Transcript Document

Anadyr
Chukotka Autonomous Okrug
Gateway to the Pacific
2013
PDAC
Chukotka at a Glance
• Far Eastern region of Russia
• Climate: Arctic (permafrost)
• Total population: ≈ 50 000
- (1/3 - Indigenous peoples)
• Total area: 721.5 thousand sq km
• Density: ‹ 0.1/sq km
www.chukotka.org
www.visitchukotka.com
Mineral Endowment
Chawn-Bilibino Cluster:
Gold, Silver, Copper, Tin
• Gold production: 564 K oz in 2012
• Silver production: 5.5 mil. oz in 2012
Anadyr Cluster:
Coal, (Oil), Gas
• Coal Mining
• Anadyr’ Mine - 240 Kt in 2012
• Nagornaya Mine - 90 Kt in 2012
• Tigers Realm – Active Development
• Natural gas: 1.024 bn. CFT
www.chukotka.org
www.visitchukotka.com
Our key advantages
 Mineral wealth
 Access to the Pacific Ocean
 Proximity to the world’s most prospective
markets: China, Japan, Korea
 Reducing administrative barriers
www.chukotka.org
www.visitchukotka.com
Major Investors in Chukotka
www.chukotka.org
www.visitchukotka.com
Kinross Gold Corporation
Kupol (Au-Ag deposit)
LOCATION: Bilibinsky township, Chukotka
OPERATION: Underground
Mineral Reserves & Resources (Gold)
Tonnes, (kt)
Grade, (g/t)
Ounces,( koz)
8 092
9.29
2 416
482
14.94
231
Tonnes, (kt)
Grade, (g/t)
Ounces,( koz)
1 950
17.80
1 116
M&I Resources
243
17.79
139
Inferred Resources
155
12.82
64
2P Reserves
Inferred Resources
Dvoinoye (Au-Ag deposit)*
LOCATION: Chaunsk township, Chukotka
OPERATION: Underground
Mineral Reserves and Resources (Gold)
2P Reserves
* Delivery of the first ore in the 2H 2013
www.chukotka.org
www.visitchukotka.com
6
Regional Mining Company LLC
Baimskaya Ore Field
LOCATION: Bilibinsky township
OPERATION: Exploration Stage
www.chukotka.org
www.visitchukotka.com
7
Anadyr Cluster Highlights: Bering Coal Basin
Nagornaya
Investments
Limited option
(Canada)
Tigers Realm Coal
Australia/Canada
80/20
Target: 430 Mt
0.5Mt early HCC
in 2015
Tigers Realm Coal
Australia/Canada
40*/60
licence and
project area
Beringovsky
Small, shallow port
Open 5 months
Proposed Arinay
Port
Re-opening an
ancient fjord
Year round,
Depths to 30m
412 Mt Indicated
and inferred
Target: +230Mt
www.chukotka.org
www.visitchukotka.com
8
Long-Term Development Plan of Major Gold Deposits
Kayenmivaam
Scoping Study
Verkhne-Krichalskaya
Baimskaya Ore Field
Vodorazdel’naya
Prefeasibility Study
Klen
Dvoinoe
Kekura
Mayskoye
Kupol
2020
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
Valunistoe
1999
1997
1996
1995
1994
1993
1992
Karalveem
1998
Feasibility Study
Current Status
Kanchalano-Amguemskaya
Electricity Infrastructure
Investment Plan 2014-2018
Total: $ 708,9 mln
Mln. USD
232.90
250
193.20
200
140.90
150
109.00
100
50
32.9
0
2014
2015
2016
2017
2018
www.chukotka.org
www.visitchukotka.com
Overland Transportation Infrastructure Projects
Omolon-Anadir’-BilibinoKomsomolsk-Egvekinot road
Total: $899,8 Mln
Mln. USD
274.3
300
250
209
233.7
200
150
100
77.4
105.4
50
0
2014
2015
2016
2017
2018
www.chukotka.org
www.visitchukotka.com
Key Location on the Pacific Rim
www.chukotka.org
www.visitchukotka.com
12
Incentives
Preferential treatment for businesses in Chukotka:
 Initiative to reduce income tax rate
 Initiative to reduce mineral resource extraction taxes
 Assistance in infrastructure development
 Assistance in land allocation
 Consulting, organizational and informational support
www.chukotka.org
www.visitchukotka.com
13