Transcript Professional Training Product Management
Professional Training Product Management Installing stick down floors with PVC backing
INSTALLING STICK DOWN FLOORS WITH PVC BACKING
WoodComfort glue down HPS (Series 4000) CorkComfort glue down HPS (Series 2000)
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing GENERAL INFORMATION Please read these instructions thoroughly in conjunction with relevant country standards before starting the installation.
Transport, storage and acclimatisation:
Transport and store the cartons in laying position
Store the tiles at room temperature for at least 48 hours, still in their packaging, prior to commencing work.
Do not remove the plastic wrapping from the packaging until ready to install the floor.
The room temperature must be at least 18ºC (65ºF) before and during installation.
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing Inspection:
Prior to installation, please inspect the tiles in daylight for any visible faults or damage, and also check if the subfloor and site conditions are in accordance with the specifications described within these instructions
If you are not satisfied do not install, and contact your supplier
Amorim cannot be held responsible for claims associated with improper sub-floors or applications, or the use of any auxiliary products that are not recommended.
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing Subfloor requirements : General:
A. R. stick down floors with PVC backing can be installed in interior installation sites to on or above grade concrete or wooden sub-floors
In the case of any other type of subfloor, please contact your supplier
The subfloor must be levelled, permanently dry, clean and free from anything that may impair adhesion
Use only primers and levelling compounds suitable for the existing subfloor.
Radiant-Heated Subfloors:
For A. R. stick down floors with PVC backing , the surface temperature of the subfloor must not exceed 28 °C (82°F)
For detailed information, follow the instructions supplied by the subfloor heating system manufacturer/contractor or contact your supplier.
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing Moisture protection:
Despite it's age there is always a risk of moisture in subfloors
For that reason it is necessary to ensure that an efficient moisture barrier is installed
The moisture content of concrete subfloors should be as indicated below (when using a CM measuring instrument):
Cement-screed
without floor heating:
with integrated floor heating:
Gypsum/Anhydrite-screed
without floor heating:
with integrated floor heating: > 2,0 CM% > 0,5 CM% > 0,5 CM% > 0,3 CM%
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing Preventive care:
If works will take place in the room where the floor is installed, protect with craft paper, plywood or hardboard
Do not drag furniture across the floor
Use felt pads on chair and furniture legs
Office roller chairs must comply with DIN 68131
Place quality walk-off mats at all entrances to retain tracked in dirt, grit and moisture
Never use latex or rubber backed mats as they can permanently stain the floor
Avoid moisture on the floor
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing
Ideal and healthy room conditions are 40 - 60 % R.H. at 20 °C (68°F)
When using intensive room heating, the indoor air humidity may drop so low that the floor is prone to dry out
As cork and wood are natural material, this may cause shrinkage of the tiles that will result in minor gaps in the flooring joints - use a room humidifier to prevent this
Cork as a natural material may tend to fade, Wood as a natural material may tend to mellow/darken when exposed to sunlight- use blinds, curtains or other sunscreening system to minimise this effect.
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing Tools required:
Recommended notched trowel
Tape measure
Craft knife
Pencil
Straight edge
Chalk line
Cloth
Rubber hammer
50 Kgs Multi-Part roller
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing
B A A1 90º B1
Measurements:
Find the centre of the room using a chalk line, from the middle of wall A to the middle of A1, then make a line from the middle of wall B to the middle of wall B1
Check that the intersection of the two lines forms a 90 ° angle
If laying in diagonal, mark two diagonal lines starting from the intersection point, dividing the 90º angle in half (forming like this a 45º angle).
Measurement check:
Check the room dimension by measuring or placing the tiles (without gluing), from the middle
Make sure that the widths of the tiles that will be near the wall are identical and greater than 5 cm
If necessary repeat the previous step by drawing new parallel lines to the first ones
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing Laying:
Only use Wicanders W-336 adhesive for installation (wet set method) and recommended notched trowel (A2)
Follow the instructions on the adhesive package
Install the tiles from the centre along the marked line, preferably using "brick-bond" system
Place tiles side by side without pushing too tightly together
Lightly press each tile down by hand
Remove any excess adhesive with a damp cloth or white spirit.
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing Important:
In order to ensure adhesion, spread only adhesive on an area which can be installed within the recommended adhesive open time.
Adhesive transfer:
The backing of the tiles has to be moistened with adhesive to ensure a good adhesion _ check this by lifting one tile.
Rolling the floor:
After each section has been laid and tiles do not slide underfoot (approx. 30 min.), the floor must be rolled diagonally with a multi-part roller (minimum 50 kg) to ensure complete transference of the adhesive to the tile backing
Roll again the entire area after completion of installation
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing Last row
Cut the tiles near the wall as indicated On-site cutting:
Each tile has sealed edges
Whenever you cut a tile, the edges become unprotected
Seal the edges by using a D3 class PVA adhesive (ex. Wicanders W-185) or another type of suitable edge sealer.
Amorim Revestimentos, S.A.
Professional Training Product Management Installing stick down floors with PVC backing Cleaning and Maintenance
Use only the recommended products
For correct use follow the instructions on the packaging labels of each product.
Amorim Revestimentos, S.A.