DMADV Review Template

Download Report

Transcript DMADV Review Template

DMADV Review Template
DMADV Roadmap
10 steps model
D
M
A
D
V
© LSSA 2010
1 – Project Selection / Project Management
2 – Determine Functional Requirements
3 – Translate into technical requirements
4 – Validate Measurement Procedures
5 – Develop Concept Design
6 – Identify potential influence factors
7 – Determine CTQ-X relationships
8 – Determine Optimal Settings
9 – Capability analysis on Verification run
10 – Close out Project and Transfer
2
1 – Project Selection
Problem
description:
Objectives:
.
.
Picture or drawing to explain
© LSSA 2010
3
1 – Project Selection
Targets:
In Scope:
Out of scope:
Deliverables:
Hard Benefits:
Soft Benefits:
© LSSA 2010
.
.
.
.
.
.
4
1 – Project Management
Supplier:
Champion:
User:
Black Belt:
.
.
.
.
Project leader:
.
Name:
.
© LSSA 2010
Role:
.
Responsibility:
.
5
1 – Project Management
SIPOC Process Mapping
Supplier:
Inputs:
Process:
Outputs:
Customers:
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
.
.
.
.
.
© LSSA 2010
6
2 – Functional Requirements
Determine Functional Requirements
© LSSA 2010
7
3 – Technical Requirements
Translate into technical requirements
© LSSA 2010
8
4 – Measurement Procedures
Validate Measurement Procedures
© LSSA 2010
9
5 – Concept Design
Develop Concept Design
© LSSA 2010
10
6 – Potential influence factors
Identify potential influence factors
© LSSA 2010
11
7 – CTQ-X relationships
Determine CTQ-X relationships / CTQ Flowdown
© LSSA 2010
12
8 – Optimal Settings
Determine Optimal Settings
© LSSA 2010
13
9 – Capability & Verification
Perform Capability analysis on Verification run
© LSSA 2010
14
10 – Close out project
10 – Close out Project and Transfer
© LSSA 2010
15