TAKING THE CTCB EXAM BY: TOM DEROSA, CTCB & MATT STROM, CTCB GENERAL INFORMATION AND CERTIFICATION POLICIES          BACKGROUND INFORMATION MISSION STATEMENT CERTIFICATION POLICIES REVOCATION OF CERTIFICATION REVIEW AND APPEAL USE OF LOGO REFUND POLICY CONFIDENTIALITY.

Download Report

Transcript TAKING THE CTCB EXAM BY: TOM DEROSA, CTCB & MATT STROM, CTCB GENERAL INFORMATION AND CERTIFICATION POLICIES          BACKGROUND INFORMATION MISSION STATEMENT CERTIFICATION POLICIES REVOCATION OF CERTIFICATION REVIEW AND APPEAL USE OF LOGO REFUND POLICY CONFIDENTIALITY.

TAKING THE
CTCB EXAM
BY:
TOM DEROSA, CTCB
&
MATT STROM, CTCB
GENERAL INFORMATION
AND
CERTIFICATION POLICIES









BACKGROUND INFORMATION
MISSION STATEMENT
CERTIFICATION POLICIES
REVOCATION OF CERTIFICATION
REVIEW AND APPEAL
USE OF LOGO
REFUND POLICY
CONFIDENTIALITY POLICY
HARDSHIP POLICY
ELIGIBILITY REQUIREMENTS
 MUST HAVE A MINIMUM OF 3 YEARS
OF BROAD-BASED EXPERIENCE IN
TENNIS COURT CONSTRUCTION
 FOR INITIAL CERTIFICATION :
 1. 100 ELIGIBILITY POINTS
 2. 50% WITHIN LAST 3 YEARS
 3. 50% NO TIME LIMIT(3+…LIFE)
TENNIS ELIGIBILITY
SPEADSHEET

1.
2.
3.
4.
PROJECT ADMINISTRATION
 MINIMUM 5 POINTS
Prepare bids and proposals - .2 pts per project
Prepare/review change orders, owner billings,
subcontractor billings, job costs - .2 pts per project
Plan & schedule crews, subs and material deliveries
- .2 pts per project
Supervise project - .2 pts per project
TENNIS ELIGIBILITY
SPEADSHEET
 SITE, SUB-BASE AND BASE WORK
 MINIMUM 15 POINTS
 1. Identify site issues (soils, drainage, obstructions,
access) - .5 pts per project
 2. General site design (survey, calculate elevation and
grade, construction staking) - .5 pts per project
 3. Prepare site (excavation, grading slope stabilization,
drainage, utilities) - .5 pts per project
 4. Install base (fine grading, sterilant, geo-textile,
crushed aggregate, paving) - .5 pts per project
TENNIS ELIGIBILITY
SPEADSHEET
 CONSULT WITH OWNER OR DESIGN
PROFESSIONAL
 MINIMUM 15 POINTS
 1. Plan and design a new tennis court project or
renovation (facilities use issues, dimensions,
orientation, drawings specifications, samples, multiple
court batteries, net post location, budget, elevation,
slope, lighting, fencing) – 1.0 point per project
TENNIS ELIGIBILITY
SPEADSHEET
 TENNIS COURT COATINGS, FENCING
AND LIGHTING
 MINIMUM 15 POINTS
 1. Install court surface (materials required, patching,
lines) - .2 pts PER COURT
 2. Install tennis court equipment (fencing, net posts,
lighting, windscreen) .1 point PER COURT
TENNIS ELIGIBILITY
SPEADSHEET
 TENNIS COURT MAINTENANCE
AND REPAIR
 MINIMUM 5 POINTS
 1. Analyze reasons for failures - .1 point PER COURT
 2. Recommend products and systems to increase life
of court - .1 point PER COURT
JOB LIST





JOB NUMBER__________
Name______________________________
Year_____ New Construction__ Repair/Renovation__
Contact Name_______________________
Phone_______________ E-Mail_________________





JOB NUMBER__________
Name______________________________
Year_____ New Construction__ Repair/Renovation__
Contact Name_______________________
Phone_______________ E-Mail_________________
The Exam






When?
What to expect?
Format
Preparation
Scoring
Sample Questions
TENNIS
1. The proper minimum dimension of the net center strap anchor is?
A. 18” x 18” x 18” cube
B. 12” in diameter, 12” deep
C. 12” x 12” x 12” cube
D. 18” in diameter, 36” deep
2. A customer would like a 2-color layout on his new standard size single acrylic surface tennis court.
The manufacturer of the 3-coat color system recommends that the 2 final color coats be installed at
the application rate of .05 gallons per square yard per coat of undiluted material. How much job mixed
color will be needed for the completion of the inbound area if the manufacturer recommends the
material be cut with 50% water?
A. 23 gallons
B. 31 gallons
C. 35 gallons
D. 47 gallons
3. An owner has a standard four-court battery (204’ x 120’) of asphalt tennis courts that he wants to
convert to fast dry. If the original courts have zero slope and the fast dry courts are to be installed with
a minimum of 4” of stone on the low side and .28% slope in the 120’ direction, how much stone will be
needed to establish the stone base before the fast dry is applied? (stone density is 150 pounds/cubic
foot compacted)
A. 605 tons
B. 918 tons
C. 1144 tons
D. 1224 tons
TENNIS ANSWERS
 Question Number 1 – B (pg. 94 of manual)
 Question Number 2 – D (36’ x 78’ / 9 = 312 s.y.
at .10 = 31.2 gallons * 1.5 = 46.8 gallons)
 Question Number 3 – B (204’ x 120’ = 24480
s.f. .28% slope in 120’ equals 4” fall 4”
minimum thickness on the low side means 8”
thickness on the high side. Therefore, the
average thickness is 6”. 24480 * .5 * 150 /
2000 = 918 tons)
A Certified Tennis Builder





3 Year Term
Individual / Not Company Certification
Use of the ASBA Logo
Legal advantage in Bid Documents
Personal Pride
RE-CERTIFICATION
REQUIREMENTS
 Eligibility Requirements
 Must be actively engaged in the Industry
 Must have 50 points in:
 1. 3 of the 5 areas on Eligibility Form
 2. For projects completed in Last 3 years.
 Re-certify by Exam in lieu of points
Re-Certification by
Continuing Education
 Must have 40 points within 3 year period
 1. 25 points must be from ASBA related
activities
 2. Industry related articles
 3. Presentations / Seminars in Industry
related programs aimed at owners, end
users or interested parties.
 4. Participating in research in Tennis Courts
IF CERTIFICATION EXPIRES
 Points will NOT be accepted to regain
certified status except in the case of
Hardship
 1. Provide written documentation of the
Hardship
 2. Explain in writing how the hardship
prevented one from completing the process
within the published timeframe
 3. Pay a fee of $50.00 for extension
 4. Must be submitted by Dec. 31st
 5. Extension will not be considered if filed
after Jan. 31st
QUESTIONS