Assignment 3 2015 dce2.ppt

Download Report

Transcript Assignment 3 2015 dce2.ppt

Student name:
………………………………………….….
Course of study:
Unit 51
Civil Engineering Construction
Assessment Number 3
(Please tick)
Subsidiary Diploma(pt)
Date of issue : 2nd June 2015
Assignment submission: 21st June 2015
Extended Diploma(ft)
 Diploma (ft Yr 2)
Please turn over for
assessment tasks……..
Tutor
Dennis Edwards
This assessment provides an opportunity to complete the criteria described in the
shaded boxes below. Please refer over the page for the assessment tasks you
will need to do to satisfy the criteria identified.
Identify the earthwork activities carried out when performing deep excavations and
cuttings.
P1
Describe methods of controlling groundwater
P2
Describe the forms of substructure commonly used for commercial and industrial
civil engineering projects.
P3
Explain how drainage is integrated into substructures
P4
Explain how public utilities are integrated into substructures.
P5
Describe the construction plant and equipment used to erect steel and concrete
frames.
P6
Explain the use of steel and concrete frames in superstructures
P7
Describe health and safety management roles and responsibilities on civil
engineering sites.
P8
Explain the hazards and risks associated with substructure activities.
P9
Explain the hazards and risks associated with superstructure activities.
P10
Explain the effect of a high water table on deep excavations
M1
Assess the merits and demerits of common forms of construction for substructures
M2
Relate the construction plant and equipment used in the construction of frames to
the materials and the site conditions encountered.
M3
Evaluate civil engineering methods used to form deep excavations and
basements
D1
Appraise civil engineering construction methods used for framed structures with
deep substructure foundations.
D2
Signed:
Signed:
Date:
Signed:
Date:
Date:
Tutor
IV pre-issue
IV post-assessment
Authenticity; I certify that the work I have submitted for this assessment is entirely my
own and that all other material has been properly referenced.
Signature;…………………………………………………………………………
name;…………………......................................................................………
Date;………………………….
Formative/Summative Assessment Feedback Sheet
F¨
S¨
Course:
National
Certificate/Diploma
Cohort
Unit:
51
Unit Code:
Assignment Ref:
3
IV Brief Date:
Issue Date:
Submission
Date
L/600/0368
21st June 2015
19th May 2015
Grading
Criteria:
Achieved
P8
Yes / No
P10
Yes / No
M2
Yes / No
D2
Yes / No
Learner Action Plan (To be completed by Learner with Assessor):
Tutor:
Date:
Learner:
Date:
Scenario.
You have been appointed as safety officer on civil engineering site. You have been asked to
attend a meeting with the main contractor and the client. They have asked you to prepare a
report on you new role.
The Site.
The work will involve excavations, earthworks and groundwater control for a greenfield
development, with granular sub-soil and a high water table, and an RC pump station with a
deep trench
Task 1
Describe heath and safety management roles and responsibilities on civil engineering sites. In
particular, You must describe the role of the planning coordinator including the main headings
contained in the contractors health and safety file.
.
Risks and hazards associated with the project should be described in the form of a risk audit
You must explain the hazards and risks associated with superstructure activities. This should build on
the evidence for P6 and P7.
(P8 & P10)
Task 2
Assess the merits and de-merits of common forms of construction for substructures. Your evidence
should clearly show that they can distinguish between different forms of construction and make
reasoned assessments.
Examples include monolithic structures, rafts, in-situ and pre-cast piles (sheet steel, secant,
contiguous) and the feasibility of constructing superstructures on chosen substructure systems.
(M2)
PLEASE NOTE THAT YOU WILL BE REQUIRED TO REFERENCE ALL YOUR
WORK AND ANY IMAGES YOU USE IN ACCORDANCE WITH THE
REFERENCING SESSION EXPLAINED BY THE LRC STAFF.