Assignment 2 DCE take 2.ppt

Download Report

Transcript Assignment 2 DCE take 2.ppt

Student name:
………………………………………….….
Course of study:
(Please tick)
Subsidiary Diploma(pt)
Extended Diploma(ft)
 Diploma (ft Yr 2)
Please turn over for
assessment tasks……..
Tutor
Dennis Edwards
Unit 51
Civil Engineering Construction
Assessment Number 2
Date of issue : 24th March 2015
Assignment submission: 21st April 2015
This assessment provides an opportunity to complete the criteria described in the
shaded boxes below. Please refer over the page for the assessment tasks you
will need to do to satisfy the criteria identified.
Identify the earthwork activities carried out when performing deep excavations
and cuttings.
P1
Describe methods of controlling groundwater
P2
Describe the forms of substructure commonly used for commercial and industrial
civil engineering projects.
P3
Explain how drainage is integrated into substructures
P4
Explain how public utilities are integrated into substructures.
P5
Describe the construction plant and equipment used to erect steel and concrete
frames.
P6
Explain the use of steel and concrete frames in superstructures
P7
Describe health and safety management roles and responsibilities on civil
engineering sites.
P8
Explain the hazards and risks associated with substructure activities.
P9
Explain the hazards and risks associated with superstructure activities.
P10
Explain the effect of a high water table on deep excavations
M1
Assess the merits and demerits of common forms of construction for
substructures
M2
Relate the construction plant and equipment used in the construction of frames
to the materials and the site conditions encountered.
M3
Evaluate civil engineering methods used to form deep excavations and
basements
D1
Appraise civil engineering construction methods used for framed structures with
deep substructure foundations.
D2
Signed:
Signed:
Date:
Signed:
Date:
Date:
Tutor
IV pre-issue
IV post-assessment
Authenticity; I certify that the work I have submitted for this assessment is entirely my
own and that all other material has been properly referenced.
Signature;…………………………………………………………………………
name;…………………......................................................................………
Date;………………………….
Formative/Summative Assessment Feedback Sheet
F¨
S¨
Course:
National
Certificate/Diploma
Cohort
Unit:
51
Unit Code:
Assignment Ref:
2
IV Brief Date:
Issue Date:
Submission
Date
L/600/0368
21st April 2015
23rd March 2015
Grading
Criteria:
Achieved
P4
Yes / No
P5
Yes / No
P6
Yes / No
P7
Yes / No
M3
Yes/No
D1
Yes / No
Learner Action Plan (To be completed by Learner with Assessor):
Tutor:
Date:
Learner:
Date:
Scenario.
Your company has been awarded a contract to construct a twostorey basement with retail and commercial premises above on five
floors. You must appraise the methods by which this development
could be built and make recommendations on the method to be used
for the basement formation and a framed superstructure.
.
Task 1.
In the form of an illustrated report explain how the drainage is
integrated into the substructure, (P4)
Task 2. Explain how public utilities are
re integrated into substructures. You should explain how deep
concrete culverts ,plant rooms, cable trenching and service
ducts are incorporated in the structure. (P5)
Task 3. You must describe the construction plant and
equipment used to erect steel and concrete frames. Your report
should include drawing images and/or drawings of the
construction plant and equipment, with a statement on the
advantages and disadvantages of each. (P6)
Task 4. During the construction of the above structure you
should explain the use of steel and concrete for the framed
superstructure construction. You are to highlight the merits and
de-merits. The workforce skills required and the lifting and
placements and safe working access. (P7)
Task 5. You are must relate the construction plant and
equipment used in the construction of frames to the materials
used and the site conditions encountered. Evidence should
also refer to speed of erection and the labour required. (M2)
Task 6. You must evaluate civil engineering methods used to
form deep excavations and basements. You should
demonstrate critical thinking on a range of methods. Explain
how you would remove vast amounts of ovenburden (ground
boiling) and the merits of ramping back as opposed to using
cut-off walls or piles. (D1)
Task 7 You are to carry out an appraisal of civil engineering
construction methods used for framed structure with deep
substructure foundations. You are to look at the different types
of deep foundations and offer your views on the merits and dismerit of each. D(2)
PLEASE NOTE THAT YOU WILL BE REQUIRED TO REFERENCE ALL
YOUR WORK AND ANY IMAGES YOU USE IN ACCORDANCE WITH
THE REFERENCING SESSION EXPLAINED BY THE LRC STAFF.