PARAMAZ AVEDISIAN
BUILDING (PAB):
Bringing New Perspectives to AUA
Development
Dr. Lucig Danielian
Provost/Vice President
American University of Armenia
Currently…
When It will be ready…
The new building and its
facilities
Area – 10,000 sq.m
US construction Code built
Nice landscaping, pathway crossing the
building
All building – handicap accessible
Transparent-looking building (glass
windows for walkways)
Entrance and Lobby
West and East Wings
West wing -- parking (and technical
rooms), academic programs, classrooms,
seminar rooms, faculty offices, research
centers, lounge, student lockers,
gallery, VIP residential area
East wing -- lecture halls, classrooms, Wet
lab of ECRC, GYM, technical rooms
Main Functions/Activities to
be Held in PAB
Teaching
Research
Conferences, seminars, and
public lectures
Student activities
Occasional social events
Goals to be Achieved
Assure high standard conditions for learning
and working
Accommodate an increased number of
students, including foreign students
Enhance distance learning and
teleconferencing capabilities
Enlarge collaboration and partnerships with
local and regional institutions and
communities
Marketing all Four Buildings’
Facilities as one Package
Hosting conferences, seminars, and
trainings to attract various professional
and international organizations from
Europe and the Middle East
Generating Revenue
Using AUA hotel accommodations for that
purpose
Added Teaching Space
10 classrooms (of various
configurations) – not assigned to any
department
2 seminar rooms (for 24 persons)
Tiered Classroom (32 persons)
Lecture hall (70 persons)
Large lecture hall (197 persons)
Large Lecture Hall
Tiered Classroom
Academic Suites and Faculty
offices
7 academic suites
6 programs +
ECRC
Two
symmetrically
located suites on
each of the 1st,
2nd, 3rd floors
and one on the
4th floor
Assigning
principle - lottery
26 faculty offices
outside academic
suites
8 on each of the
1st, 2nd and 3rd
floors and 2 on
the 4th floor
Principle of
assigning – on
annual and
quarterly basis
Those for visiting
faculty to be
shared
The Building Systems
(Heating, Ventilation and Air-conditioning) –
comfort for all seasons
Lighting – sensor based, energy saving
Computerized Fire alarm system along with
Extinguishers
Security System
Camera surveillance system
Intruder alarm system
Electronic card access system (for parking area)
Centralized management of MB and PAB
Construction Work in Progress
Photo of the 3rd floor -finished
Construction Work in Progress
Construction Work in Progress
Technology
Wireless Internet access in the whole
building
Video-Conferencing Facility in the Large
Classroom (to be moved from room 26)
Centralized notebook service for visiting
faculty
Static Equipment for Lecture
Halls/Classrooms:
Large lecture hall
Tiered classroom
Large classroom
Regular Classrooms
• an LCD projector with
SXGA resolution,
• a notebook,
• multimedia
audio/video players,
• a motorized or pulldown projection
screen,
• a smart board or a
document camera.
• LCD projector
• Pull-down screen
Departmental Technology
Equipment to be partially moved
from Main building to PAB
Equipment to be purchased
newly
Wheeled carts for each department
LCD projector
Notebook
A/V player
Moveable screen
Furnishing
Brand new, custom-made furniture to be
produced for all building
Consistency in style/design
Material – durable Butcher block
Quality - American Woodwork Institute and
Cabinetry (AWIC) standards
Chairs/file cabinets to be purchased
Plastic chairs for classrooms
Several types of desk chairs to choose from
Services to be Available at PAB
GYM
Bookstore
Café with exit to open terrace area
Business plans for these 3 units to be
developed
Projected Schedule
Phase 1 – Completing construction
Phase 2 - furnishing
Phase 3 - Moving in
Phase 1
Phase 2
Phase 3
April
May
June
July
Aug
Sept
Oct
Nov
Departments/Services To Staying
in the MB
Library
Digital library (bringing back to MB)
Extension
Computer and research labs
Administrative services
Convenient access to both buildings
Bridge connecting the 3rd floor of the MB
with the 1st floor of PAB
Space Use in the Main Building
after the Move into PAB
First phase - no cost plan to be
implemented immediately
Second phase – a plan including
remodeling certain areas
•Decisions to be made Based on
Review of departmental needs
PAB – Look from West
Thank you for your attention
Ready for
Question and Answer Session