few GeV damping ring few GeV
Designing the ILC
pre-accelerator source KeV few GeV 250-500 GeV final focus extraction & dump IP bunch compressor
Superconducting RF Main Linac
main linac collimation 5 May 06
SLAC SPC
2
5 May 06
GDE Began at Snowmass
Snowmass 49 GDE members -------- Present GDE Membership Americas 22 Europe 24 Asia 18 About 30 FTEs SLAC SPC
3
ILC Timeline
2005 2006 2007 2008 2009 2010 Global Design Effort Project
5 May 06
Baseline configuration Reference Design
….
Technical Design ILC R&D Program Expression of Interest to Host International Mgmt SLAC SPC
4
Schematic of the BCD
5 May 06
SLAC SPC
5
Baseline Configuration Document
• Our ‘Deliverable’ by the end of 2005 • A structured electronic document – Documentation (reports, drawings etc) – Technical specs.
– Parameter tables – Revisions and Evolution through Change Control Process http://www.linearcollider.org/wiki/doku.php?id=bcd:bcd_home 5 May 06
SLAC SPC
6
The Key Decisions
Critical choices: luminosity parameters & gradient
5 May 06
SLAC SPC
7
Making Choices – The Tradeoffs
Many decisions are interrelated and require input from several WG/GG groups
5 May 06
SLAC SPC
8
Parametric Approach
5 May 06
SLAC SPC
9
• •
Baseline Configuration Document
Latest Official Version of BCD BCD in MSWord files:
•
All-in-one-file
– Single PDF File – (2582kB, Updated Mar.28, 2006) Single MSWord File (5103kB, Updated Mar.28, 2006) •
By Area Nodes:
– General Parameters – – – – – – – Electron Source Positron Source (316kB) Damping Rings Ring to Main Linac Main Linacs (455kB) Beam Delivery (233kB, Updated Mar. 3, 2006) (296kB) (554kB, Updated Feb.27, 2006) (313kB, Updated Mar.28, 2006) (543kB) TeV Upgrade Scenario (26kB) 5 May 06
SLAC SPC
10
Primary e source
Positron Source
Helical Undulator Based Positron Source with Keep Alive System
e DR 150 GeV Helical Undulator In By-Pass Line Beam Delivery System 100 GeV Photon Collimators Target e Dump IP Photon Beam Dump Auxiliary e Source Photon Target Adiabatic Matching Device
Keep Alive: This source would have all bunches filled to 10% of nominal intensity.
5 May 06
SLAC SPC Positron Linac 250 GeV e + pre accelerator ~5GeV e + DR
11
Beam Delivery System
• Baseline (supported, at the moment, by GDE exec) –
two BDSs, 20/2mrad, 2 detectors, 2 longitudinally separated IR halls
• Alternative 1 –
two BDSs, 20/2mrad, 2 detectors in single IR hall @ Z=0
• Alternative 2 –
single IR/BDS, collider hall long enough for two push-pull detectors
5 May 06
SLAC SPC
12
GDE RDR / R&D Organization
ICFA FALC GDE R & D Board ILCSC (MAC) FALC Resource Board GDE Directorate GDE Executive Committee GDE Change Control Board
GDE
GDE Design Cost Board 5 May 06 Global R&D Program
SLAC SPC
RDR Design Matrix 13
GDE RDR / R&D Organization
ICFA FALC GDE R & D Board ILCSC FALC Resource Board GDE Directorate GDE Executive Committee GDE Change Control Board GDE Design Cost Board
ILC R&D Program
5 May 06 Global R&D Program
SLAC SPC
RDR Design Matrix
ILC Design Effort
14
Superconducting RF Cavities
Chemical Polish 5 May 06 Electro Polish
SLAC SPC
15
TESLA Test Facility Linac - DESY
e beam diagnostics undulator photon beam diagnostics
240 MeV
bunch compressor e beam diagnostics laser driven electron gun superconducting accelerator modules
120 MeV 16 MeV
pre accelerator
4 MeV
5 May 06
SLAC SPC
16
RF Power: Baseline Klystrons
Thales 5 May 06 CPI
SLAC SPC
Toshiba Specification: 10MW MBK 1.5ms pulse 65% efficiency 17
ILC R&D KEK ATF
ATF2
5 May 06
SLAC SPC
18
GDE RDR / R&D Organization
ICFA FALC GDE R & D Board ILCSC FALC Resource Board GDE Directorate GDE Executive Committee GDE Change Control Board GDE Design Cost Board
ILC R&D Program
5 May 06 Global R&D Program
SLAC SPC
RDR Design Matrix
ILC Design Effort
19
Jan Frascati
From Baseline to a RDR
2006 Bangalore July Vancouver Valencia Dec Freeze Configuration Organize for RDR Review Design/Cost Methodology Review Initial Design / Cost
5 May 06
Design and Costing SLAC SPC Review Final Design / Cost RDR Document Preliminary RDR Released
20
Cost Roll-ups
Area Systems e e+ damping RTML main BDS source source rings linac Technical Systems
Vacuum systems Magnet systems Cryomodule Cavity Package RF Power Instrumentation Dumps and Collimators Accelerator Physics
Global Systems
Commissioning, Operations & Reliability Control System 5 May 06 Cryogenics CF&S
SLAC SPC
21
Damping Rings
•
Positrons:
– Two rings of ~6 km circumference in a single tunnel. – Two rings are needed to reduce e-cloud effects unless significant progress can be made with mitigation techniques.
• Electrons: – One 6 km ring.
•
COSTING
– civil – tunnels – magnets – vacuum – etc 5 May 06
SLAC SPC
22
How to involve industry?
• Large Scale Project Characterization – – – –
Large Project Management Precision Engineering International Coordination Costing
• Industrialization toward Fabrication – – – – –
Civil Construction & Infrastructure Cryogenics Superconducting RF structures, couplers, etc Electronics and Control Systems Large Scale Computing
5 May 06
SLAC SPC
23
Global Design Effort
• The baseline configuration for the ILC has been established and is document in the BCD (a 700+ page electronic document) • We have put the BCD under configuration control and are evolving it now in a controlled manner • The BCD also defines alternatives and the combination of the baseline and alternative will give good guidance for the ILC R&D program • The BCD is now being used as the starting point and basis for the reference design / cost effort this year.
5 May 06
SLAC SPC
24
International perspective
Europe is conducting a long range plan of its particle physics program under aegis of CERN Council. Report due in July 2006.
In 2003, Funding Agencies Linear Collider (FALC) was formed to help guide the international effort on ILC. FALC provides common fund for GDE activities. It is now beginning to take up issues of defining a site selection process, more formal oversight of the R&D phase, etc.
The recent initialing of the ITER agreement establishing an international organization is an excellent template for the ILC.
5 May 06
SLAC SPC
25
GDE RDR / R&D Organization
technical
ICFA
Reporting
ILCSC (MAC) FALC FALC Resource Board
resources
GDE R & D Board GDE Directorate GDE Executive Committee GDE Change Control Board GDE Design Cost Board 5 May 06 Global R&D Program
SLAC SPC
RDR Design Matrix 26
Funding Agencies for the Linear Collider
• Seventh meeting held in Fermilab on 4 November 2005 •
Representatives from CERN (President of Council and DG), Canada (NRC), France (CNRS), Germany (BMBF), Italy (INFN), Japan (MEXT), Korea (MOST), UK (PPARC) and the US (DOE) was held in Fermilab on 4 Nov 05
• The Group agreed that a Common Fund should be established to fund the administrative support required for the GDE ‘Phase 1’, with the costs to be funded equally by the three regions. The Group agreed that the use of this method of funding would not be used to prejudge the basis of any future agreements. It should only be applicable for the duration of this Common fund MOU for ‘Phase-1’. This Common Fund would be administered by Fermilab and be the subject of a MOU to be agreed by the FALC Resources group 5 May 06
SLAC SPC
27
Funding Agencies for the Linear Collider
• The Group discussed the need to minimize duplication of reporting and increase communication between the current project structure and FALC. The Chairs of ICFA and ILCSC were invited to attend future meetings of the Group and the Chair of ILCSC was invited to attend future meetings of the FALC Resources Group.
• It was agreed that a subgroup, consisting of members of FALC from all three regions, would consider the future mandate of FALC, its composition, the relationship with existing bodies required as the project moved to a more formal governance structure and mechanisms by which funds could be made available both before and after a site decision. • It was agreed that the next meeting would be held on 22 May 2006 in Rome.
5 May 06
SLAC SPC
28
Creating an International Project
• Several Studies and Plans for ILC –
ECFA EUROPEAN COMMITTEE FOR FUTURE ACCELERATORS subcomittee EUROPEAN LINEAR COLLIDER STEERING GROUP
• “Report of the Sub-group on Organizational Matters” –
Features a detailed breakdown of top level governance and project management, how they relate to each other. It is based on regional organizations; mostly in-kind contributions; shared central management, oversight, responsibility. It is concerned with Europe and how to do it within European Labs (CERN) and structures
5 May 06
SLAC SPC
29
ECFA ILC Management Scheme
5 May 06
SLAC SPC
30
Creating an International Project
• Many models of International Collaboration –
ITER is the largest project, shared by six countries. There are both lessons learned and models of how to develop international project with agreed to costing, shared management, etc. Siting was a big problem
–
ALMA is a joint European, U.S. and Japan project with a shared management, mostly in kind contributions, etc. Being a big array, it is straight forward to divide how many modules are contributed by partners and siting is not an issue. But, they have recently dealt effectively with management and cost issues.
5 May 06
SLAC SPC
31
ILC Timeline
2005 2006 2007 2008 2009 2010 Global Design Effort Project
5 May 06
Baseline configuration Reference Design
….
Technical Design ILC R&D Program Expression of Interest to Host International Mgmt SLAC SPC