Agenda
Welcome to
Hardie 101
Basic Training
Best Practices Version 6.2 – October 2012
By: Gary Griffiths
Senior Installation Specialist
James Hardie Installation Team
Products & Installation
Installation Best Practices 6.2
HardieSoffit
Text goes here
Agenda
Please Follow Along in the Best Practices:
Pages 70 – 82 in the US HZ5 Best Practices Guide Version 7.0
Pages 74 – 85 in the US HZ10 Best Practices Guide Version 7.0
Pages 57 – 63 in the Canada HZ5 Best Practices Version 6.2
HardieSoffit
Text goes here
Agenda
HardieSoffit Product Description
HardieSoffit
Text goes here
Agenda
HardieSoffit Product Options
HardieSoffit
Text goes here
Agenda
HardieSoffit Boards - Product Description
Did You Know?
HardieSoffit Boards  HardieSoffit is available in 12 foot & 8 foot lengths.
 Available in commonly-used nominal widths 12”, 16”, &
24”
 HardieSoffit is ¼” thick.
 Available in Smooth or Select Cedarmill Textured Finish.
 HardieSoffit is available in both Vented & Non-Vented
Profiles.
 Vented HardieSoffit panels provide 5 SqFt of net free
ventilation per lineal foot of soffit.
HardieSoffit
Text goes here
Agenda
HardieSoffit Boards – Installation Requirements
Did You Know?
HardieSoffit Boards – Standard Soffit
 HardieSoffit panels must be attached to solid
framing (typically 2x4 supports spaced no more
than 24” oc)
 HardieSoffit runs lengthwise in the eaves, with the
panel width (12”, 16” or 24”) running from the
building out.
 Eave framing must include a Subfascia, rafter/truss
blocking, and/or a ledger board on the wall to
provide solid nailing along the long dimension of
the soffit.
 ALL Panel Edges MUST be Supported.
HardieSoffit
Text goes here
Agenda
HardieSoffit Boards – Installation Requirements
Did You Know?
HardieSoffit Boards – Gable Rake Soffit
 For rake overhangs on gable ends 2x “lookouts”
spaced a maximum of 24” oc should be installed to
support a rake Subfascia to provide adequate nailing
for the rake HardieSoffit.
 Install blocking between the lookouts or run a
continuous ledger on the wall to provide support for
the HardieSoffit at the building.
“Ledger”
“Lookouts”
HardieSoffit
Text goes here
Agenda
HardieSoffit Boards – Installation Requirements
Did You Know?
HardieSoffit Boards – 4 Approved Joint Treatments
 There are Four (4) Approved Joint Treatment methods for joining the lengths of HardieSoffit panels
together.
1. HardieSoffit Panel Joints may be lightly butted together in moderate contact.
2. HardieSoffit Panel Joints may be covered with batten strips.
3. HardieSoffit Panel Joints may be joined with a PVC or Metal H molding or Trim.
4. HardieSoffit Panel Joints may be gapped 1/8” and caulked (Primed Product ONLY)
1
2
3
4
HardieSoffit
Text goes here
Agenda
Installation of HardieSoffit Panels
Preparation for HardieSoffit Panels: Required Framing
Fig 1.1
When Installing the Soffit:
1)
Straighten the rafter tails by pulling and snapping a
chalk line across the ends of the tails and then
trimming them as necessary. (Figure 1.1)
2)
Install a solid wood sub-fascia on the ends of the
rafter tails or install blocking between the rafter tails
as needed. (Figure 1.2)
Fig 1.2
3)
In order to close in the soffit area, add nailers at
every rafter or truss to provide support.
“Nailer”
HardieSoffit
Text goes here
Agenda
Installation of HardieSoffit Panels
Preparation for HardieSoffit Panels: Positioning & Fastening
When Installing the HardieSoffit Panels:
1)
If the eaves are longer than 12’, measure and trim the
first HardieSoffit panel making sure that the end falls
in the middle of a nailer.
2)
Using the sub-fascia as a guide along the edge,
carefully position the panel and secure with 4d
common galvanized nails spaced no greater than
8”oc at all panel edges and on all intermediate
framing members.
3)
Continue with additional pieces until the run is
complete. Remembering to keep the vent strip to the
outside of the eave.
HardieSoffit
Text goes here
Agenda
Installation of HardieSoffit Panels
o
Preparation for HardieSoffit Panels: 45 Hip Roof Framing
Hip roof soffits continue level around the corners of the
house. The soffit panels should join at the corner with
two 45o angle cuts.
To Create these Corners:
1)
First measure from the corner to the perpendicular
framing member closest to, but not over 12’ feet.
2)
Using that measurement and pulling from the factory
cut end of the soffit panel, mark the outside edge of
the soffit panel for the long point of the 45o cut.
3)
After cutting the 45o angle, position the panel on
the soffit framing and check the fit on both ends
before fastening.
4)
Begin nailing at the 45o cut end and work toward
the factory end.
1
2
HardieSoffit
Text goes here
Agenda
Installation of HardieSoffit Panels
o
Installed HardieSoffit Panels: 45 Hip Roof Mitered Examples
Incorrectly Installed HardieSoffit
Venting MUST be installed to the Fascia NOT the wall.
- Shown with optional H Channel
Correctly Installed HardieSoffit
- Shown with optional Batten Strip
HardieSoffit
Text goes here
Agenda
Installation of HardieSoffit Panels
Soffit to Wall Treatment Options for HardieSoffit Panels:
In addition to the frieze board treatments described above, there are several
other options for finishing the juncture where the siding meets the soffit.
CAULK THE SIDING/SOFFIT JOINT:
 A fast and economical method of finishing the siding/soffit juncture is
simply to run a bead of quality permanently flexible caulk along the top edge of
the siding where it meets the soffit. Make sure the last piece of siding installed
is ripped straight so it looks aesthetically pleasing.
OVER THE TOP OF THE SIDING WITH “J” CHANNEL:
 Once the Soffit is in place, install a vinyl “J” channel upside
down with the base of the “J” against the soffit. Then rip the final
course of siding so that it fits inside the channel.
INSTALL AN EXTERIOR CROWN MOLDING OR CORNICE TRIM:
 Crown molding or trim is another way of finishing and sealing the
soffit/siding juncture, install and finish the crown molding or trim according to
the manufacturer’s specifications.
HardieSoffit
Text goes here
Agenda
Installation of HardieSoffit Panels
HardieSoffit Panels: Installation of additional Insect Screen (where required)
When Installing Additional Insect Screen in the Soffit:
1)
Cut insect screen so it covers the vented portion of the
HardieSoffit.
1)
Ensure the insect screen laps by 1 – 2 inches over the nonvented portion of the HardieSoffit Panel.
2)
Secure the insect screen to the backside of the vented
portion of the HardieSoffit using a bead of construction
adhesive.
1-2 inches
HardieSoffit
Text goes here
Agenda
Installation of HardieSoffit Panels
HardieSoffit Panels: Required Fasteners & Fastener Spacing
When Fastening HardieSoffit:
1)
Ensure all Panel Edges break on solid wood framing.
2)
Fastener Spacing is 8” oc into solid framing members spaced no
further apart then 24” oc maximum.
3)
Keep Fasteners 2” from corners and 3/8” in from HardieSoffit
Panel Edges.
4)
Stainless Steel Fasteners are always recommended when
installing all James Hardie Products.
8” Inches
HardieSoffit
Text
goes here Requirements
Installation
Agenda
Please Reference the Installation Requirements found on:
Pages 76 – 82 in the US HZ5 Best Practices Guide Version 7.0
&
Pages 80 – 85 in the US HZ10 Best Practices Guide Version 7.0
&
Pages 61 – 63 in the Canada HZ5 Best Practices Version 6.2
Begin the
HardieSoffit Installation Requirements
Knowledge Test
Installation Best Practices 6.2
KNOWLEDGE TEST RESULTS
Text
goes here
Agenda
HardieSoffit Installation Requirements:
1.
Vented HardieSoffit panels provide how many net free square
inches of ventilation per foot?
4.
Which of the following methods can be used to properly treat
soffit joints?
a)
b)
c)
d)
2.0
3.0
5.0
12.0
a)
b)
c)
d)
e)
Moderate Contact
1/8” gap and caulk (prime products only)
Batten Strips
H-Molding
All of the Above
5.
A full headed nail must be used to install HardieSoffit panels?
a)
b)
True
False
6.
The Addition of insect screen over the already vented section of
the HardieSoffit will reduce the net airflow?
2.
When installing vented HardieSoffit panels you should install
venting to the outside of the eave?
a)
b)
True
False
3.
a)
b)
c)
d)
HardieSoffit panels may be installed over steel or wood framing
min. 2x4 members spaced a maximum of how many inches
apart?
6”
12”
24”
36”
a)
b)
True
False
General Installation
Text
goes here
Requirements
Agenda
12 Critical Details to a Quality Installation
 Page 13 in your
Best Practices
Guide.
 All 12 items are
Critical to the Long
Term Quality,
Durability and
Installation
Compliance.
 Most Important
Page in your Best
Practices Guide