OHTL – 220KV Line – Double
Circuit
Substation: 4 New substations
Funding : Needed
22
Eldibaibat – Eldalang
Transmission Line Project
 Location :- South Kordofan .
 60 KM , 220 KV , Double Circuit .
 One Sub. Station .
 Feasibility Study Available .
 Fund Needed .
23