5 May 06

ILC Global Activities GDE, FALC

Barry Barish GDE Caltech

SLAC SPC

1

few GeV damping ring few GeV

Designing the ILC

pre-accelerator source KeV few GeV 250-500 GeV final focus extraction & dump IP bunch compressor

Superconducting RF Main Linac

main linac collimation 5 May 06

SLAC SPC

2

5 May 06

GDE Began at Snowmass

Snowmass 49 GDE members -------- Present GDE Membership Americas 22 Europe 24 Asia 18 About 30 FTEs SLAC SPC

3

ILC Timeline

2005 2006 2007 2008 2009 2010 Global Design Effort Project

5 May 06

Baseline configuration Reference Design

….

Technical Design ILC R&D Program Expression of Interest to Host International Mgmt SLAC SPC

4

Schematic of the BCD

5 May 06

SLAC SPC

5

Baseline Configuration Document

• Our ‘Deliverable’ by the end of 2005 • A structured electronic document – Documentation (reports, drawings etc) – Technical specs.

– Parameter tables – Revisions and Evolution through Change Control Process http://www.linearcollider.org/wiki/doku.php?id=bcd:bcd_home 5 May 06

SLAC SPC

6

The Key Decisions

Critical choices: luminosity parameters & gradient

5 May 06

SLAC SPC

7

Making Choices – The Tradeoffs

Many decisions are interrelated and require input from several WG/GG groups

5 May 06

SLAC SPC

8

Parametric Approach

5 May 06

SLAC SPC

9

• •

Baseline Configuration Document

Latest Official Version of BCD BCD in MSWord files:

All-in-one-file

– Single PDF File – (2582kB, Updated Mar.28, 2006) Single MSWord File (5103kB, Updated Mar.28, 2006) •

By Area Nodes:

– General Parameters – – – – – – – Electron Source Positron Source (316kB) Damping Rings Ring to Main Linac Main Linacs (455kB) Beam Delivery (233kB, Updated Mar. 3, 2006) (296kB) (554kB, Updated Feb.27, 2006) (313kB, Updated Mar.28, 2006) (543kB) TeV Upgrade Scenario (26kB) 5 May 06

SLAC SPC

10

Primary e source

Positron Source

Helical Undulator Based Positron Source with Keep Alive System

e DR 150 GeV Helical Undulator In By-Pass Line Beam Delivery System 100 GeV Photon Collimators Target e Dump IP Photon Beam Dump Auxiliary e Source Photon Target Adiabatic Matching Device

Keep Alive: This source would have all bunches filled to 10% of nominal intensity.

5 May 06

SLAC SPC Positron Linac 250 GeV e + pre accelerator ~5GeV e + DR

11

Beam Delivery System

• Baseline (supported, at the moment, by GDE exec) –

two BDSs, 20/2mrad, 2 detectors, 2 longitudinally separated IR halls

• Alternative 1 –

two BDSs, 20/2mrad, 2 detectors in single IR hall @ Z=0

• Alternative 2 –

single IR/BDS, collider hall long enough for two push-pull detectors

5 May 06

SLAC SPC

12

GDE RDR / R&D Organization

ICFA FALC GDE R & D Board ILCSC (MAC) FALC Resource Board GDE Directorate GDE Executive Committee GDE Change Control Board

GDE

GDE Design Cost Board 5 May 06 Global R&D Program

SLAC SPC

RDR Design Matrix 13

GDE RDR / R&D Organization

ICFA FALC GDE R & D Board ILCSC FALC Resource Board GDE Directorate GDE Executive Committee GDE Change Control Board GDE Design Cost Board

ILC R&D Program

5 May 06 Global R&D Program

SLAC SPC

RDR Design Matrix

ILC Design Effort

14

Superconducting RF Cavities

Chemical Polish 5 May 06 Electro Polish

SLAC SPC

15

TESLA Test Facility Linac - DESY

e beam diagnostics undulator photon beam diagnostics

240 MeV

bunch compressor e beam diagnostics laser driven electron gun superconducting accelerator modules

120 MeV 16 MeV

pre accelerator

4 MeV

5 May 06

SLAC SPC

16

RF Power: Baseline Klystrons

Thales 5 May 06 CPI

SLAC SPC

Toshiba Specification: 10MW MBK 1.5ms pulse 65% efficiency 17

ILC R&D KEK ATF

ATF2

5 May 06

SLAC SPC

18

GDE RDR / R&D Organization

ICFA FALC GDE R & D Board ILCSC FALC Resource Board GDE Directorate GDE Executive Committee GDE Change Control Board GDE Design Cost Board

ILC R&D Program

5 May 06 Global R&D Program

SLAC SPC

RDR Design Matrix

ILC Design Effort

19

Jan Frascati

From Baseline to a RDR

2006 Bangalore July Vancouver Valencia Dec Freeze Configuration Organize for RDR Review Design/Cost Methodology Review Initial Design / Cost

5 May 06

Design and Costing SLAC SPC Review Final Design / Cost RDR Document Preliminary RDR Released

20

Cost Roll-ups

Area Systems e e+ damping RTML main BDS source source rings linac Technical Systems

Vacuum systems Magnet systems Cryomodule Cavity Package RF Power Instrumentation Dumps and Collimators Accelerator Physics

Global Systems

Commissioning, Operations & Reliability Control System 5 May 06 Cryogenics CF&S

SLAC SPC

21

Damping Rings

Positrons:

– Two rings of ~6 km circumference in a single tunnel. – Two rings are needed to reduce e-cloud effects unless significant progress can be made with mitigation techniques.

• Electrons: – One 6 km ring.

COSTING

– civil – tunnels – magnets – vacuum – etc 5 May 06

SLAC SPC

22

How to involve industry?

• Large Scale Project Characterization – – – –

Large Project Management Precision Engineering International Coordination Costing

• Industrialization toward Fabrication – – – – –

Civil Construction & Infrastructure Cryogenics Superconducting RF structures, couplers, etc Electronics and Control Systems Large Scale Computing

5 May 06

SLAC SPC

23

Global Design Effort

• The baseline configuration for the ILC has been established and is document in the BCD (a 700+ page electronic document) • We have put the BCD under configuration control and are evolving it now in a controlled manner • The BCD also defines alternatives and the combination of the baseline and alternative will give good guidance for the ILC R&D program • The BCD is now being used as the starting point and basis for the reference design / cost effort this year.

5 May 06

SLAC SPC

24

International perspective

Europe is conducting a long range plan of its particle physics program under aegis of CERN Council. Report due in July 2006.

In 2003, Funding Agencies Linear Collider (FALC) was formed to help guide the international effort on ILC. FALC provides common fund for GDE activities. It is now beginning to take up issues of defining a site selection process, more formal oversight of the R&D phase, etc.

The recent initialing of the ITER agreement establishing an international organization is an excellent template for the ILC.

5 May 06

SLAC SPC

25

GDE RDR / R&D Organization

technical

ICFA

Reporting

ILCSC (MAC) FALC FALC Resource Board

resources

GDE R & D Board GDE Directorate GDE Executive Committee GDE Change Control Board GDE Design Cost Board 5 May 06 Global R&D Program

SLAC SPC

RDR Design Matrix 26

Funding Agencies for the Linear Collider

• Seventh meeting held in Fermilab on 4 November 2005 •

Representatives from CERN (President of Council and DG), Canada (NRC), France (CNRS), Germany (BMBF), Italy (INFN), Japan (MEXT), Korea (MOST), UK (PPARC) and the US (DOE) was held in Fermilab on 4 Nov 05

• The Group agreed that a Common Fund should be established to fund the administrative support required for the GDE ‘Phase 1’, with the costs to be funded equally by the three regions. The Group agreed that the use of this method of funding would not be used to prejudge the basis of any future agreements. It should only be applicable for the duration of this Common fund MOU for ‘Phase-1’. This Common Fund would be administered by Fermilab and be the subject of a MOU to be agreed by the FALC Resources group 5 May 06

SLAC SPC

27

Funding Agencies for the Linear Collider

• The Group discussed the need to minimize duplication of reporting and increase communication between the current project structure and FALC. The Chairs of ICFA and ILCSC were invited to attend future meetings of the Group and the Chair of ILCSC was invited to attend future meetings of the FALC Resources Group.

• It was agreed that a subgroup, consisting of members of FALC from all three regions, would consider the future mandate of FALC, its composition, the relationship with existing bodies required as the project moved to a more formal governance structure and mechanisms by which funds could be made available both before and after a site decision. • It was agreed that the next meeting would be held on 22 May 2006 in Rome.

5 May 06

SLAC SPC

28

Creating an International Project

• Several Studies and Plans for ILC –

ECFA EUROPEAN COMMITTEE FOR FUTURE ACCELERATORS subcomittee EUROPEAN LINEAR COLLIDER STEERING GROUP

• “Report of the Sub-group on Organizational Matters” –

Features a detailed breakdown of top level governance and project management, how they relate to each other. It is based on regional organizations; mostly in-kind contributions; shared central management, oversight, responsibility. It is concerned with Europe and how to do it within European Labs (CERN) and structures

5 May 06

SLAC SPC

29

ECFA ILC Management Scheme

5 May 06

SLAC SPC

30

Creating an International Project

• Many models of International Collaboration –

ITER is the largest project, shared by six countries. There are both lessons learned and models of how to develop international project with agreed to costing, shared management, etc. Siting was a big problem

ALMA is a joint European, U.S. and Japan project with a shared management, mostly in kind contributions, etc. Being a big array, it is straight forward to divide how many modules are contributed by partners and siting is not an issue. But, they have recently dealt effectively with management and cost issues.

5 May 06

SLAC SPC

31

ILC Timeline

2005 2006 2007 2008 2009 2010 Global Design Effort Project

5 May 06

Baseline configuration Reference Design

….

Technical Design ILC R&D Program Expression of Interest to Host International Mgmt SLAC SPC

32