May 20, 2009
1
Agenda












Introductions TUSD & Qwest
Clarifications to RFP 09-03-13 QMOE Project
Site Detail – Customer Responsibility – Entrance Facility
Handout of Specifications
District Level Design Drawing
QMOE Network Component Drawing
Phase I Visio Drawing
Year I Project Timeline Estimates
Year I Project Notes
Phase I, II, III Visio Drawing
Cisco Equipment List ( CPE)
Questions and Answers
2
Introductions-Qwest Team




Lynda Santoro
Jim Sanchez
Ed Ruskys
Chris Brown
Sales Manager II
Global Account Manager
Sales Engineer
Project Manager
3
Clarifications to RFP 09-03-13
 Purpose: “Is to receive clarification on Qwest’s proposal (Existing Contract) in
order for TUSD to implement the project”
 Question: “ What is included in the Qwest QMOE Proposal that was awarded”?
4
Clarifications to RFP 09-03-13
Answer:
QMOE service to all locations at the awarded bandwidth specifications which
are 100 Mbps Elementary, 300 Mbps Middle Schools, 500 Mbps High Schools,
Morrow Center at the Gbps bandwidth level including Protect Route and QOS.
Monthly Recurring Charges & Components: QMOE, Cisco Equipment, Taxes
and Special Billing. When complete, MRC will be: $213,313.
Year 1 Monthly
$100,233
Year 2 Monthly
$163,403
Year Monthly
$213,313
Non Recurring Charges & Components: Special Construction Charge
($298,000), QMOE Install and Cisco Equipment Install ($187,400). Year 2 & 3
the same components. Total: $485,400
Year 1
$200,400
Year 2
$225,500
Year 3
$59,500
5
Clarifications Continued
 Question: “Who is responsible for the pathway from Qwest’s pop to the
router at the sites”? “Proposal indicates Qwest is responsible”
 Answer: Qwest is responsible for providing fiber up to the property line.
The charge of $485K is a one time charge which has been split over 3
years and has been included in your E-Rate submission. (See previous
slide for components)
 Question: “What schools require the pathway and what schools already
have it installed”?
 Answer: These sites have existing fiber paths and will not require further
entrance facilities. Morrow Center, Sahuaro H.S., Palo Verde H.S., Pistor
Middle School, Rincon H.S. All other locations will require a site visit to
determine where on the property line Qwest will meet your facilities.
6
District Level Design
Qwest Proprietary and Confidential
7
QMOE Network Components
8
QMOE Network Components – TUSD Design
Circuit policed to only allow
subscribed BW into the network
Circuit policed to only allow
subscribed BW into the network
QMOE Cloud
Host Site
SD
SM Fiber
3750-Metro
6509-NEBS
6509-NEBS
CISCOSYSTEMS

Remote School
SD
SM Fiber
3750-Metro
CISCOSYSTEMS
Catalyst 6500
SERIES

Catalyst 6500
SERIES
SD
6509-NEBS
CISCOSYSTEMS

Catalyst 6500
SERIES
3750-Metro
Catalyst 65XX
Demarc
Demarc
Traffic shape to subscribed
BW at the customer edge
Qwest Proprietary and Confidential
Traffic shape to subscribed
BW at the customer edge
9
Site Detail
Customer responsible for conduit with pullstring from property line to building MPOP.
Entrance Example
10
Typical Room Layout
11
Customer Responsibility-Entrance Facility Highlights








Customer will meet Qwest at the property line
Customer will provide a 4” conduit with a pull string
Conduit /Inner-duct must pass National Electric Code and all city codes
Customer must provide a suitable environment for the equipment.
Customer must provide a dust free environment & air conditioned room.
Customer must provide adequate lightning.
Customer must provide AC power.
Customer must provide adequate space on a backboard for all equipment.
 Project Manager-Chris Brown will work with TUSD on entrance facility
specifications. ( Please see “Customer Premise Responsibilities” Handout
for a complete list of responsibilities)
12
Year 1 – Project Timeline
Location Name
Pistor
Sahuaro
Rincon
Morrow Center
Pueblo
LIRC
Catalina
Cholla
Ajo Service
Banks
Grijalva
Hohokam
Johnson
Lawrence
Lynn
Maldonado
Miller
Robins
Rose
Valencia
Vesey
Warren
White
Howenstine
Tucson
Palo Verde
Sabino
Santa Rita
Address
Bandwidth Profile
5455 S. Cardinal Ave
545 N. Camino Seco
421 N. Arcadia Blvd
1010 E. 10th St.
3500 S. 12th St.
2025 E. Winsett
3645 E. Pima
2001 W. Star Pass Blvd
2201 W. 44th St.
3200 S. Lead Flower
1795 E. Drexel Rd
7400 S. Settler Rd.
6060 S. Joseph Ave.
4850 W. Jeffrey Ave.
1573 W. Ajo Way
3535 W. Messala Way
6951 S. Cmo De La Tierra
3939 N. Magnetite
710 W. Michigan Dr.
4400 W. Irvington
5005 S. Butts Rd.
3505 W. Milton Rd.
300 Mbps
500 Mbps
500 Mbps
2 Gbps
500 Mbps
2 Gbps
500 Mbps
500 Mbps
100 Mbps
100 Mbps
100 Mbps
300 Mbps
100 Mbps
100 Mbps
100 Mbps
100 Mbps
100 Mbps
100 Mbps
100 Mbps
300 Mbps
100 Mbps
100 Mbps
2315 W. Canada St.
555 W. Tucson Blvd
400 N. Second Ave.
1302 S. Avenida Vega
5000 N. Bowes Rd.
3951 S. Pantano Rd.
100 Mbps
500 Mbps
500 Mbps
500 Mbps
500 Mbps
500 Mbps
Estimated
Port Speed
Order of Priority
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1
1
1
1
2
2
2
2
3
3
3
3
4
4
4
4
5
5
5
5
6
6
Jul-09
Jul-09
Jul-09
Jul-09
Oct-09
Oct-09
Oct-09
Oct-09
Jan-10
Jan-10
Jan-10
Jan-10
Apr-10
Apr-10
Apr-10
Apr-10
Jul-10
Jul-10
Jul-10
Jul-10
Oct-10
Oct-10
6
6
7
7
7
7
Oct-10
Oct-10
Jan-11
Jan-11
Jan-11
Jan-11
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
1000 Mbps
Turn Up Dates
13
Year 1 – Project Notes

Red sites denote priority sites with a high demand for bandwidth and also represents the fastest
install install for Hub Site locations.

Beginning in Jul-09 we will complete 4 sites every 90 days until complete.

Site survey’s can be completed and priced within 2 weeks or sooner to determine entrance facility
costs.

Monthly Billing to occur as QMOE sites are turned up.

Install charges occur as QMOE sites are turned up.

Existing DS1’s and charges will be removed when the TUSD request is made.

QOS may be deferred until QMOE is completely installed.

Per existing contract, TUSD has agreed to pay Qwest $200,400 to begin the Year 1 QMOE project.

As an option, Qwest is willing to defer the $200,400 until the first 8 sites have been installed. (Last
of the priority sites)
14
TUSD Phase I
PHASE 1
Tucson Unified School District QMOE Network
Robins ES
3939 N Magnetite
Rose ES
710 W Michigan Dr
Johnson ES
6060 S Joseph Ave
Valencia MS
4400 W Irvington
Pistor MS
5455 S Cardinal Ave
Grijalva ES
1795 E Drexel
Lawrence ES
4850 W Jeffrey Road
White ES
2315 W Canada Dr
Miller ES
6951 S Cmo De La Tierra
Lynn-Urquides ES
1573 W Ajo Way
Vessey ES
5005 S Butts Rd
Banks ES
3200 S Lead Flower
Hohokam MS
7400 S Settler Rd
Maldanado ES
3535 W Messala Way
Warren ES
3505 W Milton Rd
Ajo Way Service Ctr
2201 W 44th St.
Santa Rita HS
3951 S Pantano Rd.
LIRC SC
2025 E Windett
Sahuaro HS
545 N Camino Seco
TCSNAZSO
Tucson High Magnet HS
400 N Second Ave
TCSNAZSW
TCSNAZWE
Pueblo Magnet HS
3550 S 12th Ave.
Cholla Magnet HS
2001 W Star Pass
TCNSAZMA
TCSNAZRN
TCSNAZCR
Morrow Center SC
1010 E 10th St.
TCSNAZEA
Sabino HS
5000 N Bowes Rd.
Palo Verde Magnet HS
1302 S Avenida Vega
= 100Mbps BW
= 300Mbps BW
= 500Mbps BW
= 1000Mbps BW
Tucson Unified School District – Phase 1
Qwest Metro Optical Ethernet (QMOE) Network
Howenstine Magnet HS
555 S Tucson Blvd
Rincon HS
421 N Arcadia Blvd
Catalina Magnet HS
3645 E Pima
Proprietary Information
Not for disclosure outside of Qwest Communications and
Tucson Unified School District without written permission
Date:
3/31/2009
Engineer:
15
All Phases
Tucson Unified School District QMOE Network
Robins ES
3939 N Magnetite
Dunham ES
9850 E 29th St.
Gridley MS
350 S Harrison
Henry ES
650 N Igo Way
Hudlow ES
502 N Caribe
Gale ES
678 S Gollub Rd.
Soleng Tom ES
10520 E Camino Quince
Steele ES
700 S Sarnoff Dr.
Secrist MS
3400 S Houghton Rd.
Fruchtendler ES
7470 E Cloud Rd.
Booth-Fickett MS
450 S Montego Dr
Van Horne ES
7550 E Pima
Santa Rita HS
3951 S Pantano Rd.
Dietz ES
7575 E Palma
Sahuaro HS
545 N Camino Seco
Ford ES
8001 E Stella
Dodge Trad Magnet MS
5831 E Pima
Bloom ES
8310 E Pima
Magee MS
8300 E Speedway
Wrightstown ES
8950 E Wrightstown
Schumaker ES
501 N Maguire
Marshall ES
9066 E 29th St.
Eastside Trans SC
9300 E Broadway
Johnson ES
6060 S Joseph Ave
Valencia MS
4400 W Irvington
Pistor MS
5455 S Cardinal Ave
Grijalva ES
1795 E Drexel
Lawrence ES
4850 W Jeffrey Road
White ES
2315 W Canada Dr
Miller ES
6951 S Cmo De La Tierra
Lynn-Urquides ES
1573 W Ajo Way
Vessey ES
5005 S Butts Rd
Banks ES
3200 S Lead Flower
Hohokam MS
7400 S Settler Rd
Maldanado ES
3535 W Messala Way
Warren ES
3505 W Milton Rd
Ajo Way Service Ctr
2201 W 44th St.
TCSNAZSO
TCSNAZSW
TCSNAZWE
TCNSAZMA
TCSNAZRN
TCSNAZCR
Naylor MS
1701 S Columbus Blvd
Vail MS
5350 E 16th St.
Sabino HS
5000 N Bowes Rd.
Mayers-Ganoung ES
5000 E Andrew
Carson MS
7777 E Stella Rd.
Palo Verde Magnet HS
1302 S Avenida Vega
Kellond ES
6606 E Lehigh Dr.
Collier ES
3900 N Bear Canyon
Reynolds ES
7450 E Stella Rd.
Wheeler ES
1818 Avenida Del Sol
= 100Mbps BW
= 300Mbps BW
= 500Mbps BW
= 1000Mbps BW
Rose ES
710 W Michigan Dr
TCSNAZEA
Howenstine Magnet HS
555 S Tucson Blvd
Rincon HS
421 N Arcadia Blvd
Catalina Magnet HS
3645 E Pima
Townsend MS
2120 N Beverly
Roberts ES
4355 E Calle Aurora
Whitmore ES
5330 E Glenn
Robison ES
2745 E 18th St.
Lineweaver ES
461 S Bryant
Doolen MS
2400 N Country Club
Corbett ES
5949 E 29th St.
Erickson ES
6750 E Stella Rd.
Hughes ES
700 N Wilson
Jefferson Park ES
1701 E Seneca
Wright ES
4311 E Linden
Rosemont Service Center
750 N Rosemont
Borman ES
6630 Lightning Dr.
Rogers ES
6000 E 15th St.
Bonillas Magnet ES
4757 E Winsett
Blenman ES
1695 N Country Club
Cragin ES
2945 N Tucson Blvd
Fort Lowell ES
515 E Pima
Lyons ES
7555 E Dogwood
Sewell ES
425 N Sahuaro
Howell ES
401 N Irving
Duffy ES
5145 E. 5th Ave
Davidson ES
3915 E Ft Lowell
Phase 1
Phase 2
Phase 3
Tucson Unified School District
Qwest Metro Optical Ethernet (QMOE) Network
Proprietary Information
Not for disclosure outside of Qwest Communications and
Tucson Unified School District without written permission
Date:
Artworks Academy
140 N Main
Carillo Magnet ES
440 S Main Ave
PASS Alternative HS
2102 E Broadway
Drachman Montessori ES
1089 S 10th St
Tolson ES
1000 S Greasewood
Menlo Park ES
1100 W Fresno
Utterback Magnet MS
3233 S Pinal Vista
Holladay ES
1110 E 33rd St.
Miles ES
1400 E Broadway
Hollinger ES
150 W Ajo Way
Project MORE HS
440 South Park
Tully Accelerated ES
1701 W El Rio Dr.
Wakefield MS
101 W 44th st.
Brichta ES
2110 W Brichta Dr.
LIRC SC
2025 E Windett
Cavett ES
2120 E Naco Vista
Tucson High Magnet HS
400 N Second Ave
Pueblo Gardens ES
2210 E 33rd St
Pueblo Magnet HS
3550 S 12th Ave.
Mission View ES
2600 S 8th Ave
Cholla Magnet HS
2001 W Star Pass
Davis Bilingual ES
500 W St. Mary’s
Morrow Center SC
1010 E 10th St.
Safford Eng/Tech MS
200 E 13th St.
Maxwell MS
2802 W Anklam
Richey K-8 ES
2209 N 15th Ave
Mansfield MS
1300 E. 6th St.
Borton Magnet ES
700 E 22nd Ave
Starr Center SC
102 N Plumer
Van Buskirk ES
725 E Fair
Drake Alternative MS
445 South Park
Roskruge ES
501 E 6th St.
Manzo ES
855 N Melrose
Ochoa ES
101 W 25th St.
Safford ES
200 East 13th St.
Oyama ES
2700 S La Cholla
3/31/2009
Engineer:
16
Customer Premise Equipment (CPE)
Product
Description
Qty
HUB SITES
WS-C6506-E
S733AIK9-12233SXH
WS-SUP720-3B
CF-ADAPTER-SP
MEM-C6K-CPTFL512M
WS-X6724-SFP
MEM-XCEF720-256M
WS-F6700-CFC
GLC-SX-MM
WS-X6748-GE-TX
MEM-XCEF720-256M
WS-F6700-CFC
WS-C6506-E-FAN
WS-CAC-6000W
CAB-AC-C6K-TWLK
MEM-C6K-CPTFL512M
BF-S720-64MB-RP
MEM-S2-512MB
MEM-MSFC2-512MB
CON-SNT-WS-C6506
F-PV-MM-SCLC-10
Catalyst 6500 Enhanced 6-slot chassis,12RU,no PS,no Fan Tray
Cisco CAT6000-SUP720 IOS ADVANCED IP SERVICES SSH
Catalyst 6500 / Cisco 7600 Supervisor 720 Fabric MSFC3 PFC3B
SP adapter for SUP720 and SUP720-10G
Catalyst 6500 Sup720/Sup32 Compact Flash Mem 512MB
Catalyst 6500 24-port GigE Mod: fabric-enabled (Req. SFPs)
Catalyst 6500 256MB DDR, xCEF720 (67xx interface, DFC3A)
Catalyst 6500 Central Fwd Card for WS-X67xx modules
GE SFP, LC connector SX transceiver
Cat6500 48-port 10/100/1000 GE Mod: fabric enabled, RJ-45
Catalyst 6500 256MB DDR, xCEF720 (67xx interface, DFC3A)
Catalyst 6500 Central Fwd Card for WS-X67xx modules
Catalyst 6506-E Chassis Fan Tray
Cat6500 6000W AC Power Supply
Power Cord, 250Vac 16A, twist lock NEMA L6-20 plug, US
Catalyst 6500 Sup720/Sup32 Compact Flash Mem 512MB
Bootflash for SUP720-64MB-RP
Catalyst 6500 512MB DRAM on the Supervisor (SUP2 or SUP720)
Catalyst 6500 512MB DRAM on the MSFC2 or SUP720 MSFC3
5 years 8x5xNBD Service, Catalyst 6506
SC-LC Multi-mode patch cable, 10 meters[12]
Qwest Proprietary and Confidential
2
2
2
2
2
2
2
2
4
2
2
2
2
4
8
2
2
2
2
2
4
17
Customer Premise Equipment (CPE)
Product
Description
Qty
REMOTE SITES
ME-C3750-24TE-M
ME C3750 24 10/100+2SFP+2SFP ES Prt (no-pwr): Std ME SW Img
106
ME3750-IPSVC-LIC
IP Services Feature License for Catalyst 3750 Metro
106
PWR-ME3750-AC
Configurable ME-C3750 AC Power Supply
106
PWR-ME3750-AC-R
Metro Catalyst 3750 redundant AC power supply (configurable)
106
CAB-AC
Power Cord,110V
212
19INCH-BRKT-1RU
19-inch brackets for mounting 1 RU Catalyst switches
106
CON-SNT-ME3750M
5 years 8x5xNBD Smartnet, Catalyst 3750-ME
106
GLC-SX-MM
GE SFP, LC connector SX transceiver
106
SC-LC Multi-mode patch cable, 10 meters[12]
106
F-PV-MM-SCLC-10
Qwest Proprietary and Confidential
18
Questions ?